BW200057, Bwd 2020 Ile Post-Exam Package Cover
| ML22173A231 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 06/27/2020 |
| From: | Keenan J Exelon Generation Co |
| To: | Division of Reactor Safety III |
| Baker R | |
| Shared Package | |
| ML19121A238 | List: |
| References | |
| BW200057 | |
| Download: ML22173A231 (2) | |
Text
Exelon Generation Company, LLC Exelon Generation Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-961 9 www.exelo ncorp.com June 23, 2020 10 CFR Part 55, Subpart E BW200 057 U. S. Nuclear Regulatory Commission Regional Administrator, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Braidwo od Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457
Subject:
NRC Initial License Post Examination Activities In accordance with 10 CFR 55 Subpart E, "Written Examinations and Operating Tests," and NUREG-1021, "Operator Licensing and Examination Standards for Power Reactors," Revision 11 , Section ES-501 , "Initial Post Examination Activities," the facility licensee shall forward examination documentation to the NRC chief examiner as soon as possible
, but not more than 20 calenda r days, after all parts of the licensing examination have been administered. Neither the facility nor candidates are challenging any written exam questions.
The following examination documentation required by NUREG-1021 ,
Section ES-501 will be separately delivered to Region Ill.
- Graded written examination with each applicant's answer sheet
- All questions asked by applicants and the answers given to the applican ts during the written examination
- Written examination seating chart Completed Form ES-403-1 , 'Written Examination Grading Quality Checkli st" Results of written examination performance analysis and substantive analysis.
Form ES-201-3, "Examination Security Agreement" R~e.ob <t,[.2, /20
~q)
U.S. Nuclear Regulato ry Commis sion June 23 , 2020 Page2 Should you have any questions concerning this letter, please contact Mr. Kevin Lueshe n, Regulatory Assurance Manager, at (815) 417-2800. For questions concerning administration of the examination, please contact Mr. Dane Brunswick at (815) 458-7867.
Respectfully, J__ S('J !
~n Keenan Site Vice Presiden t Braidwood Station cc: Chief, NRC Operato r Licensin g Branch N RC Senior Residen t Inspect or-Braid wood Station