BYRON 2022-0081, CFR72.48 Evaluation Summary Report

From kanterella
Revision as of 11:54, 27 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
CFR72.48 Evaluation Summary Report
ML22343A072
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/09/2022
From: Welt H
Constellation Energy Generation
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
BYRON 2022-0081
Download: ML22343A072 (1)


Text

Constellation December 09, 2022 LTR:

BYRON 2022-0081 File:

1D.101 5F.108 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Byron Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG)

Byron Station 4450 N German Church Road Byron. IL 61010-9794 www.constellationenergy.com 10 CFR 72.48 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRG Docket Nos. STN 50-454 and STN 50-455

Subject:

1 O CFR 72.48 Evaluation Summary Report The purpose of this letter is to submit the initial biennial report of changes, tests, or experiments, performed by Constellation Energy Generation, LLC (CEG) for the Byron Station (Byron) Independent Spent Fuel Storage Installation (ISFSI), as required by 10 CFR 72.48, "Changes, tests, and experiments," paragraph (d)(2). Subsequent reports will be provided within an interval of 24 months, as required by 10 CFR 72.48(d)(2).

This report addresses the period from November 1, 2020 through October 31, 2022.

There were no 1 O CFR 72.48 Evaluations performed for the Byron ISFSI during this period. Thus, no 10 CFR 72.48 Evaluation summaries are provided.

There are no regulatory commitments contained in this letter.

Should you have any questions, please contact Zoe Cox, Regulatory Assurance Manager, at (815) -406-2800.

Respectfully, Harris Welt Site Vice President Byron Generating Station HW/ZC/sg cc: NRG Regional Administrator - NRG Region Ill