Application for Subsequent Renewed Operating Licenses. Part 6 of 8
ML21158A199
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 06/07/2021
From:
Duke Energy Carolinas
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21158A193 List:
References
RA-21-0132
Download: ML21158A199 (64)


Text

Oconee Nuclear Station Units 1, 2, and 3 Application for Subsequent License Renewal Appendix E - Applicants Environmental Report Attachment D: Cultural Resource Consultation Letters

J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station Duke Energy ON0I VP / 7800 Rochester Hwy Seneca, SC 29672 o 864.873.3478

' 864.873.5791 Ed Burchfield @duke-energy.com BY U.S. MAIL RETURN RECEIPT REQUESTED November 11, 2019 Mary Louise Worthy, Chief Piedmont American Indian Association Lower Eastern Cherokee Nation of SC 3688 Warrior Creek Church Rd Gray Court, SC 29645 RE: Duke Energy - Oconee Nuclear Station Units 1, 2 and 3 Subsequent License Renewal

Dear Chief Worthy:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2 and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. ONS Licensing Dates ONS License Expiration Extended License Expiration Unit Date Date Unit 1 February 6, 2033 February 6, 2053 Unit 2 October 6, 2033 October 6, 2053 Unit 3 July 19, 2034 Julv 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) that assesses the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources including tribal cultural resources on or near the ONS site.

While environmental impacts of an existing facility were assessed during original licensing, and license renewal is unlikely to have significant additional or different impacts, the NRC may request a consultation with the South Carolina State Historic Preservation Office (SHPO) and the Piedmont American Indian Association (PAIA) Lower Eastern Cherokee Nation of SC regarding license renewal. Should the NRC consultation take place, the time frame for its conduct is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021 .

To facilitate our assessment and a smooth consultation by the NRC, we are contacting you early in the application process seeking input from you regarding the effects that license renewal activities may have on historic and cultural resources within the station's surrounding area and any questions or additional information necessary for the consultation process.

Figures depicting the station site and the vicinity within a 6-mile radius of the station are enclosed, and a brief discussion of the station and its operations during the extended period of operation is provided below.

ONS is located approximately eight miles northeast of Seneca, South Carolina (SC) on the southern shore of Lake Keowee. The ONS site is situated on 510 acres in eastern Oconee County, SC. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the surrounding area of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

Should you or your staff have any questions or comments, please contact Lisa Leatherman at (828) 369-4534 / Lisa.Leatherman@duke-energy.com.

Sincerely,

)Cl~/

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 2of41 Page

Figure 1. ONS Site

- t -~~.i *

. ~..!.

.-- 1/.*'

. K..

.-;(.&l I l l

- ' \

t I s*

.. .t,  !

\

l

.; } ~ .

-~- i! i,.

il)  : }r~

~J :j.( -' .  ! ~

.. . t:::!0;:...1 ~ *

' ~ -,-:--, ,;. if( -,).

\ <.1 r:,,.1-

'\ -.

' \ _,,.........,

-. A*.: . ,,

. :- ~*.~:Old .Vi~kt>ft.Q

, n . * * ~-- - * - _;.-

  • Is~ ~*"-/ ., '

. . ,1**~\

. 1

. \.

't-~

1'

      • -";,;,.,,*~ (' - '*

r..:;.-t.*, / '\ '"' ... *.*. ./. . . if

.( 1 ,' .I I ~.}

\,

\

-').),V", .* , }

'* . "'* j ' . *; - . ** ,~

~ -l , *- * , 1.

