Forwards Insp Repts 50-245/86-26,50-336/86-32 & 50-423/86-38 on 861211-12 & Notice of Violation
ML20210B038
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/30/1987
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20210B043 List:
References
EA-87-010, EA-87-10, NUDOCS 8702090062
Download: ML20210B038 (3)


See also: IR 05000245/1986026

Text

.c.c

..

.-

.

..

.

.

.

.

. ~ .

,-

.

\\

'

o

. .

l

JAN 3 01987

Docket No. 50-245; 50-336; 50-423

License Nos. DPR-21; DPR-65, NPF-44

EA # $7-10

Northeast Nuclear Energy Company

ATTN: Mr. E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: NOTICE OF VIOLATION

(Combined Inspection 50-245/86-26; 50-336/86-32; 50-423/86-38)

This refers to a special NRC inspection conducted on December 11-12, 1986 at

the Millstone Nuclear Power Station, Waterford, Connecticut to review the

circumstances associated with a violation of the physical security plan at

Millstone. The violation, which was identified by a member of your maintenance

staff and reported to the NRC, involved a degradation of the protected area

(PA) barrier. A copy of the inspection report is enclosed.

Since the degradation could not be easily exploited and was not readily

apparent, and the area in the vicinity of the degradation was well lit and

monitored with assessment aids, the violation, which is described in the

enclosed Notice, has been classified at Severity Level IV in accordance with

the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy) (1986). Nonetheless, the violation

is of concern to the NRC since the degradation was caused when certain equip-

ment, which comprised a portion of the PA barrier, was removed by maintenance

personnel without the security department being notified. As a result, com-

pensatory measures were not taken. This violation demonstrates the importance

'

of appropriate coordination with the security department when such activities

occur. Any similar deficiencies in the future may result in additional

enforcement action.

You are required to respond to this letter and the enclosed Notice, and in

preparing your response, you should follow the instructions specified in the

enclosed Notice.

In your response, you should document the specific actions

taken and any additional actions you plan to prevent recurrence.

Further, you

should place all Safeguards Information (as defined in 10 CFR 73.21) in

enclosures, so as to allow your letter without the enclosures to be placed in

the Public Document Room. After reviewing your response to this Notice,

including your proposed corrective actions, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

i

8702090062 870130

0FFICIAL RECORD COPY

CP SG MILL - 0004.0.0

PDR

ADOCK 05000245

01/30/87

bk

G

PDR

\\

N)

.

_

.

.

-

_-

-

.

..

.

._..

.

-

. . _ .

.

. ..__ ........ .. . . . .

'

-

. .

Northeast Nuclear Energy Company

2

Portions of the enclosed Notice and of the inspection report contain details of your

security program that have been determined to be exempt from public disclosure

in accordance with 10 CFR 73.21 (Safeguards Information). Therefore, those

portions will not be placed in the NRC Public Document Room and will receive

limited distribution.

The response directed by this letter and the enclosed Notice is not subject to

the clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Sincerely,

Original Sicasd 3 ;

7

James H. Joyner

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1.

Notice of Violation (Contains Safeguards Information (SGI))

2.

Inspection Report No. 50-245/86-26; 50-336/86-32; 50-423/86-38 (Contains

Safeguards Information in paragraph 3)

cc w/enci (w/o 3GI):

W. D. Romberg, Vice President, Nuclear Operations

S. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. Kacich, Supervisor, Operating Nuclear Plant Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/SGI)

State of Connecticut

0FFICIAL RECORD COPY

CP SG MILL - 0004.1.0

01/30/87

-_.

. . _ _ _ _

__

._

._ _ . - .

_ - -

_ _ - _ _.

.

..

Northeast Nuclear Energy Company

3

bec w/ enc 1 (w/o SGI):

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

M. McBride, RI, Pilgrim (w/SGI)

P. Swetland, SRI, Haddam Neck (w/SGI)

J. T. Shediosky, SRI, Millstone 3 (w/SGI)

J. Shea, LPM, NRR

Robert J. Bores, DRSS

C. Gaskins, NMSS (w/SGI)

W

W

ES:RI

DRSS

.RI L/K:DRSS

RI:DRP

J{/kRP

Holody/geb

Keidig

Jayner 5 Martin

McCabe

ger

/K4hv[/87

1

01

/87

01//4,/87 01/lW87 01{k/87 01/f4/87 01// 87

01//

77

YlN

J

t

RI

IA:RI

HQ: IE

ap

Murley

Beach

/p/87 01/ /87

1/

Q....

.-.

,

,a,

[ 0FFICIAL RECORD COPY

CP SG MILL - 0006.0.0

01/30/87

fu d by

l

p

te /

,

k

. _

_

_-

.-

- . -

- _ - . - _ _

. . _

.--

.

.