Triennial Fire Protection Inspection Report 05000352/2022011 and 05000353/2022011
ML22181B069
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/30/2022
From: Glenn Dentel
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Dentel G
References
IR 2022011
Download: ML22181B069 (12)


Text

June 30, 2022

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 A ND 2 - TRIENNIAL FIRE PROTECTION INSPECTION REPORT 05000352/2022011 AND 05000353/2022011

Dear Mr. Rhoades:

On June 23, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Limerick Generating Station, Units 1 and 2 and discussed th e results of this inspection with Mr. Frank Sturniolo, Site Vice President and other members of your staff. The results of th is inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.

If you disagree with a finding not associat ed with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the b asis fo r your disagreement, to th e U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 -0001; with copies to the Regional Administrator, Region I; and the NRC Resident Inspector at Limerick Generating Station, Units 1 and 2. This letter, its enclosure, and your response (if any) will be m ade available for public inspection and copying at http://www.nrc.gov/reading-rm /a dam s.h tm l and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Docket Nos. 05000352 and 05000353 License Nos. NPF-39 and NPF-85

Enclosure:

As stated

Inspection Report

Docket Numbers: 05000352 and 05000353

License Numbers: NPF-39 and NPF -85

Report Numbers: 05000352/2022011 and 05000353/2022011

Enterprise Identifier: I-2022- 011-0013

Licensee: Constellation Energy Generation, LLC

Facility: Limerick Generating Station, Units 1 and 2

Location: Sanatoga, PA 19464

Inspection Dates: June 6, 2022 to June 23, 2022

Inspectors: C. Bickett, Senior Reactor Inspector E. Miller, Reactor Inspector A. Patel, Senior Reactor Inspector

Approved By: Glenn T. Dentel, Chief Engineering Branch 2 Division of Operating Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licens ees performance by conducting a triennial fire protection inspection at Limerick Generating Station,

Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Viola ti ons

Failure to Validate Time Critical Action per Operator Response Time Program Cornerstone Significance Cross-Cutting Report Aspect Sectio n Mitigating Green None (NPP) 71111.21N.

Systems FIN 05000352,05000353/2022011-01 05 Open/Closed The inspectors identified a Green finding because Constellation did not validate a 20 -m inute time critical action to manually initiate low pressure coolant in jection (LPCI) for a fire in Fire Area 68W in accordance with Section 4.2 of procedure OP -AA-102-106, Operator Tim e Response Program.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently ap proved IPs with their attached revision histories are located on the public websit e a t http://www.nrc.gov/reading-rm /doc-collections/insp-manual/inspec t io n-procedure/index.html. Samples were declared complete when the IP requirement s most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light -Water Reactor Inspection Program - Operations Phase.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post -Fire Safe Shutdown Review (IP Section 03.01) (4 Sam p les)

The inspectors verified that components and/or systems would function as required to support the credited functions stated for each sample. Additional inspection considerations were located in the fire hazards analysis (FHA) or safe shutdown analysis (SSA).

(1) Residual Heat Removal System
(2) Class 1E DC Power
(3) Halon Suppression System
(4) Fire Barriers

Fire Protection Program Administrative Controls (IP Section 03.02)===

The inspectors verified that the selected control or process was implemented in accordance with the licensees current licensing basis. The inspectors ensured that the licensees fire protection program contained adequate procedures to implement the selected administrative control and verified that the selected administrative control met the requirements of all committed industry standards.

(1) Combustible Control Program

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Sam p les)

The inspectors verified the following:

a.

Changes to the approved fire protection program did not constitute an adverse effect on the ability to safely shutdown.

b.

The adequacy of the design modification, if applicable.

c.

Assum ptions and perform ance capability stated in the SSA had not been degraded through changes or modifications.

d.

The fire protection program documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the fire protection program or design change.

e.

Post-fire safe shutdown operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) EC 625788, 201 Safeguard 0BX103 Transformer Replacement
(2) EC 632790, Combustible Free Zone/Transient Com bustible Free Zone Reduction

INSPECTION RESULTS

Failure to Validate Time Critical Action per Operator Res ponse Time Program Cornerstone Significance Cross-Cutting Report Section Aspect Mitigating Green None (NPP) 71111.21N.05 Systems FIN 05000352,05000353/2022011 - 01 Open/Closed The inspectors identified a Green finding because Constellation did not validate a 20- m inute tim e critical action to manually initiate low pressure coolant injection (LPCI) for a fire in Fire Area 68W in accordance with Section 4.2 of procedure OP-AA-102-106, Operator Tim e Response Program.

Description:

Constellation procedure OP-AA-102-106, Opera tor Tim e Response Program,

provides corporate governance regarding identification, control, validation, and documentation requirements for time critical actions (TCAs).