  • ?'.,*i~ *i. \. ~ \ ; . .j
  • f', \ } , ' . I
  • ,. '~~. J

,._. c 1 ii[- * *

  • J.
  • - o.",, I t I- .'. '*' \

~; \ ')

1 *., "

, .,{ *,.
  • Y I

Legend c::JoNSSite


c::::==::::,M1les 0 0.25 0.5 3of41 Page

Figure 2. ONS 6-mile Vicinity CentJill Legend G Airport Surface VVater a Heliport c:::::J ONS Site U.S. Route i_-_i6-Mile Radius

_.,._ State Highway Place Local Road t::] County

-+~ - Railroad 4 of 41 Page

/_~ DUKE

~ ENERGY~

J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station Duke Energy ON01 VP / 7800 Rochester Hwy Seneca. SC 29672

,, 864.873.3478

' 864.873.5791 Ed Burchfield @duke-energy.com BY U.S. MAIL RETURN RECEIPT REQUESTED November 11, 2019 Mary Louise Worthy, Chief Piedmont American Indian Association Lower Eastern Cherokee Nation of SC 3688 Warrior Creek Church Rd Gray Court, SC 29645 RE: Duke Energy- Oconee Nuclear Station Units 1, 2 and 3 Subsequent License Renewal

Dear Chief Worthy:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2 and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. ONS Licensing Dates ONS License Expiration Extended License Expiration Unit Date Date Unit 1 February 6, 2033 February 6, 2053 Unit 2 October 6, 2033 October 6, 2053 Unit 3 Julv 19, 2034 Julv 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) that assesses the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources including tribal cultural resources on or near the ONS site.

While environmental impacts of an existing facility were assessed during original licensing, and license renewal is unlikely to have significant additional or different impacts, the NRC may request a consultation with the South Carolina State Historic Preservation Office (SHPO) and the Piedmont American Indian Association (PAIA) Lower Eastern Cherokee Nation of SC regarding license renewal. Should the NRC consultation take place, the time frame for its conduct is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021.

To facilitate our assessment and a smooth consultation by the NRC, we are contacting you early in the application process seeking input from you regarding the effects that license renewal activities may have on historic and cultural resources within the station's surrounding area and any questions or additional information necessary for the consultation process.

Figures depicting the station site and the vicinity within a 6-mile radius of the station are enclosed, and a brief discussion of the station and its operations during the extended period of operation is provided below.

ONS is located approximately eight miles northeast of Seneca, South Carolina (SC) on the southern shore of Lake Keowee. The ONS site is situated on 51 O acres in eastern Oconee County, SC. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the surrounding area of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

Should you or your staff have any questions or comments, please contact Lisa Leatherman at (828) 369-4534 / Lisa.Leatherman@duke-energy.com.

Sincerely,

)O~/

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 2 of 4 I Page

Figure 1. ONS S'te I

Legend CJoNSSite 0 0.25 3of41 Page

Figure 2. ONS 6-mile Vicinity I,.

Central Clemson Legend D Airport Surface \Nater a Heliport c:::J ONS Site U.S . Route i_-_i 6-Mile Radius

_.,._ State Highway Place Local Road r::J County ---===:::1M1 0 2 htta

-.- , *- Railroad 4 of 41 Page

(., DUKE

~ ENERGY.

J. Ed Burchfield, Jr.

Vice Presiden/

Oconee Nudear Sia/ion Duke Energy ONOI VP / 7800 Rochester Hwy Seneca, SC 29672

, 864.873.3478 I 864.873.5791 Ed.Burchfield @duke-energy.com BY U.S. MAIL RETURN RECEIPT REQUESTED November 11 , 2019 James Floyd, Principal Chief Muscogee (Creek) Nation PO Box 580 Okmulgee, OK 74447 RE: Duke Energy - Oconee Nuclear Station Units 1, 2 and 3 Subsequent License Renewal

Dear Chief Floyd:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2 and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. ONS Licensing Dates ONS License Expiration Extended License Expiration Unit Date Date Unit 1 February 6, 2033 February 6, 2053 Unit2 October 6, 2033 October 6, 2053 Unit 3 Julv 19, 2034 Julv 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) that assesses the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources including tribal cultural resources on or near the ONS site.

