Advises of Planned Insp Effort Resulting from Plant Semiannual Plant Performance Review.Details of Insp Plan for Next 8 Months Encl
ML20199E107
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/14/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hagan J
ENTERGY OPERATIONS, INC.
References
NUDOCS 9711210100
Download: ML20199E107 (6)


Text

,

g '8 %,

UNITio s?Af ts

-[k ' f.Y j

NUCLEAR REGULATORY COMMISSION i

~'

[

- }

Rtoiou sy

\\ \\ Mb[#/

- 6H RYAN MA2A ORIVE, sulf f 400

[

AR usot os, t t xAs n,ot t aos4 l

Joseph J. Hagan,.Vice President

)

Operations Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 l

SUBJECT:

SEMIANNUAL PLANT PERFORMANCE REVIEW (SPPR) GRAND GULF NUCLEAR STATION

Dear Mr. Hagan:

i On October 9,1997, the NRC staff completed the Semlannual Plant Performance Review (SPPR) of Grand Gulf. The staff conducts these reviews for all operating nuclear.

t power plants to develop an integrated understanding of safety performance. The results are used by NRC management to facilitate plannin0 and allocation of inspection resources.

1 The SPPR for Grand Gulf involved the participation of all technical divisions in evaluating inspection results and safety performance information for the period from March 1997 l

through September 1997. SPPRs provide NRC management with a current summary of i

licensee performance and serve as inputs to the NRC Systematic Assessment of Licensee

[

Performance-(SALP) and Senior Management Meeting (SMM) reviews.

This letter advises you of our planned inspection effort resulting from the Grand Gulf SPPR i

review, it is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite; The enclosure details our insrection plan for the next 8 months. The rationale or j

basis for each inspection outside the core inspection program is provided so that you are aware of the reason for emphasis in these program areas. Resident inspections are not l

listed due to their ongoing and continuous nature.

We willinform you of any changes to the inspection plan, if you have any questions, pleaso contact Dennis Kirsch at (510) 975 0319.

P Sincere t

homas P. Gw nn,

e. tor l

Division of Rea tor ro' ct Docket No.: 50 416 License No.: NPF-29

Enclosure:

Inspection Plan -

0 16 G

PDR e

e,-c

  • -e me

-..-~y..-w w

m sv

'w.

~3

,-e----...-re p-3-e,'-

~ em..c-ps

,v

.,t-e r

+-=**ra-e n-e w--

4 - = + =

  • 9 Entergy Operations, Inc.

2-cc w/ enclosure:

Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286 1995 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Winston & Strawn 1400 L Street, N.W. - 12th Floor Washington, D.C. 20005 3502 Sam Mabry, Director Division of Solid Waste Management Mississippi Department of Natural Resources P.O. Box 10385 Jackson, Mississippi 39209 President Claiborne County Board of Supervisors Port Gibson, Mississippi 39150 Manager of Operations Bechtel Power Corporation P.O. Box 2166 Houston, Texas 77252 2166 General Manager Grand Gulf Nuclear Station Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 The Honorable William J. Guste, Jr.

Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton _Ro ige, Louisiana 70004-9005 l-

I Entergy Operations, Inc.,

Office of the Governor State of Mississippi Jackson, Mississippi 39201 Mike Moore, Attorney General Frank Spencer, Asst. Attorney General State of Mississippi P.O. Box 22947 Jackson, Mississippi 39225-Dr. F. E. Thompson, Jr.

State Health Officer State Board of Health P.O. Box 1700 Jackson, Mississippi 39205 Robert W. Gof f, Director State liaison Officer Division of Radiation Health Mississippi Department of Health P.O. Box 1700 Jackson, Mississippi 39215 1700 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286 1995 Director, Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 Vice President, Operations Grand Gulf Nuclear Station

- Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150

Entergy Operations, Inc. NOV I 41997 bec to DCD (IE01) bec distrib. by RIV:

Regional Administrator Senior Resident inspector (River Bend)

DRP Director DRS PSB Branch Chief (DRP/F)

MIS System Project Engineer (DRP/F)

RIV File Branch Chief (DRP/TSS)

Senior Resident inspector (Grand Gulf)

DOCUMENT NAME: R:\\_GG\\GGSP9704.LTR To receive copy of document. Indicate in box: "C" = Copy without enclosures *E" = Copy wth enclosures "N" = No copy BlV:C:DRP/F,

i D:DRS D:DRP d

DFKirsch;dt 6 \\$ ATHowell TPGwynn f V 10/10/97 p p h \\J 10/, '/97 1Q/p/197 i

OFFIClAL RECORD COPY

Entergy Operations, Inc. NOV I 41997 bec to DCD (IE01) bec distrib. by RIV:

Regional Administrator Senior Resident Int 'ector (River Bend)

DRP Director DRS PSB Branch Chief (DRP/F)

MIS System Project Engineer (DRP/F)

RIV File Branch Chief (DRP/TSS)

Senior Resident inspector (Grand Gulf)

DOCUMENT NAME: R:\\_GG\\GGSP9704.LTR To receive copy of document, indicate la box: "C" = Copy wthout enclosures *E" = Copy with encbsures *N* = No copy RIV:C:DRP/F,

i D:DRS g

D:DRP d

DFKirsch;df (p, \\$ ATHowell2/'

TPGwynn f f 10/15/97 p p 4'1 \\)

10/ @/97 /0 1G//7197 '

i OFFICIAL RECORD COPY

O GRAND GULF NUCLEAR GENERATING STATION INSPECTION PLAN IP - Inspection Procedure T1 - Temporary instruction Core inspection - Minimum NRC inspection Program (mandatory all plants)

INSPECTION TITLEI NUMBER OF DATES TYPE OF EMSPECTION COMMENTS l

PROGRAM AREA INSPECTORS l

lP 81110 Operational Safeguards Response 5

12/08-12/12/97 Required by NRR Program Office Evaluation (OSRE)

?

IP 73753 Inservice inspection 1

03/16-03/20!97 Core Exam Preparation 1

03/16-03/20!98 Initial Exams 4

03/30-C4/03/98