ML22292A096
Text
U.S. NUCLEAR REGULATORY COMMISSION DOCKET 50-410 LICENSE NPF-69 NINE MILE POINT NUCLEAR STATION UNIT 2 UPDATED SAFETY ANALYSIS REPORT OCTOBER 2022 REVISION 25
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-1 Rev. 25, October 2022 9.1-1 A00 9.1-1a A05 9.1-2 R16 9.1-3 R18 9.1-3a R18 9.1-3b R18 9.1-4 R18 9.1-4a R18 9.1-5a R22 9.1-5b R22 9.1-5c R16 9.1-5d R16 9.1-6 Sh 1 R03 9.1-6 Sh 2 R03 9.1-6 Sh 3 R21 9.1-6 Sh 4 R03 9.1-6 Sh 5 R00 9.1-6 Sh 6 R21 9.1-6 Sh 7 R03 9.1-6 Sh 8 R03 9.1-7 R16 9.1-8 R10 9.1-9 A00 9.1-10 A00 9.1-11 A00 9.1-12 A00 9.1-13 A00 9.1-14 A00 9.1-15 A00 9.1-16 A00 9.1-17 A00 9.1-18 A00 9.1-19 A28 9.1-19a R23 9.1-20 A28 9.1-20a R07 9.1-21 A00 9.1-22 A00 9.1-23 R03 9.1-24 R10 9.1-25 R10 9.1-26a R15 9.1-27 R07 9.1-28a R17 9.2-1a R14 9.2-1b R17 9.2-1c R09 9.2-1d R04 9.2-1e R10 9.2-1f R19 9.2-1g R14 9.2-1h R23 9.2-1j R20 9.2-1k R00 9.2-1L R20 9.2-1m R20 9.2-1n R07 9.2-1p R17 9.2-1q R16 9.2-2 Sh 1 R14 9.2-2 Sh 2 R25 9.2-2 Sh 3 R25 9.2-2 Sh 4 R03 9.2-2 Sh 5 R04 9.2-2 Sh 6 R13 9.2-2 Sh 7 R07 9.2-2 Sh 8 R05 9.2-2 Sh 9 R10 9.2-2 Sh 10 R22 9.2-2 Sh 11 R13 9.2-2 Sh 12 R03 9.2-2 Sh 13 R22 9.2-2 Sh 14 R14 9.2-2 Sh 15 R22 9.2-2 Sh 16 R01 9.2-2 Sh 17 R03 9.2-2 Sh 18 R13 9.2-2 Sh 19 R03 9.2-2 Sh 20 R15 9.2-2 Sh 21 R03 9.2-2 Sh 22 R01 9.2-2 Sh 23 R01 9.2-2 Sh 24 R03 9.2-2 Sh 25 R01 9.2-2 Sh 26 R16 9.2-2 Sh 27 R13 9.2-3a R22
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-2 Rev. 25, October 2022 9.2-3b R22 9.2-3c R15 9.2-3d R22 9.2-3e R17 9.2-3f R07 9.2-3g R20 9.2-4 Sh 1 R03 9.2-4 Sh 2 R16 9.2-4 Sh 3 R22 9.2-4 Sh 4 R03 9.2-4 Sh 5 R15 9.2-4 Sh 6 R03 9.2-4 Sh 7 R00 9.2-4 Sh 8 R00 9.2-4 Sh 9 R13 9.2-4 Sh 10 R17 9.2-4 Sh 11 R03 9.2-4 Sh 12 R03 9.2-5a R18 9.2-5b R15 9.2-5c R19 9.2-5d R19 9.2-5e R18 9.2-6a R23 9.2-7 Sh 1 R03 9.2-7 Sh 2 R03 9.2-7 Sh 3 R03 9.2-7 Sh 4 R03 9.2-7 Sh 5 R15 9.2-7 Sh 6 R03 9.2-7 Sh 7 R18 9.2-7 Sh 8 R03 9.2-7 Sh 9 R03 9.2-7 Sh 10 R03 9.2-7 Sh 11 R03 9.2-7 Sh 12 R03 9.2-8a R21 9.2-8b R10 9.2-9a R15 9.2-9b R10 9.2-10 R04 9.2-11 R04 9.2-12 R04 9.2-13 A00 9.2-14 R04 9.2-15 A00 9.2-16 A00 9.2-17a R19 9.2-17b R24 9.2-17c R17 9.2-18 Sh 1 R03 9.2-18 Sh 2 R03 9.2-18 Sh 3 R03 9.2-18 Sh 4 R03 9.2-19a R15 9.2-19b R20 9.2-19c R23 9.2-19d R20 9.2-19e R20 9.2-19f R20 9.2-20 Sh 1 R03 9.2-20 Sh 2 R03 9.2-20 Sh 3 R03 9.2-20 Sh 4 R03 9.2-20 Sh 5 R03 9.2-21 R13 9.3-1a R22 9.3-1b R22 9.3-1c R19 9.3-1d R25 9.3-1e R22 9.3-1f R08 9.3-1g R16 9.3-1h R10 9.3-1j R02 9.3-1k R17 9.3-1L R22 9.3-1m R15 9.3-2 Sh 1 R07 9.3-2 Sh 2 R07 9.3-2 Sh 3 R07 9.3-2 Sh 4 R07 9.3-2 Sh 5 R19 9.3-2 Sh 6 R07 9.3-2 Sh 7 R16 9.3-2 Sh 8 R07 9.3-2 Sh 9 R07 9.3-2 Sh 10 R07 9.3-2 Sh 11 R07 9.3-2 Sh 12 R17 9.3-2 Sh 13 R07 9.3-3a R10 9.3-3b R00
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-3 Rev. 25, October 2022 9.3-3c R07 9.3-3d R00 9.3-3e R00 9.3-4 R07 9.3-5a R10 9.3-5b R15 9.3-5c R10 9.3-5d R25 9.3-5e R16 9.3-5f R16 9.3-5g R15 9.3-5h R00 9.3-5j R10 9.3-5k R24 9.3-6 Sh 1 R25 9.3-6 Sh 2 R13 9.3-6 Sh 3 R20 9.3-6 Sh 4 R20 9.3-7 Sh 1 R15 9.3-7 Sh 2 R03 9.3-7 Sh 3 R03 9.3-7 Sh 4 R03 9.3-7 Sh 5 R15 9.3-7 Sh 6 R10 9.3-7 Sh 7 R03 9.3-7 Sh 8 R10 9.3-8 Sh 1 R00 9.3-8 Sh 2 R03 9.3-8 Sh 3 R00 9.3-9a R18 9.3-9b R13 9.3-9c R10 9.3-9d R18 9.3-9e R23 9.3-9f R20 9.3-10a R05 9.3-10b R05 9.3-10c R05 9.3-10d R00 9.3-10e R03 9.3-10f R10 9.3-10g R07 9.3-10h R10 9.3-10j R14 9.3-11a R00 9.3-11b R18 9.3-11c R00 9.3-11d R19 9.3-11e R10 9.3-12a R00 9.3-12b R01 9.3-12c R03 9.3-12d R09 9.3-12e R23 9.3-12f R21 9.3-12g R22 9.3-12h R17 9.3-12j R20 9.3-12k R17 9.3-12L R17 9.3-13 Sh 1 R07 9.3-13 Sh 2 R03 9.3-13 Sh 3 R15 9.3-13 Sh 4 R13 9.3-13 Sh 5 R03 9.3-13 Sh 6 R03 9.3-13 Sh 7 R15 9.3-13 Sh 8 R13 9.3-13 Sh 9 R03 9.3-13 Sh 10 R00 9.3-14 Sh 1 R03 9.3-14 Sh 2 R03 9.3-14 Sh 3 R03 9.3-14 Sh 4 R03 9.3-15 R03 9.3-16 Sh 1 R03 9.3-16 Sh 2 R03 9.3-16 Sh 3 R03 9.3-16 Sh 4 R15 9.3-16 Sh 5 R07 9.3-16 Sh 6 R10 9.3-16 Sh 7 R08 9.3-16 Sh 8 R07 9.3-16 Sh 9 R07 9.3-17a R25 9.3-18 R21 9.3-19 A00 9.3-20a R10 9.3-20b R14 9.4-1a R22 9.4-1b R22 9.4-1c R22 9.4-1d R24 9.4-1e R16
