Advises That 890525 Rev 12 to QA Program Description Acceptable
ML20246N266
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/13/1989
From: Durr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
References
NUDOCS 8907190331
Download: ML20246N266 (3)


Text

C

),3

. /,' - ;

f,. ;. a.

7 JUL 131989 -

L L

Docket No. 50-213-l Connecticut-Yank'ee' Atomic. Power' Company ATTN: Mr. E. J.-Mroczka~

,,'n Senior Vice President - Nuclear Engineering 'and Operations G.ap P. 0.. Box.270 Hartford, Connecticut 06141

. Gentlemen:

Subject:

10 CFR 50.54 Quality Assurance Program Description Chang'e Review

Reference:

Letter B13245 dated May 25, 1989, E. J. Mroczka' to U.S;' Nuclear Regulatory Commission, transmitting changes to the Northeast-'

Utilities Quality Assurance Program Topical-Report-We have received the-referenced. letter transmitting Revision 12, of!the-

. Northeast Utilities Quality Assurance Program Topical Report. The Region-I; staff has ' reviewed this sub.aittal and found the changes to.be acceptable las they do not reduce.your previous commitments to quality assurance.

sThe effectiveness of your.QA~ Program and procedure implementation will continue to be the subject of routine regional inspections.

^^

you have any q':sstions concerning the above, please call.R. W.-Winters on

-W15) 337-5244.

. Sincerely, Or1 1nal Signed By

  • 6 P.K.Espen Jacque P. Durr, Chief Engineering Branch Division of Reactor Safety.

OFFICIAL RECORD COPY HADDAM NECK QA PROGRAM - 0001.0.0 07/13/89 Ih 8907190331'890713 PDR ADOCK 05000213

_ r c.m

,/

P.

PDC L L. m

5.'.. -

JUL' 13 1989

~

w

t...

a 1

Conn'ecticut Yankee Atomic '

2-

. Power. Company.

2 cc w/ encl:

'<~

>D.'B. Miller Station Superintendent D. O. Nordquist', Director of Quality' Services R._ M. Kacich,' Manager, Generation Facilities Licensing.

W. D..Romberg, Vice President, Nuclear Operations

-Gerald Garfield, Esquire Public' Document Room'(PDR.)

Local Public Document Room (LPDR)

Nuclear' Safety Information Center (NSIC)

NRR/QUAB

~NRC. Resident Inspector

. State'of Connecticut bec w/ enc 1:

Regica.I Docket ~ Room.(with concurrences)

..na;.; mat-MWt=t, OrJ" (w/o enci)

Section Chief, DRP

'W.' Raymond, SRI, Millstone 1&2 A. Wang, LPM, NRR

~ J. ' Dye r, ' ED0 --

P. Eapen, DRS.

R. Winters, DRS

Licensing' Assistant, DRS RI:DRS RkRS RI:h Jinters Eahliin (JurF MWS i

7/12 / 8 9 7/l)/89 7/l)/89 0FFICIAL RECORD COPY HADDAM NECK QA PROGRAM - 0001.1.0 07/12/89

/

U.S. Nuclear Regulatory Commission

B13245/Page 2-May 25,.1989 If you have - any. questions regarding this-submittal, please contact Mr. Donald O. Nordquist at (203) 665-5447.

Very truly-yours, NORTHEAST UTILITIES SERVICE COMPANY 1

  1. 4 /

E. J. 9ffptzRa~

/~

~

~

Senior Vice Presidfent cc:

W. T. Russell, Region 1 Administrator M. L. Boyle, NRC Project Manager, Millstone Unit No.1 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3 A.' B. Wang, NRC Project Manager, Haddam Neck Plant

'W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 J. T. Shedlosky, Senior Resident Inspector, Haddam Neck Plant P. K. Eapen, Chief, Quality Assurance Section, Region 1 1

l 1

1 i

~.

..,, NORTHEAST UTILITIES cenem Onices. semen sueet. eemn. connecticut Us 7.[dN,U[cIc P O BOX 270 HARTFORD, CONNECTICUT 06141-0270 J $,[$$[$Y.",,j/7,,,

k k

(203) 665-5000 May 25, 1989 Docket Nos. 50-213 50-245 50-336 50-423 B13245 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3 Annual Reporting of Changes to the Quality Assurance Program Proposed Revision 12 to the Northeast Utilities Ouality Assurance Proaram Topical Report In accordance with 10CFR50.54(a)(3), transmitted herewith is proposed Revi-sion 12 of the Northeast Utilities Quality Assurance Program (NVQAP) Topical Report (Attachment B) for your review and approval.

Proposed changes to the Topical Report are indicated by the vertical line in the right-hand margin.

The issue and basis for each change are detailed in Attachment A which i, arranged in a sequence which coincides with the Topical Report sections.

Attachment A does not include rrinor editorial changes in accordance wi'.h 10CFR50.54(a)(3)(ii).

All changes included in proposed Revision 12 of the NVQAP Topical Report have the effect of upgrading our Quality Assurance Program which continues to meet the criteria of 10CFR50 Appendix B.

Please note that the draft NVQAP Topical Report is shown as Revision 12 without a date.

This draft will be issued as s'evision 12 and dated the same as your effective date of approval when we receive it or sixty days following this submittal as prescribed in 10CFR50.54(a)(3)(iv).

p i

./