Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance, Acceptance, Acceptance
- Supplement
|
MONTHYEARLR-N20-0010, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2020-04-24024 April 2020 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology Project stage: Request ML20302A2012020-10-22022 October 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 - Acceptance Review (L-2020-LLA-0219) Project stage: Acceptance Review ML20296A6232020-10-22022 October 2020 Request for NRC Approval to Apply Leak-Before-Break Methodology to Reactor Coolant System Branch Piping Project stage: Request ML20338A5422020-12-0303 December 2020 Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Request ML20346A1032020-12-11011 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 LBB LAR - Acceptance Review (L-2020-LLA-0255) Project stage: Acceptance Review ML20364A0172020-12-28028 December 2020 NRR E-mail Capture - Surry Power Station, Units 1 and 2 AST LAR - Acceptance Review (L-2020-LLA-0258) Project stage: Acceptance Review ML21084A2732021-03-24024 March 2021 License Amendment Request - Application of Leak-Before-Break Methodology to Reactor Coolant System Branch Piping - Response to Request for Additional Information and Clarification Project stage: Response to RAI ML21127A1362021-05-13013 May 2021 May 13, 2021 NRC Pre-Submittal Meeting - Surry Power Station New Fuel Storage and Spent Fuel Pool Criticality Analysis Proposed License Amendment Request Project stage: Meeting ML21133A4212021-05-13013 May 2021 Response to NRC Request for Additional Information Regarding Proposed License Amendment Request Update of LOCA Alternative Source Term Dose Analysis Project stage: Response to RAI ML21270A0232021-07-0707 July 2021 State of Virginia Notification of Pending Amendment Issuance Ref: Surry Power Station, Units 1 and 2 - Request to Revise Technical Specifications 2.1.A.1.b Project stage: Other ML21175A1852021-08-20020 August 2021 Issuance of Amendment Nos. 304 and 304 Leak-Before-Break for Pressurizer Surge, Residual Heat Removal, Safety Injection Accumulator, Reactor Coolant System Bypass and Safety Injection Lines Project stage: Approval ML21272A0622021-09-28028 September 2021 NRR E-mail Capture - (External_Sender) Surry Fuel Melt Safety Limit (SL) LAR Question Project stage: Other ML21277A0652021-09-30030 September 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer Project stage: Request ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR Project stage: Request ML21292A3022021-10-19019 October 2021 Response to Question on License Amendment Request to Revise Reactor Core Safety Limit Project stage: Request ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . Project stage: Request ML21188A1742021-10-26026 October 2021 Issuance of Amendment Nos. 305 and 305 Revised Reactor Core Safety Limit to Reflect Topical Report WCAP-177642-P-A, Revision 1 Project stage: Approval ML21307A4302021-11-0909 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action Surry Post LOCA Buffer Change Project stage: Acceptance Review ML21253A0632021-11-19019 November 2021 Issuance of Amendment Nos. 306 and 306 to Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis Project stage: Approval ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) Project stage: Acceptance Review ML21334A1692021-11-29029 November 2021 Proposed License Amendment Request Removal of Refueling Water Chemical Additional Tank and Replacement of Containment Buffer Supplemental Information Project stage: Supplement ML21340A1642021-12-0606 December 2021 Acceptance of Requested Licensing Action Amendment Project stage: Acceptance Review ML22004A2872022-01-14014 January 2022 Technical Specification Section 3.4.A.4 Change of Post Loss-of-Coolant Accident Chemical Buffer Audit Plan Project stage: Other ML22077A0542022-03-18018 March 2022 Change in Engineering Hours Estimate Surry Ph Buffer LAR Acceptance Project stage: Approval ML22089A0092022-04-13013 April 2022 Regulatory Audit Summary Related to the License Amendment Request to Change Loss-Of-Coolant Accident