ML24149A115
Jump to navigation
Jump to search
| ML24149A115 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/13/2024 |
| From: | NRC/RGN-III/DORS/OB |
| To: | |
| Travis Iskierka-Boggs | |
| Shared Package | |
| ML22251A163 | List: |
| References | |
| NRC-24-0023 | |
| Download: ML24149A115 (1) | |
Text
Form 5.1-1 Post examination Check Sheet Post examination Check Sheet Facility: Fermi, Unit 2 Dates of Examination: 2/26/24 - 3/1/2024 Activity Description Date Complete
- 1. *Received post examination package from facility licensee and verified complete. (ES-4.4) 03/11/2024
- 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)
N/A
- 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6)
N/A
- 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 03/21/2024
- 5. Completed licensing official review.
03/21/2024
- 6. Mailed licenses, preliminary results, and pass letters.
03/21/2024
- 7. Notified facility licensee of results.
03/21/2024
- 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
04/01/2024
- 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
N/A
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
05/28/2024
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.