ML20199M099

From kanterella
Revision as of 03:44, 8 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 4 to 35-1195-DEI-7, Document Control Computer Operations (Distribution) Group
ML20199M099
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/31/1981
From: Frankum D, Tanya Hood
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML18052B537 List: ... further results
References
FOIA-85-59 35-1195-DEI-7, NUDOCS 8607100102
Download: ML20199M099 (3)


Text

- --

r

. w. m w ma., - m mm

. w a,. -,..-.. -.. a- - -.._..,

~

A nnan m.uno li,'DEXED l

ISSUE BROWN & ROOT, INC.

PROCEDURE

~

CPSES NUMBER IBe nSION i

um.

PAGE 08 35-H 95 35-1195-DEI-7 4

8/31/81 1 of 2 TITLE:

ORIGINATOR: d 5-26-8l w

m

" DOCUMENT CONTROL COMPUTER OPERATIONS REVIEWED BY:

e

--9 e9//4/#/

(DISTRIBUTION)

QA/QC ~

OATE

$3hD APPROVED BY:

y

~

CONSTRUCTION PROJECT MANAGER DATE

1.0 INTRODUCTION

a

/

The purpose of this procedure is to describe the funjpnort.

of the Document Control Computer Operations (DistrifJtiord Group.

p

[..

bI.i

1.1 REFERENCES

  • 'Vy I '" ] I

~

i 25-1195-DCP-7 sra p,f.. p.

4 g

2.0 PROCEDURE M2.e' 2.1 When drawings or other documents are received, they areh on the computer files.

2.2 When a new revision to a document is received, the dis-tribution to the old document will be checked, and as a minimum, that distribution will always be assigned to the new document.

This will not only ensure that a recipient receives all revisions to a document, but will also ensure that no recipient is left with superceded documents in his files.

2.3 Whenever possible, "same distribution" should be used when creating new revisions to documents that have been distributed.

2.4 Drawing related information to be entered into the computer data base shall be read from either aperture cards or from the drawing itself.

2.5 Text related information to be entered into the computer data base shall be read directly from the document hard copy. These text items include specifications, procedures and technical

~

manual s.

NOTE: Corresponden data entry i e Authorized Records Man ement System (ARMS) Group. -

8607100102 860630

{

PDR FOIA GARDE 85-59 PDR y

g

- 88f

~

t r-

amaamw w mim M

h.. rs tq N4 J03 35-1195

-- Comanche Peak Steam Electric Station

-_l*

~ ~ ~ ~ ~

Sheet 1 of 2 Construction Procedure DOCUMENT CHANGE NOTICE NLHBER 1

This notice applies to Construction Procedure No. 35-1195 __ DET 7 Revision a This change will be incorporated in the ne.xt revision of the procedure.

Change the procedure as follows:

Replace the following page with the attached:

Page 2 of 2

/

k Reason for change:

Additional requirement This charyse approved by:

eviewed by:

/-/ 557_,.

g g

l-//

Originator /

Date Brown at Quality Assurance Date Reviewed by:

b[Ik 1/18/82 Construction Project Manager Date Effective Date i

m e

J+}

m PROCEDURE trrtc1lya BROWN & ROOT, INC.

NUMBER REVISION DATE PAGE CPSES JOB 35-1195 35-1195-DEI-7 4

8/31/81 2 of 2 2.6 In the event that the computer system is not in operation for an extended period of time, the Computer Operations (Distribution) Group will convert to a manual distribution system. Handwritten DRCL's are prepared from the most

- recent distribution schedule and the information is retained for input into the computer at the end of the inoperable period.

i

\\

/

DEI-7 Rev. 4 DC?l #1 1/18/82 Sheet 2 of 2

~