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-4 Rev. 25, October 2022 9.4-1f R09 9.4-2a R15 9.4-2b R15 9.4-2c R10 9.4-2d R16 9.4-2e R20 9.4-3a R22 9.4-3b R16 9.4-3c R16 9.4-3d R16 9.4-3e R00 9.4-3f R10 9.4-4 Sh 1 R16 9.4-4 Sh 2 R17 9.4-4 Sh 3 R15 9.4-4 Sh 4 R10 9.4-4 Sh 5 R22 9.4-4 Sh 6 R10 9.4-4 Sh 7 R00 9.4-4 Sh 8 R03 9.4-4 Sh 9 R16 9.4-5 Sh 1 R10 9.4-5 Sh 2 R00 9.4-5 Sh 3 R22 9.4-5 Sh 4 R03 9.4-5 Sh 5 R00 9.4-5 Sh 6 R09 9.4-5 Sh 7 R00 9.4-5 Sh 8 R01 9.4-6 Sh 1 R22 9.4-6 Sh 2 R22 9.4-6 Sh 3 R20 9.4-6 Sh 4 R03 9.4-6 Sh 5 R22 9.4-6 Sh 6 R22 9.4-6 Sh 7 R03 9.4-7 Sh 1 R16 9.4-7 Sh 2 R10 9.4-7 Sh 3 R10 9.4-7 Sh 4 R03 9.4-7 Sh 5 R05 9.4-7 Sh 6 R00 9.4-7 Sh 7 R00 9.4-7 Sh 8 R00 9.4-7 Sh 9 R03 9.4-7 Sh 10 R03 9.4-7 Sh 11 R03 9.4-7 Sh 12 R00 9.4-7 Sh 13 R00 9.4-7 Sh 14 R03 9.4-8a R21 9.4-8b R17 9.4-8c R17 9.4-8d R16 9.4-8e R10 9.4-8f R17 9.4-8g R20 9.4-8h R03 9.4-8j R04 9.4-8k R25 9.4-8L R22 9.4-8m R21 9.4-9 Sh 1 R10 9.4-9 Sh 2 R10 9.4-9 Sh 3 R10 9.4-9 Sh 4 R10 9.4-9 Sh 5 R10 9.4-9 Sh 6 R10 9.4-9 Sh 7 R10 9.4-9 Sh 8 R15 9.4-9 Sh 9 R10 9.4-9 Sh 10 R10 9.4-9 Sh 11 R22 9.4-9 Sh 12 R10 9.4-9 Sh 13 R10 9.4-9 Sh 14 R16 9.4-9 Sh 15 R16 9.4-9 Sh 16 R10 9.4-9 Sh 17 R25 9.4-9 Sh 18 R10 9.4-9 Sh 19 R15 9.4-9 Sh 20 R10 9.4-9 Sh 21 R10 9.4-9 Sh 22 R25 9.4-9 Sh 23 R22 9.4-9 Sh 24 R13 9.4-9 Sh 25 R22 9.4-9 Sh 26 R15 9.4-10a R16 9.4-10b R13 9.4-10c R19 9.4-10d R13 9.4-10e R22 9.4-11 Sh 1 R03
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-5 Rev. 25, October 2022 9.4-11 Sh 2 R03 9.4-11 Sh 3 R19 9.4-11 Sh 4 R03 9.4-11 Sh 5 R01 9.4-11 Sh 6 R03 9.4-11 Sh 7 R03 9.4-11 Sh 8 R18 9.4-11 Sh 9 R03 9.4-11 Sh 10 R00 9.4-11 Sh 11 R00 9.4-11 Sh 12 R03 9.4-11 Sh 13 R03 9.4-11 Sh 14 R03 9.4-11 Sh 15 R03 9.4-11 Sh 16 R16 9.4-11 Sh 17 R03 9.4-12a R20 9.4-12b R18 9.4-12c R20 9.4-12d R00 9.4-13 Sh 1 R03 9.4-13 Sh 2 R09 9.4-13 Sh 3 R20 9.4-13 Sh 4 R03 9.4-13 Sh 5 R03 9.4-13 Sh 6 R03 9.4-13 Sh 7 R15 9.4-13 Sh 8 R15 9.4-13 Sh 9 R16 9.4-13 Sh 10 R20 9.4-13 Sh 11 R03 9.4-13 Sh 12 R03 9.4-14 Sh 1 R05 9.4-14 Sh 2 R03 9.4-14 Sh 3 R03 9.4-15a R00 9.4-16 Sh 1 R23 9.4-16 Sh 2 R03 9.4-16 Sh 3 R03 9.4-16 Sh 4 R03 9.4-16 Sh 5 R15 9.4-16 Sh 6 R03 9.4-16 Sh 7 R03 9.4-16 Sh 8 R03 9.4-16 Sh 9 R22 9.4-17 Sh 1 R03 9.4-17 Sh 2 R03 9.4-17 Sh 3 R03 9.4-17 Sh 4 R00 9.4-17 Sh 5 R15 9.4-17 Sh 6 R03 9.4-17 Sh 7 R03 9.4-17 Sh 8 R16 9.4-17 Sh 9 R16 9.4-17 Sh 10 R03 9.4-17 Sh 11 R03 9.4-17 Sh 12 R05 9.4-17 Sh 13 R21 9.4-18 Sh 1 R03 9.4-18 Sh 2 R10 9.4-18 Sh 3 R10 9.4-18 Sh 4 R10 9.4-19 Sh 1 R10 9.4-19 Sh 2 R03 9.4-19 Sh 3 R03 9.4-20 Sh 1 R03 9.4-20 Sh 2 R03 9.4-20 Sh 3 R03 9.4-20 Sh 4 R22 9.4-20 Sh 5 R03 9.4-21 Sh 1 R03 9.4-21 Sh 2 R03 9.4-21 Sh 3 R00 9.4-21 Sh 4 R03 9.4-22a R13 9.4-22b R14 9.4-22c R20 9.4-22d R19 9.4-22e R09 9.4-23 Sh 1 R03 9.4-23 Sh 2 R07 9.4-23 Sh 3 R03 9.4-23 Sh 4 R03 9.4-23 Sh 5 R00 9.4-23 Sh 6 R19 9.4-23 Sh 7 R03 9.5-1a R20 9.5-1b R20 9.5-1c R22 9.5-1d R22 9.5-1e R22 9.5-1f R22 9.5-1g R22 9.5-1h R22
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-6 Rev. 25, October 2022 9.5-2a R22 9.5-2b R22 9.5-3a R22 9.5-3b R22 9.5-3c R22 9.5-4a R22 9.5-5 Sh 1 R18 9.5-5 Sh 2 R05 9.5-6 R25 9.5-7 R25 9.5-8 Sh 1 R22 9.5-8 Sh 2 R22 9.5-9 Sh 1 R02 9.5-9 Sh 2 R22 9.5-10 Sh 1 R08 9.5-10 Sh 2 R05 9.5-11 R23 9.5-12 R02 9.5-13 R23 9.5-14 R05 9.5-15 R23 9.5-16 R02 9.5-17 R05 9.5-18 R10 9.5-19 R02 9.5-20 Sh 1 R05 9.5-20 Sh 2 R13 9.5-21 R22 9.5-22 R22 9.5-23 R02 9.5-24 R08 9.5-25 R20 9.5-26 Sh 1 R03 9.5-26 Sh 2 R03 9.5-27 R02 9.5-28 R02 9.5-29 R08 9.5-30 R22 9.5-31 R02 9.5-32 R19 9.5-33 R05 9.5-34 R05 9.5-35 R25 9.5-36 R23 9.5-37 R02 9.5-38 R02 9.5-39 R02 9.5-40a R23 9.5-40b R21 9.5-40c R10 9.5-41 Sh 1 R10 9.5-41 Sh 2 R10 9.5-41 Sh 3 R10 9.5-41 Sh 4 R03 9.5-41 Sh 5 R05 9.5-41 Sh 6 R03 9.5-41 Sh 7 R15 9.5-41 Sh 8 R03 9.5-41 Sh 9 R03 9.5-41 Sh 10 R03 9.5-41 Sh 11 R03 9.5-41 Sh 12 R02 9.5-42 R08 9.5-43 A07 9.5-44 Sh 1 A28 9.5-44 Sh 2 A28 9.5-45 A08 9.5-46 A28 9.5-47 A07 9.5-48 R18 9.5-49 R04 9.5-50 R04 9.5-51 R04 9.5-52a R21 9.5-52b R16 9.5-52c R23 9.5-53 Sh 1 R03 9.5-53 Sh 2 R03 9.5-53 Sh 3 R03 9.5-53 Sh 4 R23 9.5-53 Sh 5 R23 9.5-53 Sh 6 R05 9.5-53 Sh 7 R05 9A.3-1 R18 9A.3-2 R21 9A.3-3 R20 9A.3-4 R23 9A.3-5 R23 9A.3-6 R23 9A.3-7 R22 9A.3-8 R22 9A.3-9 A23 9A.3-10 A23 9A.3-11 A23
