ML20199L561

From kanterella
Revision as of 03:49, 8 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 8 to Program Plan GGNS-M-189.1, Grand Gulf Nuclear Station Pump & Valve IST Program - Safety Related, Complying w/1989 Edition of ASME Boiler & Pressure Vessel Code,Section XI
ML20199L561
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/26/1997
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20199L567 List:
References
GNRO-97-00116, GNRO-97-116, NUDOCS 9712020056
Download: ML20199L561 (2)


Text

.. _

i Entergy operations. Inc.

y hh.

PO [tua 7!c O/

191 G6vn MS 39150 TJ 6014374.J TO W. K. lughey November 26, 1997 gr ww uwto U.S. Nuclear Regulatory Commission Mail Station P137 Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit i Docket No. 50 416 License No. NPF 29 Inservice Testing Program Plan GNRO 97/00116 Gentlemen:

Grand Gulf Nuclear Station is scheduled to begin implementation of the second interval Inselvice Testing (IST) Program on December 1,1997. The new program complies with the 1983 edition of the ASME Boller and Pressure Vessel Code,Section XI. This submittal provides the program plan for your information. The Appendices address only administrative instructions and valve stroke time limits and are therefore not included.

Should you have any questions or need any additional information, please contact Bill Brice at 601-437-6550.

Yours truly, M

t.

/

WKH/WBB attachment

/)/'I f-cc:

(See Next Page) 9h2020056971126*

l llllllflll'l ADOCK 05000416

  • a a

m-

e-GNRO g7/00116 1

Page 2 of 2 cc:

Ms. J. L Dixon Herrity, GGNS Sen!or Resident (w/a)

Mr. L J. Smith (Wee Carter) (w/s) 1 i

Mr. N. S. Reynolds (w/a)

Mr. H. L Thomas (w/o) i Mr. E. W. Merschoff (w/a)

Regional Administratur U.S. Nuclear Regulatory Ccimmission Region IV oli Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager (w/2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C 20555 i

l a

b