TCAs include manual operator actions required to support a credited strategy in the safety analysis.

This includes actions in the fire hazards and fire safe shutdown analyses.

This procedure states, in part, that each plant has actions that are to be accomplished in a specified time, and completion of these actions ensures the plant complies with the assumptions made during the analysis of plant events. Per Section 4.2.2, the master list of TCAs shall inclu de the available time in minutes, performance time in minutes, and the ratio of available time to performance time, which determines whether periodic time validation is required.

Available time is defined as the time interval from the cue to perform the manual action to the time the analysis credits completion of the manual action and still meet the requirement s of the plants design basis or other documented evaluations.

Additionally, Section 4.2.7 states that issues that need to be considered include the sequence of TCAs.

Procedure OP - LG-102-106, Operator Time Response Program at Limerick Station, provides the master list of TCAs at Limerick. Included in this list are TCAs 9, 10, and 11, which describe the actions credited to manually initiate LPCI, a mode of the residual heat removal system, in the event of a major fire in Fire Area 68W.

Specifically:

  • TCA 10 - operator positions residual heat removal valves 2F015B, 2F027B, and 2F048B from panel 20- C601X1 on 217 elevation

These TCAs are analogous to Steps 3.2.1, 3.3.1, and 3.3.2 in the associated fire safe shutdown guide, 2FSSG -3068W. Operators use 2FSSG -3068W in conjunction with other operating procedures to safely shutdown the plant following a fire in Fire Area 68W.

In this scenario, LPCI is the credited source for reactor vessel inventory control.

Per 2FSSG-3068W, Steps 3.3.1 and 3.3.2 (TCA 10 and TCA 11), which encompass the valve lineup, are performed by one operator in sequence, and Step 3.2.1 (TCA 9) is performed by another operator after the valve lineup is complete. Additionally, 2FSSG-3068W and the supporting fire safe shutdown calculation, LF -0016- 0068W, state that manual initiation of LPCI is a prompt action that may be required for safe shutdown and is required to be completed within 20 minutes.

To determine whether operators could manually initiate LPCI within 20 minutes, the inspectors reviewed the most recent time validations of TCAs 9, 10, and 11.

The inspectors noted that the station time-validated these TCAs independently of each other and assigned each individual TCA an available time of 20 m inutes. The inspectors also noted that Constellation exempted TCA 9 from the six-year periodic validation since t he ratio of avai lable time (20 minutes) to expected performance time (four minutes) was greater than three (i.e., low risk of failure).

Constellations last time validation of TCA 10, completed in October 2021, demonstrated that operators took an average of 11.75 minutes to complete the action, with the fastest being eight minutes and the slowest being 13 minutes.

The last validation of TCA 11, completed in October 2016, demonstrated that most of the operators took less than six minutes to complete the action, with the fastest being just over three minutes and the slowest being over nine m inutes. Constellation also noted in both time validations that ratio of the average performance time to available time (20 minutes) was less than 0.8, so no issue reports or margin improvement actions were required.

The inspectors determined that assigning an available time of 20 minutes to each individual action did not meet the OP -AA-102-106 definition of available time since all three actions are required to manually i nitiate LPCI within a total of 20 minutes for a fire in Fire Area 68W.

The inspectors also noted that Constellation did not holistically review individual TCAs completed in a certain sequence to meet a comprehensive objective, like manual initiation of LPC I, to ensure that the periodic validations demonstrated operators could meet the times assumed in station analyses.

Additionally, the inspectors determined that calculated margins for the TCAs needed to manually initiate LPCI were incorrect when using an available time of 20 minutes for each separate action.

Based on information available in the existing validations, the inspectors concluded it is likely that the time required to manually initiate LPCI per 2FSSG -

3068W would exceed a margin threshold and require an issue report and/or margin improvement actions.

Based on an inspector field walkdown completed with an operator on June 10, 2022, and consideration of the individual time validations discussed above, the inspectors concluded there was reasonable assurance that the operators could manually initiate LPCI within 20 minutes for a fire in Fire Area 68W.

Of note, portions of TCA 9 could be performed concurrently with TCA 10 and 11.

Corrective Actions: Constellation entered this issue into their corrective action program for further evaluation.

Corrective Action References: IR 04507318

Performance Assessment:

Performance Deficiency: The inspectors determined that Constellations failure to validate a 20- minute time critical action to manually i nitiate LPCI for a fire in Fire Area 68W in accordance with Section 4.2 of procedure OP -AA-102-106, Operator Time Response Program was a performance deficiency that was reasonably within Constellations ability to foresee and correct. Constellation did n ot ensure that the three TCAs that were credited to manually initiate LPCI could all be performed together within 20 minutes to satisfy the assumptions in the associated fire safe shutdown guide and calculation.