NMP Unit 2 USAR Chapter 9 LIST OF EFFECTIVE FIGURES Revision Revision Figure No.
Number Figure No.
Number Chapter 09 EF 9-7 Rev. 25, October 2022 9A.3-12 R00 9A.3-13 R00 9A.3-14 Sh 1 R00 9A.3-14 Sh 2 A28 9A.3-15 Sh 1 A28 9A.3-15 Sh 2 A28 9A.3-16 Sh 1 R15 9A.3-16 Sh 2 A28 9A.3-17 Sh 1 R03 9A.3-17 Sh 2 A28 9A.3-18 R00 9A.3-19 A28 9A.3-20 A28 9A.3-21 A28 9A.3-22 R13 9A.3-23 R03 9A.3-24 R13 9B.4-1 R10 9B.4-2 R16 9B.6-1 A04 5-1 R10 5-2 R21 5-3 R10 5-4 Sh 1 R22 5-4 Sh 2 R22
NMP Unit 2 USAR CHAPTER 9 - AUXILIARY SYSTEMS TABLE OF CONTENTS Table Number Title Chapter 09 9-i Rev. 25, October 2022 9.1 FUEL STORAGE AND HANDLING 9.1.1 New Fuel Storage 9.1.1.1 Design Bases 9.1.1.1.1 Safety Design Bases 9.1.1.1.2 Storage Design Bases 9.1.1.2 Facilities Description 9.1.1.3 Safety Evaluation 9.1.1.3.1 Criticality Control 9.1.1.3.2 Structural Design 9.1.1.3.3 Protection Features of Fuel Storage Facilities 9.1.2 Spent Fuel Storage 9.1.2.1 Design Bases 9.1.2.2 Facilities Description 9.1.2.3 Safety Evaluation 9.1.3 Spent Fuel Pool Cooling and Cleanup System 9.1.3.1 Design Bases 9.1.3.2 Description 9.1.3.3 Safety Evaluation 9.1.3.4 Inspection and Testing 9.1.3.5 Instrumentation Requirements 9.1.4 Fuel Handling System 9.1.4.1 Design Bases 9.1.4.1.1 Fuel Handling Equipment 9.1.4.1.2 Reactor Building Polar Crane 9.1.4.2
System Description
9.1.4.2.1 Spent Fuel Shipping Cask 9.1.4.2.2 Reactor Building Polar Crane 9.1.4.2.3 Fuel Servicing Equipment 9.1.4.2.4 Servicing Aids 9.1.4.2.5 Reactor Vessel Servicing Equipment 9.1.4.2.6 In-Vessel Servicing Equipment 9.1.4.2.7 Refueling Equipment 9.1.4.2.8 Storage Equipment 9.1.4.2.9 Refueling Seal 9.1.4.2.10 Under Reactor Vessel Servicing Equipment 9.1.4.2.11 Description of Fuel Transfer 9.1.4.3 Safety Evaluation - Fuel Handling System 9.1.4.4 Inspection and Testing Requirements 9.1.4.4.1 Inspection 9.1.4.4.2 Testing 9.1.4.5 Instrumentation Requirements 9.1.4.5.1 Refueling and Servicing Equipment 9.1.4.5.2 Refueling Platform 9.1.4.5.3 Fuel Support Grapple 9.1.4.5.4 Reactor Building Polar Crane
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-ii Rev. 25, October 2022 9.1.4.5.5 Radiation Monitoring 9.1.5 This Section Deleted 9.1.6 Alternate Decay Heat Removal System 9.1.6.1 Design Basis 9.1.6.2 Description 9.1.6.3 Safety Evaluation 9.1.6.4 Inspection and Testing 9.1.6.5 Instrumentation Requirements 9.1.7 Dry Cask Storage 9.1.8 References 9.2 WATER SYSTEMS 9.2.1 Service Water System 9.2.1.1 Design Bases 9.2.1.1.1 Safety Design Bases 9.2.1.1.2 Power Generation Design Bases 9.2.1.2
System Description
9.2.1.3 Safety Evaluation 9.2.1.4 Testing and Inspection Requirements 9.2.1.5 Instrumentation Requirements 9.2.2 Reactor Building Closed Loop Cooling Water System 9.2.2.1 Design Bases 9.2.2.2
System Description
9.2.2.3 Safety Evaluation 9.2.2.4 Testing and Inspection Requirements 9.2.2.5 Instrumentation Requirements 9.2.3 Makeup Water Treatment System 9.2.3.1 Design Bases 9.2.3.1.1 Safety Design Bases 9.2.3.1.2 Power Generation Design Bases 9.2.3.2
System Description
9.2.3.3 Safety Evaluation 9.2.3.4 Test and Inspection 9.2.3.5 Instrumentation Requirements 9.2.4 Domestic Water and Sanitary Drains and Disposal Systems 9.2.4.1 Design Bases 9.2.4.2
System Description
9.2.4.3 Safety Evaluation 9.2.4.4 Testing and Inspection Requirements 9.2.5 Ultimate Heat Sink 9.2.5.1 Design Basis 9.2.5.2
System Description
9.2.5.2.1 Intake System 9.2.5.2.2 Discharge System 9.2.5.2.3 Fish Bypass System 9.2.5.2.4 Tempering System 9.2.5.3 Safety Evaluation 9.2.5.3.1 Compliance with Regulatory Guide 1.27
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-iii Rev. 25, October 2022 9.2.5.3.2 Recirculation of Effluents 9.2.5.3.3 Effect of Failure of the St.
