October 21, 2021
SUBJECT:
WOLF CREEK NUCLEAR GENERATING STATION - ISFSI SECURITY INSPECTION REPORT 07200079/2021401
Dear Mr. Reasoner:
On October 6, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Nuclear Generating Station and discussed the results of this inspection with Mr.
Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No violations were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E. Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 07200079
Enclosure:
As stated
Inspection Report
Docket Number:
07200079
License Number:
Report Number:
07200079/2021401
Enterprise Identifier: I-2021-401-0148
Licensee:
Wolf Creek Nuclear Operating Corp.
Facility:
Wolf Creek Nuclear Generating Station
Location:
Burlington, KS
Inspection Dates:
October 05, 2021 to October 06, 2021
Inspectors:
D. Holman, Sr Physical Security Inspector
Approved By:
Ray L. Kellar, Chief
Plant Support Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security inspection at Wolf Creek Nuclear Generating Station, in accordance with the Traditional Enforcement Process.
List of Violations
No violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2960, Inspection Program For Storage of Spent Reactor Fuel and Reactor Related Greater-Than-Class C Waste At Independent Spent Fuel Storage Installations And For 10 CFR Part 71 Transportation Packaging. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19),inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations Physical Security Requirements for Independent Spent Fuel Storage Installations
- (1) The inspector evaluated the Physical Protection Program for the general licensed Independent Spent Fuel Storage Installation located at Wolf Creek Generating Station. The most appropriate inspection requirements were inspected based on the Independent Spent Fuel Storage Installation site conditions in addition to their license category. The following elements were evaluated for this initial security inspection before loading fuel:
- 02.01 (a - f)
INSPECTION RESULTS
No violations were identified.
EXIT MEETINGS AND DEBRIEFS
The inspector verified no proprietary information was retained or documented in this report.
- On October 6, 2021, the inspector presented the security inspection results to Mr. Jaime McCoy, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
81311
Corrective Action
Documents
10009483
Condition Report
Corrective Action
Documents
Resulting from
Inspection
10009666
Condition Report
10009669
Condition Report
Miscellaneous
Email from
Southwest
Microwave to
Michael Corbin
Wolf Creek Jump Test Method
10/06/2021
OF1700400
Lesson Plan: Conduct Patrols
007
ISSUANCE OF ORDER FOR IMPLEMENTATION OF
ADDITIONAL SECURITY MEASURES AND
FINGERPRINTING FOR UNESCORTED ACCESS AT THE
WOLF CREEK GENERATING STATION INDEPENDENT
SPENT FUEL STORAGE INSTALLATION
07/22/2020
Procedures
SEC 01-108A
Security System Performance Testing
2