IR 05000413/1997300

From kanterella
Revision as of 02:01, 6 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Discusses Arrangements Made for Administration of Licensing Exams 50-413/97-300 & 50-414/97-300 on 971201-15.Staff Should Furnish Proposed Exam Outlines by 970922 in Order to Meet Exam Schedule
ML20210M952
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 08/13/1997
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gordon Peterson
DUKE POWER CO.
References
NUDOCS 9708220303
Download: ML20210M952 (4)


Text

_

'

,,>

August 13, 1997 Juke Power Company

{

KfTN: Mr. G. l Site Vice President Ca_awba Site

'

4800 ConcWd PMd l

York, SC W745MJe SUB,8ECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS CATAWBA NUCLEAR STATION 50-413/97-300 AND 50414/97 300

Dear Mr. Peterson:

l In a telephone conversation on August 4,1997, between Mr. Scott Bradshaw, Operations Training and Mr. D. Charles Payne, License Examiner, arrangements were made for the l

administration oflicensinc examinations at the Catawba Nuclear Station during the weeks of l

December 1 and Decemoer 15,1997.

Your staff will prepare the proposed examinations in accordance with the guidelines in Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any examination changes that might be necessary prior to their administration.

To meet the above scheduie, it will be necessary for your staff to furnish the proposed examination outlines by September 22,1997. The proposed written examinations, operating tests, Pnd the supporting reference materials identified in Attachment 2 of ES 201 will be due by October 20,1997. Any delay in receiving the required reference and examination materials or the submittal of inadequate or incomplete materials may result in the examinations being rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to prov!de adequate space and accommodations in accordance with ES 402 and to make the simulation facility available on the dates noted above in accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

Your staff should submit preliminary reactor operator and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to revi>w the applications and the medical certifications and evaluate any reqyested waivers. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

9708220303 970813 D

(lll

g

  1. or

_

-

"

..

DPC

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,2000. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and malling the required reference material; the estimated average burden to prepare the examinations is 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />. Send comments regarding this bu, den estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB 10202, Office of Management and Budget, Washington, D.C. 20503.

Thank you for your cooperation in this matter. Mr. Bradshaw has been advised of the policles and guidelines referenced in this letter, if you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Payne at (404) 562-4647, or myself at (404) 562-4638.

Sincerely, (Original signed by T. A, Peebles)

Thomas A. Peebles, Chief Operator Licensing and Human Per~ormance Branch Division of Reactor Safety Docket Nos. 50-413,50-414 License Nos. NPF-35, NPF-52 cc:

M. S. Kitlan Regulatory Compliance Manager Duke Power Company 4800 Concord Road York, SC 29745 9635 Paul R. Newton -

Duke Power Company

_j 422 South Church Street

]

Charlotte, NC 28242-0001

,

cc cont'd: {See page 2}

...,

.

.

.

.

.

.

"

..

DPC

cc cont'd:

Robert P. Gruber Karen E. Long Executive Director Assistant Attorney General Public Staff NCUC N. C. Department of Justice P. O. Box 29520 P. Box 629 Raleigh, NC 27626-0520 Raleigh, NC 27602 J. Michael McGarry, Ill, Esq.

Saluda River Electric Winston and Strawn Cooperative, Inc.

1400 L Street, NW P. O. Box 929 l

Washington, D. C, 20005 Laurens, SC 129360

!

North Carolina MPA 1 County Manager of York County

'

Suite 600 York County Courthouse P. O. Box 29513 York, SC 29745

- Raleigh, NC 27626-0513 Piedmont Municipal Power Agency -

Max Batavia, Chief 121 Village Drive Bureau of Radiological Health Greer, SC 29651 S. C. Department of Health and Environmental Control G.A.Copp 2600 Bull Street Licensing - EC050 Columbia, SC 29201 Duke Power Company P. O. Box 1006 Richard P. Wilson, Esq.

Charlotte, NC 28201-1006 Assistant Attorney General S. C. Attorney General's Office T. Richard Puryear P. O. Box 11549 Owners Group -

Columbia, SC 29211 North Carolina Electric Membership Corporation Michael Hirsch 4800 Concord Road Federal Emergency Management York, SC 29745 Agency 500 C Street, SW, Room 840 Ron Jones Washington, D. C,- 20472 Plant Manager Catawba Nuclear Station North Carolina Electric 4800 Concord Road Membership Corporation York, SC 29745-9635 P. O. Box 27306 Raleigh, NC 27611 W. H. Miller -

Training Manager Catawba Nuclear Station 4850 Concord Road York, SC 29745 Distribution w/ encl; {See page 4} -

-

.

,,,. *

DPC

Distribution w/ encl:

P. Tam, NRR R. Carroll, Ril C. Payne, Rll B. Michael, Rll PUBLIC NRC Resident inspector U.S. Nuclear Regulator Commission 4830 Concord Road York, SC 29745

!

__

0FFICE tl[4h Ril:DRS Ril:DRP RlltDRS

,

SIGNATURE

/N~

gy V

$M Mg/

NM D M M luo OL POC SSchaeffer TPeebles'

DATE S/ -)

/97-8/ 7 /97 81 /l /97 8/_/2 /97 8/

/97 8/

/97 8/

/97 crev, vrs # so >

vrs e

/vre no QW mo vrs no vrs no vrs no 0FilCIALREUDCOPY -

" DOC M N W : Ga\\LkWIT\\1200A300.DCP j

)

.

.

-

- - -. -

-

.

.

-

,