Form 2.1-1 Examination Preparation Checklist
Facility Ginna OPERATING Exam START Date: 10/17/2022 WRITTEN Exam Developed By: Facility OPERATING Exam Developed By: Facility WRITTEN Exam Date: 10/25/2022 OPERATING Exam COMPLT Date: 10/21/2022 Exam Date Date Target Date Task Description Complete
-240 2/19/2022 12/6/20211. Examination administration date confirmed (A.1-5). For NRC-prepared examinations, arrangements are made for the facility licensee to submit reference materials (B.4, C.4.g and F).
-210 3/21/2022 12/6/20212. NRC examiners and facility licensee contact assigned ( B.1 and C.1-3).
-210 3/21/2022 12/6/20213. Facility licensee contact briefed on examination security and other requirements (D.4). As applicable, the facility licensee contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facility licensees prescreening process (ES-4.1 A.1.a and ES-4.1 B.2).
-210 3/21/2022 N/A4. Reference material due for NRC-prepared examinations (F).
-210 3/21/2022 1/19/20225. Examination kick-off call held (C.4). The NRC sends the corporate notification letter (A.5).
-195 4/5/2022 12/6/20216. Written examination outline developed by the NRC and sent to the facility licensee contact (must be on the examination security agreement) (B.2, ES-4.1 A.1.b and ES-4.1
-150 5/20/2022 5/19/20227. Operating test outlines and checklists due: Forms 1.3-1, 2.3-1, 3.2-1, 3.2-2, 3.3-1, and 3.4-1, as applicable (B.6). Facility licensee provides a draft operating test administration schedule to the NRC (B.18).
-136 6/3/2022 6/2/20228. Operating test outlines reviewed by the NRC and feedback provided to the facility licensee (ES-2.3).
-100 7/9/2022 N/A9. NRC-prepared examinations approved by the NRC supervisor and forwarded for facility licensee review (ES-2.3).
-75 8/3/2022 7/21/202210. Proposed examinations (written, JPMs, and scenarios, as applicable) and outline forms ; quality checklists and supporting documentation (including Forms 2.3-2 and 2.3-4 and any Form 2.3-1, 1.3-1, and 3.4-1 updates); and reference materials due.
-60 8/18/2022 8/18/202211. Preliminary waiver/excusal requests due (ES-2.2 E.1).
-50 8/28/2022 8/12/202212. Written examination and operating test reviews completed (ES-2.3). The NRC supervisors authorization to proceed with the facility review granted (ES-2.3 D).
-50 8/28/2022 8/23/202213. Examination review results discussed between the NRC and the facility licensee (B.14).
Page 1 of 2 Form 2.1-1 Examination Preparation Checklist
Facility Ginna OPERATING Exam START Date: 10/17/2022 WRITTEN Exam Developed By: Facility OPERATING Exam Developed By: Facility WRITTEN Exam Date: 10/25/2022 OPERATING Exam COMPLT Date: 10/21/2022 Exam Date Date Target Date Task Description Complete
-35 9/12/2022 8/29/202214. Examination preparatory week conducted by the NRC and the facility licensee (I).
-30 9/17/2022 9/16/202215. Preliminary license applications, including an y waiver/excusal requests, due (ES-2-2 C.1).
-14 10/3/2022 10/3/202216. Final license applications, including any waiver/excusal requests, due and Form 2.2-1 prepared (ES-2.2 C and E).
-7 10/10/2022 9/29/202217. Written examinations and operating tests approved by th e NRC supervisor (C.9)
-7 10/10/2022 9/28/202218. Facility licensee management feedback on the examination requested by the NRC supervisor (C.10).
-7 10/10/2022 10/3/202219. Final applications reviewed; 10% of applications audited to confirm qualifications/eligibility (ES-2.2 G); and examination approval letter (Letter 2.3-1) and waiver/excusal letters sent.
-7 10/10/2022 10/7/202220. Written examination administration guidelines reviewed with the facility licensee (D.14).
-7 10/10/2022 10/7/202221. Approved scenarios and job performance measures distributed to NRC examiners (D.12).
- Target dates are based on facility licensee-prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted in coordination with the facility licensee.
Page 2 of 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility: Ginna Date of Exam: 10/202 2 Operating Test No.: N22-1 A E Scenarios P V N22-1 -1 N22-1 -2 N22-1 -3 T M P E (Day 1) (Day 2) (Day 3) O I L N T N I T CREW CREW CREW CREW A I C POSITION POSITION POSITION POSITION L M A T U N Y M(*)
T P S A B S A B S A B S A B R I U E R T O R T O R T O R T O O C P O C P O C P O C P 0 1 1 0 RX 1 1 NOR 2 1 1 1 2, 3, 2, 3, 8 4 4 2 SROU-1 I/C 4, 5, 5 7
6 6 2 2 2 1 MAJ MC 0 1 1 0 TS 2, 3 2 0 2 2
0 1 1 0 RX NOR 1 1 2 1 1 1
2, 3, 2, 3, 11 4 4 2 SROU-2 I/C 4, 5, 4, 5, 7 7, 8 6 6 2 2 2 1 MAJ MC 0 1 1 0 TS 2, 3 2, 3 4 0 2 2
0 1 1 0 RX 1 NOR 1 1 1 1 2, 3, 5 4 4 2 SROU-3 I/C 4, 5, 7
6 1 2 2 1 MAJ MC 0 1 1 0 TS 2, 3 2 0 2 2
4 1 1 1 0 RX NOR 1 1 1 1 1
2, 3, 2, 3, 2, 3, 12 4 4 2 SROI-1 I/C 7 4, 5, 4 7, 8 6 6 6 3 2 2 1 MAJ 2, 3, 2 MC 7 4 1 1 0 TS 2, 3 2 0 2 2
5 1 1 1 0 RX NOR 0 1 1 1 3, 4, 1, 2, 10 4 4 2 SROI-2 I/C 7, 8 3, 4, 5, 7 6 6 2 2 2 1 MAJ 3, 4, MC 7 3 1 1 0 TS 1, 4 2 0 2 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Facility: Ginna Date of Exam: 10/2022 Operating Test No.: N22-1 A E Scenarios P V N22-1 -1 N22-1 -2 N22-1 -3 T M P E (Day 1) (Day 2) (Day 3) O I L N T N I T CREW CREW CREW CREW A I C POSITION POSITION POSITION POSITION L M A T U N Y M(*)
T P S A B S A B S A B S A B R I U E R T O R T O R T O R T O O C P O C P O C P O C P 4 1 1 1 0 RX NOR 1 1 1 1 1
2, 3, 2, 3, 9 4 4 2 SROI-3 I/C 7 4, 5, 7, 8 6 6 2 2 2 1 MAJ MC 2, 3, 3 1 1 0 7
TS 2, 3 2 0 2 2
4 1 1 1 0 RX 1 NOR 1 1 1 1 2, 3, 2, 3, 6 4 4 2 RO-1 I/C 7 5 6 6 2 2 2 1 MAJ 2, 3, MC 7 3 1 1 0 TS 0 0 2 2
5 1 1 1 0 RX 1 NOR 1 1 1 1 4, 5 3, 4, 6 4 4 2 RO-2 I/C 7, 8
6 6 2 2 2 1 MAJ 5 3, 4, MC 7 4 1 1 0 TS 0 0 2 2
5 1 1 1 0 RX 1 NOR 1 1 1 1 4, 5 3, 4, 6 4 4 2 RO-3 I/C 7, 8
6 6 2 2 2 1 MAJ 5 3, 4, MC 7 4 1 1 0 TS 0 0 2 2
3 1 1 1 0 RX NOR 1 1 2 1 1 1
4, 5 2, 3, 1, 4, 9 4 4 2 RO-4 I/C 5 5, 7
6 6 6 3 2 2 1 MAJ MC 5 1 1 1 0
TS 0 0 2 2
Form 3.4-1 Events and Evolutions Checklist (Rev_091922)
Form 3.4-1 Instructions for the Events and Evolutions Checklist
- 1. Mark the applicant license level for each simulator operating test number.
- 2. For the set of scenario columns, fill in the associated event number from Form 3.3-1, Scenario Outline, to show the specific event types being used for the applicant while in the assigned crew position for that scenario.
- Minimums are subject to the instructions in Section C.2, License Level Criteria.
KEY: RX = Reactivity Manipulation; NOR = Normal Evolution; I/C = Instrument/Component Failure; MAJ = Major Transient; Man. Ctrl = Manual Control of Automatic Function; TS = Technical Specification Evaluation; RO = Reactor Operator; SRO-I or I = Instant Senior Reactor Operator; SRO-U or U = Upgrade Senior Reactor Operator; SRO = Senior Reactor Operator; ATC = At the Controls; and BOP = Balance of Plan