While environmental impacts of an existing facility were assessed during original licensing, and license renewal is unlikely to have significant additional or different impacts, the NRC may request a consultation with the South Carolina State Historic Preservation Office (SHPO) and the Muscogee (Creek) Nation regarding license renewal. Should the NRC consultation take place, the time frame for its conduct is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021.

To facilitate our assessment and a smooth consultation by the NRC, we are contacting you early in the application process seeking input from you regarding the effects that license renewal activities may have on historic and cultural resources within the station's surrounding area and any questions or additional information necessary for the consultation process.

Figures depicting the station site and the vicinity within a 6-mile radius of the station are enclosed, and a brief discussion of the station and its operations during the extended period of operation is provided below.

ONS is located approximately eight miles northeast of Seneca, South Carolina (SC) on the southern shore of Lake Keowee. The ONS site is situated on 510 acres in eastern Oconee County, SC. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the surrounding area of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

Should you or your staff have any questions or comments, please contact Lisa Leatherman at (828) 369-4534 / Lisa.Leatherman@duke-energy.com.

Sincerely,

} C,( IJ.J/JJ/.

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 2 of 41 Page

Figure 1. ONS Site Ii V

I I (

'1 .

J1--~

i,

.~

!l~ \.._ )

Jl' '

  • .~,~. '\ l t;J))~ . i., , ')

._., ~.~~;'. \ ' .

  • .~ -
  • 'I);,

I \

1

,:' :~;:"; ,., , I' ~f'i'""' ,_; ~ ~f- f,-;

, . ...,.. _.-.._ * ' ,._I/II .

-_ . *{\ c' *- .r'.. .*

  • Y, r,r )

'

  • I ' ' /
1. .'in **, \. _..., / ' **
"\"* . ' -- -_~ 1*' ,* . ', i '/, (' '

t \. :._/.) *.

(,'

l r / '* l ,_:' ~\

  • \. ' , ~ - ,,_;J ' , .

- ~' ' I (, *

.. .-,J ,, ., * '

Legend c::::J ONS Site Mies 0 0.25 0.5 3 of 41 Page

Figure 2. ONS 6-mile Vicinity

~~

l Central Clemson Legend D Airport Surface Water a Heliport U.S. Route .. --

OoNSS ite

  • - Mile Radius

~ State Highway Place Local Road CJ County - - - c : :=:::::J Mles 0 2

- * ** Railroad 4 of 41 Page

<i_~ DUKE J. Ed Burchfield, Jr.

~ ENERGY.. Vice President Oconee Nuclear Sta/ion Duke Energy ON01 VP / 7800 Rochester Hwy Seneca, SC 29672

,, 864.873.3478 I 864.673.5791 Ed.Burchfield @duke-energy.com BY U.S. MAIL RETURN RECEIPT REQUESTED November 11, 2019 Bill Harris, Chief Catawba Indian Nation 996 Avenue of the Nations Rock Hill, SC 29730 RE: Duke Energy - Oconee Nuclear Station Units 1, 2 and 3 Subsequent License Renewal

Dear Chief Harris:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2 and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. ONS Licensing Dates ONS License Expiration Extended License Expiration Unit Date Date Unit 1 Februarv 6, 2033 Februarv 6, 2053 Unit2 October 6, 2033 October 6, 2053 Unit 3 July 19, 2034 July 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) that assesses the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources including tribal cultural resources on or near the ONS site.

While environmental impacts of an existing facility were assessed during original licensing, and license renewal is unlikely to have significant additional or different impacts, the NRC may request a consultation with the South Carolina State Historic Preservation Office (SHPO) and the Catawba Indian Nation regarding license renewal. Should the NRC consultation take place, the time frame for its conduct is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021.

To facilitate our assessment and a smooth consultation by the NRC, we are contacting you early in the application process seeking input from you regarding the effects that license renewal activities may have on historic and cultural resources within the station's surrounding area and any questions or additional information necessary for the consultation process.

Figures depicting the station site and the vicinity within a 6-mile radius of the station are enclosed, and a brief discussion of the station and its operations during the extended period of operation is provided below.

ONS is located approximately eight miles northeast of Seneca, South Carolina (SC) on the southern shore of Lake Keowee. The ONS site is situated on 510 acres in eastern Oconee County, SC. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the surrounding area of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

Should you or your staff have any questions or comments, please contact John Crutchfield at (980) 373-2288 / John.Crutchfield@duke-energy.com.

Sincerely,

~ F:J f1-//!JJII J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 2of41 Page

Figure 1. ONS Site

-~'

L.'.

~

  • _,.. 1* 1 f t

! ,. ~, ,i' k~ -.'..,

../ *-

,,') .

t *. _, , * ' .~

/./ .-- / ' I . :~ ,., ,

,id .!3i,cltR.,,_.. -

'. ' . *"' -' )

\: ~ -~ ' \

)§2:f I;,~ ---~)-1/ i

~

I

~21 4 ., I(

. c:: *~

1 ..

-u_*F.m. ' .-,.., ,)- - _j t

.r I

'*. 1

,if~

'd

". *, 1

., *, ..( ...

~ *, ~ .~

,. . - \ . \

Legend CJoNs Site

~0---~0~25:====--' Miles 05 3of4j Page

Figure 2. ONS 6-mile Vicinity Central Clemso'n i.

Legend a Airport Surface Water D Heliport oNSSite U.S. Roule i_-_i 6-Mde Radius

. _ State Highway t Place Local Road D County

- - - C : : = = : l M IM 0 2

- Railn>ad 4of41 Page

J_~ DUKE J. Ed Burchfield, Jr.

~ ENERGY. Vice President Oconee Nuclear Station Duke Energy ON0IVP / 7800 Rochester Hwy Seneca, SC 29672 r 864.873.3478 t 864.873.5791 Ed.Burchfield @duke-energy.com BYU.S. MAIL RETURN RECEIPT REQUESTED November 11, 2019 Elizabeth Johnson South Carolina Department of Archives and History 8301 Parklane Road Columbia, SC 9223 RE: Duke Energy - Oconee Nuclear Station Units 1, 2, and 3 Subsequent License Renewal

Dear Ms. Johnson:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2, and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. CNS Licensing Dates Extended License Expiration ONS Unit License Expiration Date Date Unit 1 February 6, 2033 February 6, 2053 Unit 2 October 6, 2033 October 6, 2053 Unit3 July 19, 2034 July 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) assessing the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources on or near the ONS site.

This letter seeks input from the South Carolina (SC) state historic preservation office (SHPO) regarding such effects in the vicinity of ONS. Also, as part of the renewal process, the NRC may request a consultation in accordance with Section 106 of the National Historic Preservation Act

of 1966, as amended (16 USC 470), and the federal Advisory Council on Historic Preservation regulations (36 CFR 800) with your agency regarding the license renewal . The timeframe for the NRC consultation request is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021.

To facilitate our assessment and a smooth consult~tion by the NRC, we are contacting you early in the application process seeking input regarding the effects that license renewal activities may have on historic and cultural resources within the station's environs and any questions or additional information necessary for the consultation process. Figures depicting the station site and the vicinity within a 6-mile radius of the station and a table of known archaeological sites and historic properties in the station's vicinity are enclosed, and brief discussion of the station and its operations during the extended period of operation is provided below.

The ONS site is situated on 510 acres in eastern Oconee County and western Pickens County, South Carolina (SC), approximately 8 miles northeast of Seneca, SC, on the southern shore of Lake Keowee. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

There is no documentation of a cultural resources survey of the 510-acre property conducted prior to the construction of ONS; however, surveys were conducted prior to the construction of Lake Keowee. No NA HP-eligible cultural resources have been confirmed within the 510-acre ONS property. No structures within the ONS property have been documented through the Historic American Buildings Survey (HABS) or Historic American Engineering Record (HAER) programs. This license renewal will extend the ONS operating license from 60 to 80 years.