Lawrence Power Project on Low Lake Levels 9.2.5.3.4 Evaluation of Effects of Transportation Accidents on Operation of the Ultimate Heat Sink 9.2.5.3.5 Evaluation of Effects of Accidental Releases of Oil on the Intake Structure 9.2.5.4 Inspection and Testing Requirements 9.2.5.5 Instrumentation Requirements 9.2.6 Condensate Storage Facilities 9.2.6.1 Design Bases 9.2.6.1.1 Safety Design Bases 9.2.6.1.2 Power Generation Design Bases 9.2.6.2
System Description
9.2.6.3 Safety Evaluation 9.2.6.4 Test and Inspection 9.2.6.5 Instrumentation Requirements 9.2.7 Turbine Building Closed Loop Cooling Water System 9.2.7.1 Design Bases 9.2.7.1.1 Safety Design Bases 9.2.7.1.2 Power Generation Design Bases 9.2.7.2
System Description
9.2.7.3 Safety Evaluation 9.2.7.4 Testing and Inspection Requirements 9.2.7.5 Instrumentation Requirements 9.2.8 References 9.3 PROCESS AUXILIARIES 9.3.1 Compressed Air Systems 9.3.1.1 Instrument Air System 9.3.1.1.1 Design Bases 9.3.1.1.2
System Description
9.3.1.1.3 Safety Evaluation 9.3.1.1.4 Inspection and Testing Requirements 9.3.1.1.5 Instrumentation Requirements 9.3.1.2 Service Air System 9.3.1.2.1 Design Bases 9.3.1.2.2
System Description
9.3.1.2.3 Safety Evaluation 9.3.1.2.4 Inspection and Testing Requirements 9.3.1.2.5 Instrumentation Requirements 9.3.1.3 Breathing Air System 9.3.1.3.1 Design Bases 9.3.1.3.2
System Description
9.3.1.3.3 Safety Evaluation 9.3.1.3.4 Testing and Inspection 9.3.1.3.5 Instrumentation Requirements
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-iv Rev. 25, October 2022 9.3.1.4 Automatic Depressurization System 9.3.1.4.1 Design Bases 9.3.1.4.2
System Description
9.3.1.4.3 Safety Evaluation 9.3.1.4.4 Inspection and Testing Requirements 9.3.1.4.5 Instrumentation Requirements 9.3.1.5 Instrument Nitrogen System 9.3.1.5.1 Design Bases 9.3.1.5.2
System Description
9.3.1.5.3 Safety Evaluation 9.3.1.5.4 Inspection and Testing Requirements 9.3.1.5.5 Instrumentation Requirements 9.3.2 Process and Post-accident Sampling Systems 9.3.2.1 Design Bases 9.3.2.2
System Description
9.3.2.3 Safety Evaluation 9.3.2.4 Inspection and Testing Requirements 9.3.2.5 Instrumentation Requirements 9.3.2.5.1 Reactor Plant Sample System 9.3.2.5.2 Turbine Plant Sample System 9.3.2.5.3 Radwaste Sample System 9.3.3 Equipment and Floor Drain Systems 9.3.3.1 Design Basis 9.3.3.2
System Description
9.3.3.3 Safety Evaluation 9.3.3.4 Testing and Inspection Requirements 9.3.3.5 Instrumentation Requirements 9.3.4 Not Applicable 9.3.5 Standby Liquid Control System 9.3.5.1 Design Bases 9.3.5.2
System Description
9.3.5.3 Safety Evaluation 9.3.5.4 Testing and Inspection Requirements 9.3.5.5 Instrumentation Requirements 9.4 AIR CONDITIONING, HEATING, COOLING, AND VENTILATING SYSTEMS 9.4.1 Control Building and Normal Switchgear Building Heating, Ventilating, and Air Conditioning System 9.4.1.1 Design Bases 9.4.1.2
System Description
9.4.1.2.1 Main Control Room Elevation HVAC 9.4.1.2.2 Outdoor Air Special Filter Trains 9.4.1.2.3 Relay Room Elevation HVAC 9.4.1.2.4 Standby Switchgear/Battery Room HVAC 9.4.1.2.5 Basement HVAC 9.4.1.2.6 Electrical Tunnels HVAC
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-v Rev. 25, October 2022 9.4.1.2.7 Normal Switchgear Building HVAC 9.4.1.3 Safety Evaluation 9.4.1.4 Inspection and Testing Requirements 9.4.1.5 Instrumentation Requirements 9.4.1.5.1 Control Building 9.4.1.5.2 Main Control Room 9.4.1.5.3 Relay, Computer, and Remote Shutdown Rooms 9.4.1.5.4 Standby Switchgear and HPCS Switchgear Rooms 9.4.1.5.5 Normal Switchgear Building 9.4.1.5.6 Electrical Tunnels, Cable Area, Basement Cable Area, Cable Chase, Cable Shaft, Computer Battery Room, 24-V Battery Rooms, and Records Storage Vault 9.4.2 Reactor Building Heating, Ventilating, and Air Conditioning System 9.4.2.1 Design Bases 9.4.2.1.1 Drywell Cooling 9.4.2.1.2 Primary Containment Purge (CPS) 9.4.2.1.3 All Other Reactor Building Areas 9.4.2.2
System Description
9.4.2.2.1 Drywell Cooling 9.4.2.2.2 Primary Containment Purge 9.4.2.2.3 All Other Reactor Building Areas 9.4.2.3 Safety Evaluation 9.4.2.4 Testing and Inspection Requirements 9.4.2.5 Instrumentation Requirements 9.4.2.5.1 Drywell Cooling 9.4.2.5.2 Primary Containment Purge 9.4.2.5.3 All Other Reactor Building Areas 9.4.3 Radwaste Building Heating, Ventilating, and Air Conditioning System 9.4.3.1 Design Bases 9.4.3.2
System Description
9.4.3.2.1 Supply Air Subsystem 9.4.3.2.2 Unit Heaters Subsystem 9.4.3.2.3 General Area Exhaust Subsystem 9.4.3.2.4 Equipment Exhaust Subsystem 9.4.3.2.5 Liner Filling Hood Exhaust Subsystem 9.4.3.2.6 Smoke Exhaust Subsystem 9.4.3.2.7 Radwaste Decontamination General Area Air Conditioning Units 9.4.3.2.8 Radwaste Decontamination Clean Areas Return Air/Exhaust Fans 9.4.3.2.9 Radwaste Control Room Air Conditioning Units
