Diablo Canon Nuclear Power Plant, Security Baseline Inspection Report 07200026/2021401
ML21210A419
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 08/03/2021
From: Ray Kellar
Plant Support Branch-1
To: Welsch J
Pacific Gas & Electric Co
References
IR 2021401
Download: ML21210A419 (6)


Text

August 03, 2021

SUBJECT:

DIABLO CANYON NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 07200026/2021401

Dear Mr. Welsch:

On June 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Nuclear Power Plant and discussed the results of this inspection with Mr. Cary Harbor, Senior Station Director, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 07200026

Enclosure:

As stated

Inspection Report

Docket Number:

07200026

License Number:

SNM 2511

Report Number:

07200026/2021401

Enterprise Identifier: I-2021-401-0130

Licensee:

Pacific Gas and Electric Company

Facility:

Diablo Canyon Nuclear Power Plant

Location:

Avila Beach, CA

Inspection Dates:

June 28, 2021 to June 30, 2021

Inspectors:

D. Holman, Sr Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

===81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations (Complete)

The inspector evaluated the Physical Protection Program for the specific licensed Independent Spent Fuel Storage Installation located at Diablo Canyon Nuclear Power Plant. The most appropriate inspection requirements were inspected based on the Independent Spent Fuel Storage Installation site conditions. The following elements were evaluated:

Physical Security Requirements for Independent Spent Fuel Storage Installations===

(1)02.02 (a-y)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 30, 2021, the inspectors presented the security baseline inspection results to Mr. Cary Harbor, Senior Station Director and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

81311

Corrective Action

Documents

Resulting from

Inspection

Notification

51124047

6/28/21

Drawings

Plan: Interior Wall

ISFSI Access/Electrical Modular Building Interior

Improvements

Unknown

Miscellaneous

ISFSI Specific

Lesson Plan

ISFSI Vehicle Access Point Process

Unknown

Physical Security

Plan

DCNPP Physical Security Plan, Training and Qualification

Program, Safeguards Contingency Plan, and ISFSI Security

Program

Regulatory Guide 5.44

Perimeter Intrusion Alarm Systems

Procedures

SP 304

Operability Testing of Intrusion Alarm System

SP 308A

Performance Testing of Site Microwave Intrusion Alarm

System

SP 401

Security Access Control and Personnel Identification

SP 402A

Independent Spent Fuel Storage Installation Protected Area

Access

SP 409

Authorization of Unescorted Access Status

SP 501

Security Lock, Key and Combination Control