ML23290A161

From kanterella
Revision as of 20:32, 24 October 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Portland General Electric Company - Biennial Report of Changes to NRC-Approved Quality Assurance Program
ML23290A161
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 09/25/2023
From: Felton B
Portland General Electric Co
To:
Office of Nuclear Material Safety and Safeguards
References
VPN-009-2023
Download: ML23290A161 (1)


Text

Portland General Electric Company Trojan ISFSI 71760 Columbia River Hwy Rainier, Oregon 97048 September 25, 2023 VPN-009-2023 Trojan ISFSI License SNM-2509 Docket 72-017 ATTN: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 Biennial Report of Changes to NRC-Approved Quality Assurance Program In accordance with 10 CFR 71.106(b), this letter transmits the description(s) of any changes to a previously approved quality assurance program without prior NRC approval if the change does not reduce the commitments in the quality assurance program previously approved by the NRC. Please note, Revision 30 to PG E's *Quality Assurance Program Manual (PGE-8010) was approved by the NRC by letter dated January 7, 2022.

No changes were made to Portland General Electric (PGE) Trojan ISFSl's NRC-approved Quality Assurance Program Manual (PGE-8010, Rev. 29 or 30) in the 24 months since PGE Trojan's last biennial report of changes to our NRC-approved Quality Assurance Program via letter, VPN-005-2021, dated September 28, 2021.

Sincerely, Benjamin Felton (Sep 25, 2023 15:10 PDT)

Benjamin F. Felton Executive Vice President and Chief Operating Officer c: Director, NRC Region IV, DNMS Todd Cornett, Assistant Director, Energy Siting, ODOE

_J