NRR E-mail Capture - Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request
ML23052A077
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/21/2023
From: Robert Kuntz
NRC/NRR/DORL/LPL3
To: Steinman R
Constellation Energy Generation
References
L-2022-LLE-0004
Download: ML23052A077 (3)


Text

From:

Robert Kuntz Sent:

Tuesday, February 21, 2023 10:02 AM To:

rebecca.steinman@constellation.com

Subject:

Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request (EPID: L-2022-LLE-0004)

By letter dated January 27, 2023, Constellation Energy Generation, LLC, submitted an exemption request from the requirements in Title 10 of the Code of Federal Regulations (10 CFR) 2.109(b) for Quad Cities Nuclear Power Station, Units 1 and 2. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to 10 CFR 50.12, Specific Exemption, an exemption can be granted by the Commission if the exemption is authorized by law, will not present undue risk to the public health and safety, and are consistent with the common defense and security. The Commission will not consider granting an exemption unless special circumstances are present.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> to complete. The NRC staff expects to complete this review in approximately 4 months, which is June 22, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier:

NRR_DRMA Email Number:

1952 Mail Envelope Properties (SA9PR09MB464019DBA81182C50577606099A59)

Subject:

Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance Timely Renewal Exemption Request (EPID L-2022-LLE-0004)

Sent Date:

2/21/2023 10:01:54 AM Received Date:

2/21/2023 10:01:00 AM From:

Robert Kuntz Created By:

Robert.Kuntz@nrc.gov Recipients:

"rebecca.steinman@constellation.com" <Rebecca.Steinman@constellation.com>

Tracking Status: None Post Office:

SA9PR09MB4640.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3022 2/21/2023 10:01:00 AM Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date: