Text
_ - - _ _ - _ _ _ _ _ - _ _ _ _ _
=
g>* M Gg
f
\\,
UNITED STATES
{'sc
p,
NUCLEAR REGULATORY COMMISSION
Ei
- j
REGloN IV
0,
S
611 RYAN PLAZA DRIVE suite 400
D
%, ' %
,o
ARLINGTON TEXA5 760118064
March 4, 1998
John R. McGaha, Vice President - Operations
River Bend Station
'
Entergy Operations, Inc.
P.O. Box 220
St. Francisvitie, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT 50-458/98-01
,
Dear Mr. McGaha:
From February 10 to 13,1998, an announced, emergency preparedness inspection wws
conducted at your River Bend Station reactor facility. The enciesed report presents the scope
and results of that inspection.
The inspection included implementation of your emergency plan and procedures during your
biennial smergency preparedness exercise. Overall, performance during the bierinial exercise
was generally very good; however, one exercise weakness was identified. The exercise
weakness involved the operations support center's failure to promptly and properly dispatch
inplant repair teams.
Exercise weaknesses, according to 10 CFR Part 50, -
i.iV.F.2.g, are inspection
findings that need to be corrected by the licensee. Tturwoit.. you are requested to provide this
offica with a description of your corrective measures and your schedule for completing these
f.
actions within 30 days after receipt of this letter.
In addition to the exercise weakness, an unresolved item was identified conceming whether
Regulatory Guide 8.13 trainin0 (protection of the embryo / fetus) was conducted in cecordance
with the Updated Safety Analysis Report. This matter is discussed in Section P5 of the enclosed
report. The item is unresolved pending determination of whether the Regulatory Guide 8.13
subject matter was covered as part of other required training.
In accordance with 10 CFR 2.790 of tha NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room.
Should you have any questions conceming this inspection, we will be pleased to discuss them
with you.
Sincerely,
hyhfY
l
Blaine Murray, Chief
Plant Support Branch
\\
ador Safey
9803060282 980304
ADOCK 05000458
0
lf!
k k!! !!,!
,
.
,
Entergy Operations, Inc.
-3-
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Box 94005
Baton Rouge, Louisiana 70804-9005
H Anne Plottinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
President of West Feliciana
Police Jury .
P.O. Box 1921
St. Francisville, Louisiana 70775
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
<
Baton Rouge, Louidana 70884 2135
'
f
'
Training, Exercises, a Evaluation
Branch Chief-
FEMA Region VI
800 North Loop 288
Federal Regional Center
Denton, Texas 76201-3698
i
m
__
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . - __
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E Mail repori to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (lE35)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (Grand Gulf)
DRS Director
DRS Deputy Directory
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
Action item File - Goines (Al #98-G-4()
!
DOCUMENT NAME: R:\\._RB\\RB801RP.GMG
To voceive copy of document. Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV:SEPA\\PSB
E
RE\\03
E, RS\\PSB
E
RS\\PSB
C:09BC
GMGood:nh (gV M2MurphfW THAndrews-tw MCHay acf-
ECdlIfi'nf
umuu
I
C:DRS\\PSEL
BMy rray
"(J'
OltM98
s
OFFICIAL RECORD COPY
,
-__.
.
-.
..
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bec to DCD (IE35)
bec distrib. by RIV:
Regional Administrator
Senior Resident inspector (Grand Gulf)
DRS Director
DRS Deputy Directory
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Rerident inspector
Action item File - Goines (Al #98-G-40
I
3
.
r.
l-
(
DOCUMENT NAME: R:\\_RB\\RB801RP.GMG
To receive copy of document. Ind:cate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No ety
RIV:SEPA\\PSB
E
RE\\OB
E, RS\\PSB
E
RS\\PSB
C:DEC
l
GMGood:nh (onV MEMurphy)44*/ THAndrews-rw MCHay ad
EC61f&
_
!!I
- ====
mass
C:DRS\\PSBs
J'f~'
BMy rray
(
QRM98
'
~
OFFICIAL RECORD COPY
j