IR 05000311/1987006
| ML20205E957 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/09/1987 |
| From: | Collins S, Dudley N, Keller R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20205E943 | List: |
| References | |
| 50-311-87-06OL, 50-311-87-6OL, NUDOCS 8703310052 | |
| Download: ML20205E957 (2) | |
Text
-
_
_ _ _ - _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _
-
p.
U. S. NUCLEAR REGULATORY COMMISSION REGION I OPERATOR LICENSING EXAMINATION REPORT EXAMINATION REPORT NO. 87-06(0L)
FACILITY DOCKET NO. 50-311 FACILITY LICENSE NO. DPR-75 LICENSEE: Public Service Electric and Gas Co.
P. O. Box 236 Hancocks Bridge, New Jersey 08038 FACILITY: Salem Unit 2 EXAMINATION DATE:
February 13, 1987 CHIEF EXAMINER:
II
/
3 - J-8 7 N. Dudley, Lead Reactor gineer Examiner date I!
3[9M7 REVIEWED BY:
R. M. Keller, Chref, Project Section 1C date APPROVED BY:
3-tmuif/(IdlnM
- 3hl67
'S. J. Coliins, Deputy Director, date Deputy Director, Division of Reactor Projects SUMMARY: One candidate was ad:ninistered an oral examination.
QU3kh k1
V
__
,
p
n
. *
I
'
,
,
k',
(
o *
e
.
.,
st,
,
,
,
b 9),
,
(;; (
',
'
'
,
,
'
.
REPORT DETAILS
.
\\
. -;
t.
l
.,
TYPE OF EXA'4: Replacement
'
*
,
i
.
-
g g
g.
,
CHIEF EXAMINER AT SITE:
N. Dudley
1 Scope:
\\
\\
.
'..
An oral examination was administered to one candidate to provide a basiscRor
'
issuing an operating license for Salem Unt: 2.
The candidate is presently'
licensed on Salem Unit 1.
l
-
.
Findings:
i;
..
t
.
}
, y (
u The candidate failed the examination due to his lack of knowle'dge of the Technical Specifications unique to Unit 2.
J.
\\
i
.
The facility procedure for granting access to the site er,d radid ogical< areas, for the NRC examiner, was expeditious.
Thepresentfacilityaccesspfocedure is a major improvement over the previous procedure. The candidate did not
'
havesecurityclearancetogainaccessto'thespentfuelpool,,whichbyhave
<
hampered his ability to properly prepare for the licensing exaltination.
No generic weaknesses were identified as a result of th,e examirsatiori.
Entrance Interview:
k
'
'
q
+
,
Mr. James Gueller, Operations Manager, was contacted and was provided with C brief outline of the reason, scope and expected durati?n of the oral examination.
.
j-s
\\
t h I
'.
i
,
s Ii
s s
\\
b
/
t f
'
a a
i g
\\
.
\\
.
- -- -
-