3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5
| ML24242A224 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 08/21/2024 |
| From: | Reid B ADP CR3 |
| To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 3F0824-01 | |
| Download: ML24242A224 (1) | |
Text
SAFEGUARDS INFORMATION ADP CR3, LLC 15760 West Power Line Street I Crystal River, FL 34428 Docket 50-302 / 72-1035 License DPR-72 Billy Reid, Site Executive Cellphone: 865-384-6789 Email: breid@northstar.com August 21, 2024 3F0824-01 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(p) 5r,- so2.
72-/D 35
Subject:
References:
Crystal River Unit 3 - Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5
- 1. Letter, ADP CR3 to USNRC, "Crystal River Unit 3 - Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4," dated February 20, 2024 (3F0224-04) (ML24054A037 Package)
Dear Sir or Madam:
In accordance with 10 CFR 50.54(p), ADP CR3, LLC (ADP CR3) hereby submits the Crystal River Unit 3) Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5.
By letter dated February 20, 2024, ADP CR3 notified the NRC of Revision 4 to the Crystal River Unit 3 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (the Security Plan) in order to comply with new rule 10 CFR 73, Enhanced Weapons, Firearms Background Checks, and Security Event Notifications effective April 13, 2023. ADP CR3 was compliant with this final rule by the required compliance date of January 8, 2024.
Subsequently, an outdated reference to 10 CFR 73.71 was identified in Revision 4. Section 22 of the Security Plan states the notification to the NRC for suspension of security measures must be completed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in accordance with 10 CFR 73.71. The reference to 73.71 is no longer applicable.
SOt>}
N iYl.SS 2b NOTE: ENCLOSURE 1 TO THIS LETTER is DECONTROLLED WHEN SEPARATED FROM ENCLOSURE 2 AND ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION".
THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.
UPON SEPARATION FROM ENCLOSURE 2, THIS LETTER IS DECONTROLLED.
SAFEGUARDS INFORMATION N fLfl t0rn S ~
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission 3F0824-01 Page 2 of 2 The Security Plan revision now states that the notifications to the NRC will be made no later than the reporting requirements of 10 CFR 73.1200 Notification of Physical Security Events and 73.1205 Written Follow-up Reports of Physical Security Events.
This revision 5 to the Security Plan is an editorial change and includes a minor change to the definition of"Authorized Weapon" to align with the formatting of other definitions in Appendix A.
An evaluation of the Security Plan revision, in accordance with 10 CFR 50.54(p)(2), has determined that the incorporated changes do not reduce the effectiveness of the plan and that the plan continues to meet the standards of 10 CFR 72.212(b)(9).
This letter includes two enclosures. Enclosure 1 contains a Summary Description of Changes. is Safeguards Information as defined in 10 CFR 73.2 and contains a copy of the Crystal River Unit 3 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5.
No new regulatory commitments have been made in this letter.
If you have any questions regarding this submittal, please contact Mr. Craig Miller, ISFSI Licensing Manager, at (352) 634-3954.
Sincere},
Bill Nuc xecutive BR/elm
Enclosures:
- 1. Summary Description of Changes
- 2. CR-3 ISFSI Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 (Safeguards Information) cc:
NMSS Project Manager Regional Administrator, Region I NOTE: ENCLOSURE 1 TO THIS LETTER is DECONTROLLED WHEN SEPARATED FROM ENCLOSURE 2 AND ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION".
THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.
UPON SEPARATION FROM ENCLOSURE 2, THIS LETTER IS DECONTROLLED.
SAFEGUARDS INFORMATION
0 SAFEGUARDS INFORMATION U. S. Nuclear Regulatory Commission 3F0824-01 ADP CR3, LLC DOCKET NUMBERS 50 - 302 / 72 -1035 LICENSE NUMBER DPR - 72 ENCLOSURE 1
SUMMARY
DESCRIPTION OF CHANGES ENCLOSURE 1 TO THIS LETTER IS DECONTROLLED WHEN SEPARATED FROM ENCLOSURE 2 AND ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION".
THIS INFORMATION MUST BE PROTECTED ACCORDINGLY.
SAFEGUARDS INFORMATION
SAFEGUARDS lNFORMATION ENCLOSURE 1 Crystal River Unit 3 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 5 Change Matrix Change#
Location Description of Change Justification 1
Throughout Changed, Security Plan revision number from Revision 4 In accordance with 10 CFR 50.54(p), Security Plan to Revision 5 revision number chanae Removed, "Suspension of security measures are reported in accordance with 10 CFR 73.71. Reports made under 10 CFR 50.72 need not be duplicated under 10 CFR 73.71 reporting requirements."
The reference to 73.71 is no longer applicable and the 2
22.1.3.
Added, "Suspension of security measures are reported in reference to 50. 72 is redundant.
accordance with 10 CFR 73.1200 Notification of Physical Security Events and 73.1205 Written Follow-up Reports of Physical Security Events."
Removed, "Upon temporary suspension of any security measures pursuant to this section, the ISFSI Shift Supervisor shall notify the NRC Operations Center as soon as practical and in all cases within one hour of the occurrence."
Per new rule 10 CFR 73, Enhanced Weapons, 3
22.2.3.
Firearms Background Checks, and Security Event Added, "Upon temporary suspension of any security Notifications.
measures pursuant to this section, the ISFSI Shift Supervisor shall notify the NRC Operations Center as soon as practical and no later than the reporting requirements of 10 CFR 73.1200" NOTE: ENCLOSURE 1 TO THIS LETTER IS DECONTROLLED WHEN SEP ARA TED FROM ENCLOSURE 2 AND ENCLOSURE 2 TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION". TIDS INFORMATION MUST BE PROTECTED ACCORDINGLY.
UPON SEPARATION FROM ENCLOSURE 2, TIIIS ENCLOSURE IS DECONTROLLED.
SAFEGUARDS INFORMATION
SAFEGUARDS I~FORMA TION ENCLOSUREl Crystal River Unit 3 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan Revision 5 Change Matrix 4
Appendix A Added, "means weapons" to the definition of Authorized This change is formatting only and aligns with the Weapons formatting of the definitions in Appendix A.
NOTE: ENCLOSURE 1 TO THIS LETTER IS DECONTROLLED WHEN SEP ARA TED FROM ENCLOSURE 2 AND ENCLOSURE 2 TO TIIlS LETTER CONTAINS "SAFEGUARDS INFORMATION". TIIlS INFORMATION MUST BE PROTECTED ACCORDINGLY.
UPON SEP ARA TI ON FROM ENCLOSURE 2, THIS ENCLOSURE IS DECONTROLLED.
SAFEGUARDS INFORMATION