Chemical Buffer Project stage: Other ML22153A1352022-06-0202 June 2022 Proposed License Amendment Request (LAR) - Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Additional Information Project stage: Response to RAI ML22164A8532022-06-13013 June 2022 Proposed License Amendment Request Removal of Refueling Water Chemical Addition Tank and Replacement of Containment Sump Buffer - Response to Request for Confirmation Project stage: Request ML22164A9252022-06-13013 June 2022 Page Substitutions to ADAMS Accession Number ML21294A338 Project stage: Request ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD Project stage: Approval ML22193A2952022-08-26026 August 2022 Issuance of Amendment Nos. 308 and 308 License Amendment Request for Removal of the Refueling Water Chemical Addition Tank and Containment Sump, Ph Buffer Change and Safety Evaluation Project stage: Approval ML22250A6672022-10-12012 October 2022 Correction to Issuance of Amendment Nos. 304 (EPID L-2020-LLA-0255), 305 (EPID L-2020-LLA-0219) 306 (EPID L-2020-LLA-0258), 307 (EPID L-2021-LLA-0195) and 308 Project stage: Approval 2021-12-06
[Table View] |
Similar Documents at Surry |
|---|
|
Text
VIRGINIA ELECTRIC A.t'\\l"D POWER COMPANY RICHMOND, VIRGINIA 23261
October 19, 2021
U. S. Nuclear Regulatory Commission Serial No.: 21-362 Attention: Document Control Desk NRA/GDM: RO Washington, DC 20555-0001 Docket Nos.: 50-280 50-281 License Nos.: DPR-32 DPR-37
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 RESPONSE TO QUESTION ON LICENSE AMENDMENT REQUEST TO REVISE REACTOR CORE SAFETY LIMIT
By emails dated September 28, 2021 (ML21272A062) and October 13, 2021 (ML21286A727) a member of the Dominion Energy Services Nuclear Regulatory Affairs organization provided information related to the planned implementation of Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Subsequently, the NRG Project Manager for Surry Power Station requested that this information be submitted under 10 CFR 50.30(b ), "Oath or affirmation."
The purpose of this letter is to formally provide the pertinent information provided in the emails dated September 28, 2021 and October 13, 2021 in accordance with the requirements of 10 CFR 50.4 and 50.30(b) (i.e. under oath or affirmation). Specifically, the pertinent information is as follows:
An additional implementation plan item will be added associated with the Surry Power Station Units 1 and 2 License Amendment Request to revise the TS 2.1.A.1.b safety limit for fuel melt. Specifically, UFSAR section 3.4.1.1 will be revised as part of the implementation plan for the license amendments following their issuance to include the revised fuel melt safety limit and its technical basis. Furthermore, the UFSAR will be reviewed and additional UFSAR changes will be implemented, if required, to reflect the revised fuel melt safety limit.
Serial No.21-362 Docket Nos. 50-280/281 Page 2 of 3
Should you have any questions or require additional information, please contact Mr. Gary D. Miller at (804) 273-2771.
Mark D. Sartain Vice President - Nuclear Engineering and Fleet Support
Commitments contained in this letter: None
COMMONWEAL TH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Mr. Mark D. Sartain, who is Vice President - Nuclear Engineering and Fleet Support, of Virginia Electric and Power Company. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this / 1--tftday of Vc.-f ober, 2021.
My Commission Expires: tzfar i I (:J.,tf
RAIG Notary P Commonwealth Reg.# 75 Co..
- Serial No.21-362 Docket Nos. 50-280/281 Page 3 of 3
cc: U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257
State Health Commissioner Virginia Department of Health James Madison Building -7 th floor 1 09 Governor Street Suite 730 Richmond, VA 23219
Mr. L. John Klos NRG Project Manager-Surry U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738
Mr. G. Edward Miller NRG Senior Project Manager-North Anna U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 09 E-3 11555 Rockville Pike Rockville, MD 20852-2738
NRG Senior Resident Inspector Surry Power Station