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-vi Rev. 25, October 2022 9.4.3.2.10 Radwaste Control Room Return Air/Exhaust Fans 9.4.3.2.11 Radwaste Decontamination Dirty Area and Chemistry Laboratory Return/Exhaust System 9.4.3.2.12 Post-accident Sampling Equipment Exhaust 9.4.3.2.13 Chemistry Laboratory Air Conditioning Unit 9.4.3.2.14 Chemistry Laboratory Annex Air Conditioning Unit 9.4.3.3 Safety Evaluation 9.4.3.4 Testing and Inspection Requirements 9.4.3.5 Instrumentation Requirements 9.4.4 Turbine Building Heating, Ventilating, and Air Conditioning System 9.4.4.1 Design Bases 9.4.4.2
System Description
9.4.4.2.1 Supply Air Subsystem 9.4.4.2.2 Exhaust Air Subsystem 9.4.4.2.3 Unit Coolers Subsystem 9.4.4.2.4 Unit Heaters Subsystem 9.4.4.2.5 Sample Room Air Conditioning Subsystem 9.4.4.2.6 Charcoal Decay-Bed Room Air Conditioning Subsystem 9.4.4.2.7 Elevator Machine Rooms Ventilation 9.4.4.2.8 Smoke Removal 9.4.4.2.9 Additional Building Cooling 9.4.4.3 Safety Evaluation 9.4.4.4 Testing and Inspection Requirements 9.4.4.5 Instrumentation Requirements 9.4.4.5.1 Description 9.4.4.5.2 Operation 9.4.4.5.3 Monitoring 9.4.5 Service Building Heating and Ventilating System 9.4.5.1 Design Bases 9.4.5.2
System Description
9.4.5.3 Safety Evaluation 9.4.5.4 Testing and Inspection Requirements 9.4.5.5 Instrumentation Requirements 9.4.6 Diesel Generator Building Heating, Ventilating, and Air Conditioning System 9.4.6.1 Design Bases 9.4.6.2
System Description
9.4.6.2.1 Normal-Duty Heating 9.4.6.2.2 Normal-Duty Ventilation 9.4.6.2.3 Diesel Generator Control Room
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-vii Rev. 25, October 2022 Cooling 9.4.6.2.4 General Area Emergency Ventilation 9.4.6.3 Safety Evaluation 9.4.6.4 Testing and Inspection Requirements 9.4.6.5 Instrumentation Requirements 9.4.7 Miscellaneous Buildings' Heating, Ventilating, and Air Conditioning Systems 9.4.7.1 Design Bases 9.4.7.2
System Description
9.4.7.2.1 Screenwell Building Heating and Ventilating System 9.4.7.2.2 Service Water Pump Bays' HVAC System 9.4.7.2.3 Fire Pump Rooms' HVAC System 9.4.7.2.4 Demineralizer Water Storage Tank Building Heating and Ventilating System 9.4.7.2.5 Condensate Storage Tank Building Heating and Ventilating System 9.4.7.2.6 Electrical Bay Heating and Ventilating System 9.4.7.2.7 Screenhouse 9.4.7.2.8 Chiller Building 9.4.7.2.9 CWS Chemical Injection and Analysis Facility 9.4.7.3 Safety Evaluation 9.4.7.4 Testing and Inspection Requirements 9.4.7.5 Instrumentation Requirements 9.4.8 Auxiliary Boiler Building Heating and Ventilating System 9.4.8.1 Design Bases 9.4.8.2
System Description
9.4.8.2.1 Supply Air Subsystem 9.4.8.2.2 Exhaust Air Subsystem 9.4.8.2.3 Unit Heaters Subsystem 9.4.8.3 Safety Evaluation 9.4.8.4 Testing and Inspection Requirements 9.4.8.5 Instrumentation Requirements 9.4.9 Auxiliary Service Building Heating, Ventilating, and Air Conditioning System 9.4.9.1 Design Bases 9.4.9.2
System Description
9.4.9.2.1 Auxiliary Service Building and Clean Access Area 9.4.9.2.2 CO2 Tank Room 9.4.9.3 Safety Evaluation 9.4.9.4 Testing and Inspection Requirements 9.4.9.5 Instrumentation Requirements 9.4.10 Plant Chilled Water System 9.4.10.1 Control Building Chilled Water
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-viii Rev. 25, October 2022 Subsystem 9.4.10.1.1 Design Bases 9.4.10.1.2
System Description
9.4.10.1.3 Safety Evaluation 9.4.10.1.4 Testing and Inspection Requirements 9.4.10.1.5 Instrumentation Requirements 9.4.10.2 Ventilation Chilled Water Subsystem 9.4.10.2.1 Design Bases 9.4.10.2.2
System Description
9.4.10.2.3 Safety Evaluation 9.4.10.2.4 Testing and Inspection Requirements 9.4.10.2.5 Instrumentation Requirements 9.4.11 Plant Glycol Heating System 9.4.11.1 Design Bases 9.4.11.2
System Description
9.4.11.3 Safety Evaluation 9.4.11.4 Testing and Inspection Requirements 9.4.11.5 Instrumentation Requirements 9.4.12 Plant Hot Water Heating System 9.4.12.1 Design Bases 9.4.12.2
System Description
9.4.12.3 Safety Evaluation 9.4.12.4 Testing and Inspection Requirements 9.4.12.5 Instrumentation Requirements 9.5 OTHER AUXILIARY SYSTEMS 9.5.1 Fire Protection System 9.5.1.1 Design Bases 9.5.1.2
System Description
9.5.1.2.1 Water Supply 9.5.1.2.2 Fire Pumps 9.5.1.2.3 Yard Piping 9.5.1.2.4 Hose Stations 9.5.1.2.5 Wet-Pipe Sprinkler Systems 9.5.1.2.6 Dry-Pipe Sprinkler System 9.5.1.2.7 Preaction Sprinkler Systems 9.5.1.2.8 Water Deluge Systems 9.5.1.2.9 Carbon Dioxide Systems 9.5.1.2.10 Halon 1301 Systems 9.5.1.2.11 Portable Extinguishers 9.5.1.2.12 Breathing Apparatus 9.5.1.2.13 Fire Detection Systems 9.5.1.2.14 Fire Barriers 9.5.1.2.15 Egress 9.5.1.2.16 Building Construction 9.5.1.2.17 Drainage 9.5.1.2.18 Yard Transformers 9.5.1.2.19 Electrical Cable Protection 9.5.1.2.20 Seismic Design Requirements 9.5.1.2.21 Ventilation 9.5.1.3 Safety Evaluation (Fire Hazards
