BW200057, Bwd 2020 Ile Post-Exam Package Cover

From kanterella
Revision as of 09:06, 18 July 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Bwd 2020 Ile Post-Exam Package Cover
ML22173A231
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/27/2020
From: Keenan J
Exelon Generation Co
To:
Division of Reactor Safety III
Baker R
Shared Package
ML19121A238 List:
References
BW200057
Download: ML22173A231 (2)


Text

Exelon Generation Company, LLC Exelon Generation Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-961 9 www.exelo ncorp.com June 23, 2020 10 CFR Part 55, Subpart E BW200 057 U. S. Nuclear Regulatory Commission Regional Administrator, Region Ill 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Braidwo od Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

NRC Initial License Post Examination Activities In accordance with 10 CFR 55 Subpart E, "Written Examinations and Operating Tests," and NUREG-1021, "Operator Licensing and Examination Standards for Power Reactors," Revision 11 , Section ES-501 , "Initial Post Examination Activities," the facility licensee shall forward examination documentation to the NRC chief examiner as soon as possible

, but not more than 20 calenda r days, after all parts of the licensing examination have been administered. Neither the facility nor candidates are challenging any written exam questions.

The following examination documentation required by NUREG-1021 ,

Section ES-501 will be separately delivered to Region Ill.

  • Graded written examination with each applicant's answer sheet
  • All questions asked by applicants and the answers given to the applican ts during the written examination
  • Written examination seating chart Completed Form ES-403-1 , 'Written Examination Grading Quality Checkli st" Results of written examination performance analysis and substantive analysis.

Form ES-201-3, "Examination Security Agreement" R~e.ob <t,[.2, /20

~q)

U.S. Nuclear Regulato ry Commis sion June 23 , 2020 Page2 Should you have any questions concerning this letter, please contact Mr. Kevin Lueshe n, Regulatory Assurance Manager, at (815) 417-2800. For questions concerning administration of the examination, please contact Mr. Dane Brunswick at (815) 458-7867.

Respectfully, J__ S('J !

~n Keenan Site Vice Presiden t Braidwood Station cc: Chief, NRC Operato r Licensin g Branch N RC Senior Residen t Inspect or-Braid wood Station