ML20212E744

From kanterella
Revision as of 06:25, 4 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards AEOD/C605, Case Study Rept,Operational Experience Involving Losses of Electrical Inverters. Study Initiated Based on Observation of Lack of Overall industry-wide Improvement in Operational Performance of Devices
ML20212E744
Person / Time
Issue date: 01/20/1987
From: Stello V
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Asselstine, Roberts, Zech
NRC COMMISSION (OCM)
References
AEOD-C605, NUDOCS 8703040461
Download: ML20212E744 (1)


Text