Low Pressure Coolant Injection
From kanterella
Revision as of 09:38, 5 January 2023 by
StriderTol
(
talk
|
contribs
)
(Created page with "{{system-Nav}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation
Jump to search
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Electrohydraulic Control
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
LG-25-132, License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing
Limerick
9 October 2025
License Amendment and Alternative Request Related to One-Time Exception of Primary Containment Isolation Valve Testing
ML25268A175
Hatch
26 September 2025
Authorization of Alternative Request RR-V-4 - Sixth Inservice Testing Interval
ML25227A108
Electric Power Research Institute
22 August 2025
Regulatory Audit Report in Support of Review of EPRI Report 3002028939, Risk-informed High Energy Line Break Evaluation Requirements EPID L-2024-NTR-0006)
LR-N25-0073, Pressure and Temperature Limits Report (PTLR) Revision 2
Hope Creek
15 August 2025
Pressure and Temperature Limits Report (PTLR) Revision 2
IR 05000237/2025002
Dresden
12 August 2025
Integrated Inspection Report 05000237/2025002 and 05000249/2025002
IR 05000352/2025002
Limerick
24 July 2025
Integrated Inspection Report 05000352/2025002 and 05000353/2025002
L-MT-25-025, Notification of Changes to the Emergency Response Data System (ERDS)
Monticello
1 July 2025
Notification of Changes to the Emergency Response Data System (ERDS)
LR-N25-0058, License Amendment Request (LAR) - Hope Creek Technical Specification Coversion to NUREG-1433, Revision 5, Supplement 4
Hope Creek
24 June 2025
License Amendment Request (LAR) - Hope Creek Technical Specification Coversion to NUREG-1433, Revision 5, Supplement 4
IR 05000333/2025040
FitzPatrick
17 June 2025
Design Basis Assurance Inspection (Programs) - Age-Related Degradation Inspection Report 05000333/2025040
ML25126A252
Dresden
10 June 2025
Aging Management Audit Report - Dresden SLR
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties