RBG-48260, Notification of Readiness for Supplemental Inspection
| ML23285A326 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/12/2023 |
| From: | Crawford R Entergy Operations |
| To: | Office of Nuclear Reactor Regulation, NRC Region 4, Document Control Desk |
| References | |
| RBG-48260 | |
| Download: ML23285A326 (1) | |
Text
entergy Randy Crawford Regulatory Assurance Manager River Bend Station 225-381-4177
RBG-48260
October 12, 2023
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
Subject:
Notification of Readiness for Supplemental Inspection
River Bend Station - Unit 1 NRC Docket Nos. 50-458 Renewed Facility Operating License No. NPF-47
Reference:
NRC letter to Entergy, EA-23-071: "River Bend Station - Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092," (ADAMS Accession No ML23201A132) dated August 15, 2023
By letterdated August 15, 2023, the Nuclear Regulatory Commission (NRC) determined the performance at River Bend Station (RBS) to be within the Regulatory Response Column of the NRC's Action Matrix.
In the referenced letter, the NRC announced its intent to conduct a supplemental inspection in accordance with Inspection Procedure 95001 following a notification of readiness from RBS.
This letter serves as the notification of readiness for the NRC to perform the supplemental inspection at RBS.
This document contains no commitments. Should you have any questions, please contact Mr.
Randy Crawford, Regulatory Assurance Manager, at 225-381-4177.
Respectfully,
Randy Crawford RC/twf
cc: NRC Region IV Regional Administrator - Region IV NRC Senior Resident Inspector - River Bend Station
- --*-~ *-~- -~--* *-*--' --*-*--*~--,, "**~--,.--****N*
Entergy Operations, Inc., 5485 U.S. Highway 61 N. St. Francisville, LA 70775