During this period, some of the CNS-associated structures will be greater than 50 years of age; however, there are no anticipated changes to use or construction plans that may alter their current status.

There are 103 offsite resources within 6 miles of ONS. Known archaeological sites and historic properties within a 6-mile radius of ONS are presented in Table 2, but due to the large number of resources, the table is restricted to NRHP-listed resources, as well as those that are potentially eligible, determined eligible, or very close proximity. There are three NRHP-listed resources within 6 miles of ONS.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the environs of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

2 of 6 IPa~ c

Should you or your staff have any questions or comments, please contact Christy Churchill at (980) 373-4183/ Christy.Churchill@duke-energy.com.

Sincerely,

) CJfJ-¢11/

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Table 2. Archaeological Sites and Historic Properties within a 6-mile Radius of ONS Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 3 of 6 IPa g 1.:

Table 2. Archaeological Sites and Historic Properties within a 6-mile Radius of ONs<*>

Site ID# County Quadrangle NRHP Status 38OC0001 Oconee Old Pickens Not evaluated 38OC0002 Oconee Old Pickens Not evaluated 38OC0036 Oconee Old Pickens NRHP listed 38OC0105 Oconee Old Pickens Probably not eligible 38OC0225 Oconee Old Pickens Probably not eligible 38OC0460 Oconee Old Pickens Potentially eligible 38OC0466 Oconee Old Pickens Potentially eligible 38PN0001 Pickens Old Pickens Not evaluated 38PN0002 Pickens Old Pickens Not evaluated 38PN0004 Pickens Old Pickens Not evaluated 38PN0005 Pickens Old Pickens Not evaluated 38PN0012 Pickens Old Pickens Not evaluated 38PN0051 Pickens Old Pickens Probably not eligible 38PN0149 Pickens Old Pickens Recommend additional work 38PN0178 Pickens Old Pickens Not eligible 38PN0179 Pickens Old Pickens Not eligible 0004 Oconee Seneca NRHP listed 0029 Oconee Old Pickens NRHP listed

a. Due to the large number of sites (103) within 6 miles of ONS, only sites that are potentially eligible, determined eligible, or in very close proximity are included.

4 Of 6 Ip,,µ l'

l.i t .

_I . *z.

,{

f' A.~*

I 1_ )

t* -~

-:., , l

~.,. I" ii ft'

-l*

  • t I ,

' (.*

!,,~..

J .. * \ . ., - t:~*./ ,.

  • * .._ *. 1 ,_;/!s; .>"

,. *!iJ .Pi ![Prei , 'i:fj,1/ ,* .

'> --: - - * ~* I J':/!"f.' °'. ,

\../ "' . .~

-.e: ' ~.,

-- / " . 'V'N. )I

.._ .-), q,-;*.

. .' *'-J ',

  • ,/

I/

  • I

/

  • ,:; ., . * .7 I

,,,.; * . i l~. I *, \ '

fI*

<, * ' .* . )

0..' .,r, ') ; v ~ * .. ~

. ~~ _r-' t i C) * **-... ". "*

,. ,

  • 1' \ '

"'1-~, ;.: *

\

  • --v
, J i::***

.* l ' .'

Legend c::JoNSSite

~---====M!ln 0 0 25 05 s or 6 I P a 12 \.'

Figure 2. ONS 6-mile Vicinity Legend a Airport Surface Water II Heliport c:JoNS Site US Route i_-_i&-Mil eRadius

-- State Highway Place Local Road D County - - -==::iM 0 2 ile$

~- -*- Railroad 6 of 6 I P a ,s L'

December 5, 2019 J. Ed Burchfield,Jr.