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-ix Rev. 25, October 2022 Analysis) 9.5.1.4 Inspection and Testing Requirements 9.5.1.5 Personnel Qualification and Testing 9.5.2 Communication Systems 9.5.2.1 Design Bases 9.5.2.1.1 Dial Telephone System 9.5.2.1.2 Radio Communication Systems 9.5.2.1.3 Page Party/Public Address System 9.5.2.1.4 Maintenance and Calibration Communication System 9.5.2.1.5 Sound-Powered Communication System 9.5.2.1.6 Strobe Lights 9.5.2.2
System Description
9.5.2.2.1 DELETED 9.5.2.2.2 DELETED 9.5.2.2.3 Page Party/Public Address Communication System 9.5.2.2.4 Maintenance and Calibration Communication System 9.5.2.2.5 Sound-Powered Communication System 9.5.2.3 Inspection and Testing Requirements 9.5.2.4 System Evaluation 9.5.3 Lighting Systems 9.5.3.1 Design Basis 9.5.3.2
System Description
9.5.3.3 Safety Evaluation 9.5.3.4 Inspection and Testing Requirements 9.5.4 Standby Diesel Generator Fuel Oil Storage and Transfer System 9.5.4.1 Design Bases 9.5.4.2
System Description
9.5.4.3 Safety Evaluation 9.5.4.4 Inspection and Testing Requirements 9.5.4.5 Instrumentation Requirements 9.5.5 Diesel Generator Cooling Water System 9.5.5.1 Design Bases 9.5.5.2
System Description
9.5.5.2.1 Division I and II Cooling Water System 9.5.5.2.2 Division III Cooling Water System 9.5.5.3 Instrumentation and Control Requirements 9.5.5.4 Inspection and Testing Requirements 9.5.5.5 Safety Evaluation 9.5.6 Diesel Generator Starting System 9.5.6.1 Design Bases 9.5.6.2
System Description
9.5.6.2.1 Division I and II Diesel Generator Starting System 9.5.6.2.2 Division III Diesel Generator
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-x Rev. 25, October 2022 Starting System 9.5.6.2.2.1 Air Compressor 9.5.6.2.2.2 Air Dryer 9.5.6.2.2.3 Air Receiver 9.5.6.2.2.4 System Performance 9.5.6.2.2.5 Control and Alarm 9.5.6.2.2.6 System Qualification 9.5.6.3 Instrumentation and Control 9.5.6.4 Testing and Inspection 9.5.6.5 Safety Evaluation 9.5.7 Diesel Generator Lubrication System 9.5.7.1 Design Bases 9.5.7.2
System Description
9.5.7.2.1 Division I and II Lubrication System 9.5.7.2.2 Division III Lubricating Oil System 9.5.7.3 Instrumentation Requirements 9.5.7.4 Inspection and Testing Requirements 9.5.7.5 Safety Evaluation 9.5.8 Diesel Generator Combustion Air Intake and Exhaust System 9.5.8.1 Design Bases 9.5.8.2
System Description
9.5.8.3 Instrumentation Requirements 9.5.8.4 Inspection and Testing Requirement 9.5.8.5 Safety Evaluation 9.5.9 Emergency Diesel Generator Cranes 9.5.9.1 Design Basis 9.5.9.2 Description 9.5.9.3 Safety Evaluation 9.5.10 Auxiliary Electric Boiler 9.5.10.1 Design Bases 9.5.10.1.1 Safety Design Basis 9.5.10.1.2 Design Basis 9.5.10.2
System Description
9.5.10.3 Safety Evaluation 9.5.10.4 Inspection and Testing Requirements 9.5.10.5 Instrumentation Requirements 9.5.11 Zinc Injection Passivation System 9.5.11.1 Design Bases 9.5.11.1.1 Safety Design Basis 9.5.11.1.2 Design Basis 9.5.11.2
System Description
9.5.12 Reference APPENDIX 9A DEGREE OF COMPLIANCE WITH BRANCH TECHNICAL POSITION CMEB 9.5-1, REV. 2, DATED JULY 1981 APPENDIX 9B APPENDIX R REVIEW SAFE SHUTDOWN EVALUATION
NMP Unit 2 USAR TABLE OF CONTENTS (Cont'd.)
Section Title Chapter 09 9-xi Rev. 25, October 2022 APPENDIX 9C THE CONTROL OF HEAVY LOADS AT NINE MILE POINT UNIT 2
NMP Unit 2 USAR CHAPTER 9-AUXILIARY SYSTEMS LIST OF TABLES Table Number Title Chapter 09 9-xii Rev. 25, October 2022 9.1-1 FUEL SERVICING EQUIPMENT 9.1-2 REACTOR VESSEL SERVICING EQUIPMENT 9.1-3 UNDER-REACTOR VESSEL SERVICING EQUIPMENT AND TOOLS 9.1-4 TOOLS AND SERVICING EQUIPMENT 9.1-5 WATER QUALITY FOR SPENT FUEL POOL 9.1-6 SPENT FUEL POOL COOLING HEAT EXCHANGERS 2SFC*E1A AND *E1B 9.1-7 ALTERNATE DECAY HEAT REMOVAL SYSTEM COMPONENTS 9.2-1A DIVISION I COMPONENTS REQUIRED SERVICE WATER FLOWS ASSUMING COMPLETE FAILURE OF DIVISION II 9.2-1B DIVISION II COMPONENTS REQUIRED SERVICE WATER FLOWS ASSUMING COMPLETE FAILURE OF DIVISION I 9.2-2 SERVICE WATER FLOW REQUIREMENTS FOR NORMAL POWER GENERATION 9.2-3 DESIGN DATA OF COMPONENTS SUPPLIED WITH REACTOR BUILDING CLOSED LOOP COOLING WATER 9.2-4 REACTOR BUILDING CLOSED LOOP COOLING WATER SYSTEM COMPONENT DESCRIPTION 9.2-5 EFFLUENT WATER QUALITY 9.2-6 INFLUENT WATER QUALITY 9.2-7 DEMINERALIZER DATA 9.2-8 INTAKE AND DISCHARGE BAY WATER SURFACE ELEVATIONS 9.2-9 MAJOR EQUIPMENT COOLED BY THE TURBINE BUILDING CLOSED LOOP COOLING WATER SYSTEM 9.3-1 PROCESS SAMPLE SYSTEMS 9.3-2 STANDBY LIQUID CONTROL SYSTEM OPERATING PRESSURE/TEMPERATURE CONDITIONS 9.3-3 SLCS COMPONENT MATERIAL AND SPECIFICATIONS 9.4-1 ENVIRONMENTAL AND SYSTEM DESIGN PARAMETERS FOR HVAC SYSTEMS
NMP Unit 2 USAR LIST OF TABLES (contd.)
