ML20198H839
| ML20198H839 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 01/03/1986 |
| From: | Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| REF-PT21-86-036-000 PT21-86-036-000, PT21-86-36, SPR-85-020, SPR-85-20, NUDOCS 8601310105 | |
| Download: ML20198H839 (2) | |
Text
South Carolina Electric & Gas Company D n A. N:uman P.O Boa 764 Vice President Columbia. SC 29218 Nuclear Operations (803) 748-3513 SCE&G January 3, 1986 0J/C 7
?l2 l 2 0 Dr.
J.
Nelson Grace Regional Administrator U.S.
Nuclear Regulatory Commission Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323
SUBJECT:
Virgil C.
Summer Nuclear Station Docket No. 50/395 Operating License No. N P F-12 Special Report (SPR 85-020)
Dear Dr. Grace:
Attached is a Special Report for the Virgil C.
Summer Nuclear Station.
This report is submitted pursuant to the requirements of Section 6 of the Technical Specifications.
Sh ou ld there be any questions, please call us at your convenience.
ry tru y yours,
\\
D A'
ha man RJB: DAN / led Attachment c:
V.
C.
Summer R.
A.
Stough 0.
W.
Dixon, Jr./T.
C.
N ic ho ls, Jr.
G.
O.
Pe rc iva l E.
H.
Crews, Jr.
R.
L.
Prevatte E.
C.
Roberts J.
B.
Knotts, Jr.
W.
A.
Williams, Jr.
S.
D.
Hogge Group Managers I&E Washington O.
S.
Bradham Document Management C.
A.
Price Branch S.
R.
Hunt INPO Records Center C.
L.
Ligon (NSRC)
ANI L ib r a r y K.
E.
Nodland NPCF File 8601310105 060103 PDR ADOCK 05000395 a I <$
S PDR v
F e
Dr.
J.
Ne ls on Grace SPR 85-020 Page Two January 3, 1986 EVENT DESCRIPTION On December 5, 1985, the Fire Protection Coordinator (FPC) was notified that Fire Door AB 319, located on the 412' elevation of was fu nc tional; however, it was di f ficult the Auxiliary Building, to close and latch.
A subsequent investigation by the FPC slightly twisted wh ich restricted identified that the door was proper closure and la t ch in g.
ACTION TAKEN Because of the difficulty in closing and l a t c h in g, the FPC declared the door inoperable.
As required by Technical Specification 3.7.10, " Fire Rated As s emb l ie s," smoke detectors were verified operable and an hourly fire watch patrol was established.
A requisit*on has been submitted and a new door placed on order.
The new as se mbly will be tnstalled immediately upon receipt.
CAUSE Prior to this event, authorization had been g iv e n to declare the subject door inoperable to facilitate passage o f c ables and hoses into the area during maintenance a c t iv i t y.
Compensatory action as required was taken prior to declaring the door inoperable.
The FPC has investigated the event and has determined that the damage occurred while the door was blocked open.
The Licensee will continue to emphasize the importance of fire protection in Station Orientation Training.
TE L9