Oconee Nuclear Station Duke Energy ON0l VP/7800 Rochester Hwy Seneca, SC 29672 Re: Duke Energy - Oconee Nuclear Station Units 1, 2, and 3 Subsequent License Renewal Pickens and Oconee counties, South Carolina SHPO Project No. 19-EJ0085

Dear Mr. Burchfield:

Thank you for your letter of November 11, 2019, which we received on November 14, regarding the application by Duke Energy to renew the operating licenses for Oconee Nuclear Station Units 1, 2 and 3 (ONS). The State Historic Preservation Office (SHPO) is providing comments to Duke Energy as part of the application process which includes preparation of an environmental report assessing impacts from continued operation. The Nuclear Regulatory Commission may request a consultation pursuant to Section 106 of the National Historic Preservation Act and its implementing regulations, 36 CFR 800. Please note that consultation with the SHPO is not a substitution for consultation with Tribal Historic Preservation Offices, other Native American tribes, local governments, or the public.

Thank you for providing the list of offsite resources within a 6 mile vicinity of the ONS that are listed in the National Register of Historic Places (NRHP), "potentially eligible", determined eligible or in very close proximity. (Please see our statement on the use of the term "potentially eligible" for future reference.) There are no currently documented historic properties on the 510-acre ONS site, and no documentation of a cultural resources survey to identify historic properties having been conducted prior to ONS construction. We note that after a review of the site file for 38OC0105 we concur that no additional work is needed at that site. Also, please reference the above-ground NRHP listed properties by name, and delete the site numbers as these do no appear to correspond to a SHPO assigned site number.

We understand that no additional ground-disturbing activities are proposed to occur during license renewal period. However, if additional ground-disturbing activities were to be proposed we would recommend a cultural resources survey and consultation with our office prior to 830 I Parklane Road

  • Columbia, SC 29223
  • scdnh.sc.gov

ground-disturbance. We recommend the survey because the project area is in direct proximity to known archaeological sites and historic properties and contains moderate to high probability areas in which there is reasonable likelihood for the occurrence of prehistoric and/or historic cultural resources. Also, as the ONS-structures will become greater than 50 years of age during the renewal period we recommend that Duke Energy evaluate these associated structures for NRHP eligibility once they reach 50 years of age.

Finally, we recommend development of a management plan to spell out how cultural resources will be managed. This plan could include a plan for the evaluation of the associated structures for NRHP eligibility, a plan for conducting cultural resources survey if ground-disturbing activities are proposed, and any avoidance and buffering measures that are in place.

Please refer to SHPO Project Number 19-EJ0085 in any future correspondence regarding this project. If you have any questions, please contact me at (803) 896-6168 or ejohnson@scdah.sc. gov.

Sincerely, Elizabeth M. Johnson Director, Historical Services, D-SHPO State Historic Preservation Office Cc: Christy Churchill, Duke Energy 83 01 Parkla11 c Hoad

  • Cu lun11Jia , SC 29223
  • scdah.sc.gov

J. Ed Burchfield, Jr.

Vice President Oconee Nuclear Station e..(_~ DUKE

~ ENERGYe Duke Energy ON01 VP / 7800 Rochester Hwy Seneca, SC 29672

, 864.873.3478 t 864.873.5791 Ed.Burchfield @duke-energy,com BY U.S. MAIL RETURN RECEIPT REQUESTED November 11, 2019 Jonathan Leader State Archaeologist SC Institute of Archaeology and Anthropology 1321 Pendleton Street Columbia, SC 29208 RE: Duke Energy - Oconee Nuclear Station Units 1, 2, and 3 Subsequent License Renewal

Dear Mr. Leader:

Duke Energy Carolinas, LLC (Duke Energy) is preparing an application for renewing the operating licenses for Oconee Nuclear Station Units 1, 2, and 3 (ONS) for an additional 20 years (see Table 1). Duke Energy is contacting you for assistance in assessing the impacts from continued operation during this renewed license period.

