ML20239B054

From kanterella
Revision as of 04:51, 2 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
FAQ Log August 2020
ML20239B054
Person / Time
Issue date: 08/26/2020
From: Joylynn Quinones-Navarro
NRC/NRR/DRO/IRAB
To:
joylynn Quinones-Navarro NRR/DRO
References
Download: ML20239B054 (1)


Text

FAQ Log - August 2020 Page 1 of 1 Revised 01/22/2020 FAQ No.

PI Topic Status Plant/Co.

Point of Contact 20-03 MS Restoration of Train Monitoring After PRA Model Changes Introduced August 25, 2020 Generic Roy Linthicum (NEI)

Joylynn Quinones (NRC) 20-04 EP01 Crediting Automated Notifications in the DEP Performance Indicator Introduced August 25, 2020 Generic Andrew Young (NEI)

Don Johnson (NRC)

For more information, contact: James Slider, (202) 739-8015, jes@nei.org