Table Number Title Chapter 09 9-xiii Rev. 25, October 2022 9.4-2 DESIGN DATA OF PRINCIPAL EQUIPMENT - CONTROL BUILDING AND NORMAL SWITCHGEAR BUILDING HVAC SYSTEMS (HISTORICAL) 9.4-3 DESIGN DATA OF PRINCIPAL EQUIPMENT - REACTOR BUILDING HVAC SYSTEM (HISTORICAL) 9.4-4 DESIGN DATA OF PRINCIPAL EQUIPMENT - RADWASTE BUILDING HVAC SYSTEM (HISTORICAL) 9.4-5 DATA OF PRINCIPAL EQUIPMENT - TURBINE BUILDING HVAC SYSTEM (HISTORICAL) 9.4-6 DESIGN DATA OF PRINCIPAL EQUIPMENT - SERVICE BUILDING HEATING AND VENTILATING SYSTEM (HISTORICAL) 9.4-7 DESIGN DATA OF PRINCIPAL EQUIPMENT - DIESEL GENERATOR BUILDING HVAC SYSTEM (HISTORICAL) 9.4-8 DESIGN DATA OF PRINCIPAL EQUIPMENT - MISCELLANEOUS BUILDINGS HVAC SYSTEMS (HISTORICAL) 9.4-9 DESIGN DATA OF PRINCIPAL EQUIPMENT - AUXILIARY BOILER BUILDING HEATING AND VENTILATING SYSTEM (HISTORICAL) 9.4-10 DESIGN DATA OF PRINCIPAL EQUIPMENT - AUXILIARY SERVICE BUILDING HVAC SYSTEM (HISTORICAL) 9.4-11 DESIGN DATA OF PRINCIPAL EQUIPMENT - PLANT CHILLED WATER SYSTEM (HISTORICAL) 9.4-12 DESIGN DATA FOR THE PLANT GLYCOL AND HOT WATER HEATING SYSTEMS (HISTORICAL) 9.5-1 LIGHTING SYSTEM POWER SOURCE, PERCENTAGE, AND TYPE OF DISTRIBUTION 9.5-2 LIGHTING SYSTEM FIXTURE TYPE AND LIGHTING INTENSITY 9.5-3 DEVIATIONS FROM NFPA STANDARDS 9.5-3a DEVIATION TO NFPA STANDARD 14-3-2.1
NMP Unit 2 USAR CHAPTER 9-AUXILIARY SYSTEMS LIST OF FIGURES Figure Number Title Chapter 09 9-xiv Rev. 25, October 2022 9.1-1 NEW FUEL STORAGE RACK 9.1-1a NEW FUEL STORAGE FACILITY 9.1-2 SPENT FUEL STORAGE POOL 9.1-3 GENERAL ARRANGEMENT SPENT FUEL STORAGE RACKS 9.1-3a DELETED 9.1-3b MATHEMATICAL MODEL OF PHASE II AND FINAL PHASE SPENT FUEL POOL STORAGE RACKS 9.1-4 DELETED 9.1-4a BASIC RACK CELL GEOMETRY AND DIMENSIONS OF A TYPICAL PHASE II AND FINAL PHASE RACK 9.1-5 SPENT FUEL POOL COOLING AND CLEANUP SYSTEM (SHEETS A THROUGH D) 9.1-6 SPENT FUEL POOL COOLING AND CLEANUP SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 8) 9.1-7 REFUELING PLATFORM 9.1-8 FUEL GRAPPLE 9.1-9 NEW FUEL INSPECTION STAND 9.1-10 CHANNEL BOLT WRENCH 9.1-11 CHANNEL HANDLING TOOL 9.1-12 CHANNEL GAUGING FIXTURE 9.1-13 GENERAL PURPOSE GRAPPLE 9.1-14 GENERAL AREA UNDERWATER LIGHTS 9.1-15 LOCAL AREA UNDERWATER LIGHTS 9.1-16 GENERAL PURPOSE VIEWING AID 9.1-17 HEAD HOLDING PEDESTAL 9.1-18 HEAD NUT & WASHER RACK
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xv Rev. 25, October 2022 9.1-19 LIFTING STRONGBACK & SLINGS 9.1-19a LIFTING SLING 9.1-20 LIFTING RIG FOR STEAM DRYER OR STEAM SEPARATOR 9.1-20a ALTERNATE LIFTING RIG FOR STEAM DRYER OR STEAM SEPARATOR 9.1-21 SERVICE PLATFORM 9.1-22 INSTRUMENT HANDLING TOOL 9.1-23 PORTABLE RADIATION SHIELD 9.1-24 DECONTAMINATION PLATFORM 9.1-25 REFUELING FLOOR LAYOUT 9.1-26a DELETED 9.1-27 CAROUSEL STRONGBACK LIFTING RIG ARRANGEMENT 9.1-28a ALTERNATE DECAY HEAT REMOVAL SYSTEM 9.2-1 SERVICE WATER SYSTEM (SHEETS A THROUGH Q) 9.2-2 SERVICE WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 27) 9.2-3 REACTOR BUILDING CLOSED LOOP COOLING WATER (SHEETS A THROUGH G) 9.2-4 REACTOR BUILDING CLOSED LOOP COOLING WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 12) 9.2-5 MAKEUP WATER TREATING (SHEETS A THROUGH E) 9.2-6a MAKEUP WATER STORAGE 9.2-7 DEMINERALIZED MAKEUP WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 12) 9.2-8 DOMESTIC WATER SYSTEM (SHEETS A AND B) 9.2-9 SANITARY PLUMBING SYSTEM (SHEETS A AND B) 9.2-10 DELETED thru 9.2-12
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xvi Rev. 25, October 2022 9.2-13 SCREENWELL LAYOUT 9.2-14 DELETED 9.2-15 PREDICTED TEMPERATURE DISTRIBUTION - VERTICAL SECTION ALONG CENTERLINE 9.2-16 LAKE CURRENT CHARACTERISTICS 9.2-17 CONDENSATE STORAGE AND TRANSFER (SHEETS A THROUGH C) 9.2-18 CONDENSATE STORAGE FACILITIES LOGIC DIAGRAM (SHEETS 1 THROUGH 4) 9.2-19 TURBINE BUILDING CLOSED LOOP COOLING (SHEETS A THROUGH F) 9.2-20 TURBINE BUILDING CLOSED LOOP COOLING WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 5) 9.2-21 COMBINED UNIT 1 AND 2 SEWAGE TREATMENT FACILITY 9.3-1 INSTRUMENT AND SERVICE AIR (SHEETS A THROUGH M) 9.3-2 COMPRESSED AIR SYSTEMS LOGIC DIAGRAM (SHEETS 1 THROUGH 13) 9.3-3 BREATHING AIR SYSTEM (SHEETS A THROUGH E) 9.3-4 BREATHING AIR SYSTEM LOGIC DIAGRAM 9.3-5 PROCESS SAMPLING SYSTEM (SHEETS A THROUGH K) 9.3-6 REACTOR PLANT SAMPLING SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 4) 9.3-7 TURBINE PLANT SAMPLING SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 8) 9.3-8 RADWASTE BUILDING SAMPLING SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 3) 9.3-9 REACTOR BUILDING EQUIPMENT AND FLOOR DRAINS (SHEETS A THROUGH E) 9.3-9f DRYWELL EQUIPMENT DRAINS 9.3-10 TURBINE BUILDING DRAINS (SHEETS A THROUGH J)
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xvii Rev. 25, October 2022 9.3-11 RADWASTE BUILDING DRAINS (SHEETS A THROUGH E) 9.3-12 MISCELLANEOUS FLOOR DRAINS (SHEETS A THROUGH L) 9.3-13 REACTOR BUILDING FLOOR AND EQUIPMENT DRAINS LOGIC DIAGRAM (SHEETS 1 THROUGH 10) 9.3-14 TURBINE BUILDING FLOOR AND EQUIPMENT DRAINS LOGIC DIAGRAM (SHEETS 1 THROUGH 4) 9.3-15 RADWASTE BUILDING FLOOR AND EQUIPMENT DRAINS LOGIC DIAGRAM 9.3-16 FLOOR AND EQUIPMENT DRAINS - MISCELLANEOUS BUILDINGS LOGIC DIAGRAM (SHEETS 1 THROUGH 9) 9.3-17a STANDBY LIQUID CONTROL 9.3-18 REGION OF ACCEPTABLE NEUTRON ABSORBER SOLUTION CONCENTRATION AND VOLUME 9.3-19 SATURATION TEMPERATURE OF SODIUM PENTABORATE SOLUTION 9.3-20 NITROGEN SYSTEM (SHEETS A AND B) 9.4-1 CONTROL BUILDING HVAC SYSTEM (SHEETS A THROUGH F) 9.4-2 MISCELLANEOUS HVAC SYSTEMS (SHEETS A THROUGH E) 9.4-3 CHILLED WATER AND NORMAL SWITCHGEAR BUILDING VENTILATION (SHEETS A THROUGH F) 9.4-4 CONTROL BUILDING HVAC SYSTEM - MAIN CONTROL ROOM LOGIC DIAGRAM (SHEETS 1 THROUGH 9) 9.4-5 CONTROL BUILDING HVAC SYSTEM - RELAY AND COMPUTER ROOMS LOGIC DIAGRAM (SHEETS 1 THROUGH 8) 9.4-6 CONTROL BUILDING HVAC SYSTEM - NORMAL SWITCHGEAR BUILDING LOGIC DIAGRAM (SHEETS 1 THROUGH 7) 9.4-7 CONTROL BUILDING HVAC SYSTEM - MISCELLANEOUS ROOMS AND AREAS LOGIC DIAGRAM (SHEETS 1 THROUGH