Screening: The inspectors determined the p erform ance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Because Constellations time validation structure did not account for the sequence of actions required to manually initiate LPCI, and the individual TCAs were each assigned an available time of 20 minutes, the station could unknowingly exceed the overal l 20-minute requirement documented in 2FSSG -3068W and fire safe shutdown calculation LF -0016-0068W. Additionally, the inspectors noted that there were other examples of TCAs in OP -LG-102-106 that were sequenced together to accomplish an overall objective b ut were not validated as such (e.g., TCAs 2 and 3 for the reactor core isolation cooling system for a fire in Fire Area 7).

Significance: The inspectors assessed the significance of the finding using Appendix F, Fire Protection and Post - Fire Safe Shutdown SDP.

Appendix F was applicable in this case because the finding was associated with post -fire safe shutdown.

This issue screened as Green in Step 1.4.7-C because the fire finding did not adversely affect the ability to reach and maintain hot shutdown /hot standby using the credited safe shutdown path.

Based on field walkdowns and consideration of individual time validations, the inspectors determined there was reasonable assurance that the operators could manually initiate the LPCI system in 20 m inutes for a fire in Fire Area 68W.

Cross-Cutting Aspect: Not Present Performance. No cross -cutting aspect was assigne d to this finding because the inspectors determined the finding did not reflect present licensee performance.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 23, 2022, the inspector s presented the triennial fire protection inspection results to Mr. Frank Sturniolo, Site Vice President and other mem bers of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21N.05 Calculations LE-130 Class 1E 125/250V DC System Analysis 1

LEAM-0001 HPCI and RCIC Loads During FSSD 0A

LF-0016-007 Fire Area 007 Fire Safe Shutdown Analysis

LF-0016-068W Fire Area 068W Fire Safe Shutdown Analysis 1

LF-0016-068W Fire Area 068W Fire Safe Shutdown Analysis 1A

LF-0016-068W Fire Area 068W Fire Safe Shutdown Analysis 1B

LG-PRA-021.11 Limerick Generating Station Fire Probabilistic Risk 1

Assessment Summary and Quantification Notebook

Corrective Action 04156586

Docum ents 04233701

278009

284972

04312374

04337862

04400188

Corrective Action 04504421

Docum ents 04504447

Resulting from 04504646

Inspection 04504667

04504704

04504767

04504891

04505317

04505478

04505495

04506733

04506974

04506981

04507012

04507054

04507056

Inspection Type Designation Description or Title Revision or

Procedure Date

04507318

Engineering 628970 201 Safeguard Transformer Fire System De s ign 0

Changes 632790 Combustible Fire Zone Evaluation 1

Engineering IR 01382361-41 Performance Based Evaluation of Selected Fire Protection 0

Evaluations Testing to Extend the Testing Interval

LEAF-0088 Limerick Generating Station Combustible Free Zone 1

Evaluation

Fire Plans F-R-500 Limerick Generating Station Pre-Fire Plan 20

F-R-574 Limerick Generating Station Pre-Fire Plan 17

Miscellaneous 1P-13.5 Unit 1 Halon Pre-O p Te st 04/10/1989

2P-13.5 Halon Pre-Op Test 04/10/1989

LGSOPS2008 LGS Operations Initial Training - Fire Safe Shutdown 4

Guides (FSSG)

NE-294 Post-Fire Safe Shutdown Program Requirements 5

NFPA 12A-1977 Standard for Halon 1301

OP-AA-102-106 TCA 11 Operator Response Time Validation Sheet 10/11/2016

Attachm ent 1

OP-AA-102-106 TCA 10 Operator Response Time Validation Sheet 10/14/2021

Attachm ent 1

TCP 754 Fire Zone Permit 754 02/23/2022

Procedures 1/2 FSSG-3007 Fire Area 007 Fire Guide 9

2FSSG-3068W Fire Area 068W Fire Guide 15

CC-AA-211 Fire Protection Program 9

MA-AA-716-026 Station Housekeeping/Material Condition Program 20

MA-AA-716-026-Additional Guidance for In-Plant/Yard Storage and 23

1001 Housekeeping at Limerick

OP-AA-102-106 Operator Time Response Program 8

OP-AA-201-009 Control of Transient Combustible Material 27

OP-LG-102-106 Operator Time Response Program at Limerick Station 13

SE-1 Remote Shutdown 76

ST-4-022-930-0 Unit Common TRM Fire Door Inspection 3

Work Orders 04280402

04643397

Inspection Type Designation Description or Title Revision or

Procedure Date

04736727

05044327

9