- 14) 9.4-8 REACTOR BUILDING VENTILATION AND CATEGORY I AREA COOLERS, DRYWELL COOLING, PRIMARY CONTAINMENT
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xviii Rev. 25, October 2022 PURGE AND STANDBY GAS TREATMENT (SHEETS A THROUGH M) 9.4-9 REACTOR BUILDING HVAC SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 26) 9.4-10 RADWASTE BUILDING VENTILATION (SHEETS A THROUGH E) 9.4-11 RADWASTE BUILDING HVAC SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 17) 9.4-12 TURBINE BUILDING VENTILATION (SHEETS A THROUGH D) 9.4-13 TURBINE BUILDING HVAC SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 12) 9.4-14 SERVICE BUILDING HEATING AND VENTILATING SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 3) 9.4-15a DIESEL GENERATOR BUILDING HVAC SYSTEM 9.4-16 DIESEL GENERATION BUILDING HVAC SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 9) 9.4-17 MISCELLANEOUS BUILDINGS HVAC SYSTEMS LOGIC DIAGRAM (SHEETS 1 THROUGH 13) 9.4-18 AUXILIARY BOILER ROOM HEATING AND VENTILATING SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 4) 9.4-19 AUXILIARY SERVICE BUILDING HVAC SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 3) 9.4-20 CONTROL BUILDING CHILLED WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 5) 9.4-21 VENTILATION CHILLED WATER SYSTEM LOGIC DIAGRAM (SHEETS 1 THROUGH 4) 9.4-22 PLANT HOT WATER HEATING AND GLYCOL HEATING SYSTEMS (SHEETS A THROUGH E) 9.4-23 PLANT HEATING SYSTEM - HOT WATER HEATING LOGIC DIAGRAM (SHEETS 1 THROUGH 7) 9.5-1 FIRE PROTECTION WATER SYSTEM (SHEETS A THROUGH H) 9.5-2 FIRE PROTECTION FOAM (SHEETS A AND B)
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xix Rev. 25, October 2022 9.5-3 FIRE PROTECTION CO2 SYSTEM (SHEETS A THROUGH C) 9.5-4a FIRE PROTECTION HALON SYSTEM 9.5-5 COMMUNICATIONS PLAN NORMAL STANDBY & HPCS SWITCHGEAR ROOMS (SHEETS 1 AND 2) 9.5-6 COMMUNICATIONS PLAN CONTROL BUILDING RELAY &
COMPUTER ROOM EL 288'-0" 9.5-7 COMMUNICATIONS PLAN MAIN CONTROL ROOM EL 306'-0" 9.5-8 COMMUNICATION PLAN TURBINE BUILDING EL 250'-0" (SHEETS 1 AND 2) 9.5-9 COMMUNICATION PLAN TURBINE BUILDING EL 277'-0" (SHEETS 1 AND 2) 9.5-10 COMMUNICATION PLAN TURBINE BUILDING EL 306'-0" (SHEETS 1 AND 2) 9.5-11 COMMUNICATION PLAN REACTOR BUILDING EL 175'-0" 9.5-12 COMMUNICATION PLAN REACTOR BUILDING EL 196'-0" 9.5-13 COMMUNICATION PLAN REACTOR BUILDING EL 215'-0" 9.5-14 COMMUNICATION PLAN REACTOR BUILDING EL 240'-0" 9.5-15 COMMUNICATION PLAN REACTOR BUILDING EL 261'-0" 9.5-16 COMMUNICATION PLAN REACTOR BUILDING EL 289'-0" 9.5-17 COMMUNICATION PLAN REACTOR BUILDING EL 306'-0" 9.5-18 COMMUNICATIONS PLAN REACTOR BUILDING EL 328'-10" 9.5-19 COMMUNICATION PLAN REACTOR BUILDING EL 353'-10" 9.5-20 COMMUNICATION PLAN REACTOR AUXILIARY BAYS NORTH &
SOUTH (SHEETS 1 AND 2) 9.5-21 COMMUNICATION PLAN RADWASTE BUILDING EL 240'-2" AND EL 261'-0" 9.5-22 COMMUNICATION PLAN RADWASTE BUILDING EL 279'-0" AND EL 291'-6" 9.5-23 COMMUNICATION PLAN RADWASTE BUILDING EL 309'-0"
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xx Rev. 25, October 2022 9.5-24 COMMUNICATION PLAN SCREENWELL BUILDING 9.5-25 COMMUNICATION PLAN MAIN STACK 9.5-26 COMMUNICATION PLAN ELECTRICAL TUNNELS (SHEETS 1 AND 2) 9.5-27 COMMUNICATION PLAN HEATER BAYS EL 250'-0" 9.5-28 COMMUNICATION PLAN HEATER BAYS EL 277'-6" 9.5-29 COMMUNICATIONS PLAN VENTILATION EQUIPMENT ROOM EL 306'-0" 9.5-30 COMMUNICATION PLAN AUXILIARY SERVICE & AUXILIARY BOILER BUILDING 9.5-31 COMMUNICATION PLAN PIPE TUNNELS 9.5-32 COMMUNICATION PLAN MISCELLANEOUS BUILDING 9.5-33 COMMUNICATION PLAN COOLING TOWER AND SCREENHOUSE 9.5-34 COMMUNICATION PLAN DIESEL GENERATOR BUILDING 9.5-35 COMMUNICATION PLAN CONTROL BUILDING EL 214'-0" &
HVAC ROOMS 9.5-36 COMMUNICATION PLAN NORMAL SWITCHGEAR & CONTROL BUILDING EL 237'-0" 9.5-37 COMMUNICATION PLAN 115 & 345-KV SWITCHYARD 9.5-38 COMMUNICATION PLAN SCREENWELL 9.5-39 COMMUNICATION PLAN PIPE TUNNELS 9.5-40 STANDBY DIESEL GENERATOR SYSTEM (SHEETS A THROUGH C) 9.5-41 DIESEL GENERATOR FUEL OIL STORAGE AND TRANSFER SYSTEM, STARTING SYSTEM, AIR START SYSTEM DIVISION III, COOLING SYSTEM DIVISION III, LUBRICATION SYSTEM DIVISION III, FUEL OIL SYSTEM DIVISION III LOGIC DIAGRAM (SHEETS 1 THROUGH 12) 9.5-42 DIESEL GENERATOR COOLING WATER DIVISION I & II 9.5-43 DIESEL GENERATOR COOLING WATER DIVISION III
NMP Unit 2 USAR LIST OF FIGURES (contd.)
Figure Number Title Chapter 09 9-xxi Rev. 25, October 2022 9.5-44 DELETED thru 9.5-46 9.5-47 LUBRICATION SYSTEM DIVISION I AND DIVISION II DIESEL GENERATOR 9.5-48 LUBRICATION SYSTEM DIVISION III DIESEL GENERATOR 9.5-49 DELETED thru 9.5-51 9.5-52 AUXILIARY BOILER SYSTEM (SHEETS A THROUGH C) 9.5-53 AUXILIARY BOILER SYSTEM - STEAM LOGIC DIAGRAM (SHEETS 1 THROUGH 7)