Table 1. ONS Licensing Dates Extended License Expiration ONS Unit License Expiration Date Date Unit 1 February 6, 2033 February 6, 2053 Unit2 October 6, 2033 October 6, 2053 Unit3 July 19, 2034 July 19, 2054 As part of the renewal process, the U.S. Nuclear Regulatory Commission (NRC) requires that the license renewal application include an environmental report (ER) assessing the impacts from continued operation and any refurbishment undertaken to enable the continued operation of the units. The ER addresses the potential to impact historic and cultural resources on or near the ONS site.

This letter seeks input from the South Carolina (SC) state historic preservation office (SHPO) regarding such effects in the vicinity of ONS. Also, as part of the renewal process, the NRC may request a consultation in accordance with Section 106 of the National Historic Preservation Act of 1966, as amended (16 USC 470), and the federal Advisory Council on Historic Preservation regulations (36 CFR 800) with your agency regarding the license renewal. The timeframe for the NRC consultation request is anticipated to be within a few months of Duke Energy's application submittal, currently scheduled for 2021.

To facilitate our assessment and a smooth consultation by the NRC, we are contacting you early in the application process seeking input regarding the effects that license renewal activities may have on historic and cultural resources within the station's environs and any questions or additional information necessary for the consultation process. Figures depicting the station site and the vicinity within a 6-mile radius of the station and a table of known archaeological sites and historic properties in the station's vicinity are enclosed, and brief discussion of the station and its operations during the extended period of operation is provided below.

The ONS site is situated on 51 O acres in eastern Oconee County and western Pickens County, South Carolina (SC), approximately 8 miles northeast of Seneca, SC, on the southern shore of Lake Keowee. In accordance with NRC regulations, the transmission lines within the scope of the license renewal are those located within the ONS site boundary.

There is no documentation of a cultural resources survey of the 510-acre property conducted prior to the construction of ONS; however, surveys were conducted prior to the construction of Lake Keowee. No NRHP-eligible cultural resources have been confirmed within the 510-acre ONS property. There are 103 offsite resources within 6 miles of ONS. Known archaeological sites and historic properties within a 6-mile radius of ONS are presented in Table 2, but due to the large number of resources, the table is restricted to NRHP-listed resources, as well as those that are potentially eligible, determined eligible, or very close proximity. There are three NRHP-listed resources within 6 miles of ONS.

During the license renewal term, Duke Energy proposes to continue operating the units as currently operated. There are currently no ground-disturbing activities anticipated at the ONS site during the subsequent license renewal period. Currently, Duke Energy does not anticipate any refurbishment as a result of the technical and aging management program information that will be submitted in accordance with the NRC license renewal process.

Duke Energy does not anticipate the continued operation of ONS to adversely affect the environment or any cultural or historic resources.

As stated earlier, this letter seeks your input on our proposed continued operation of ONS on historic and cultural resources, including tribal cultural resources, within the environs of the station. We appreciate your notifying us of your comments and any information you believe Duke Energy should consider in the preparation of the ER. Duke Energy plans to include this letter and any response you provide in the ER.

2 of 6 I r ;1 g .-

Should you or your staff have any questions or comments, Christy Churchill at (980) 373-4183/

Christy.Churchill@duke-energy.com.

Sincerely,

}£,/~

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station Attachments:

Table 2. Archaeological Sites and Historic Properties within a 6-mile Radius of ONS Figure 1. ONS Site Figure 2. ONS 6-mile Vicinity 3 of 6 IPa r ~

Table 2. Archaeological Sites and Historic Properties within a 6~mile Radius of ONs<al Site ID# County Quadrangle NRHP Status 38OC0001 Oconee Old Pickens Not evaluated 38OC0002 Oconee Old Pickens Not evaluated 38OC0036 Oconee Old Pickens NRHP listed 38OC0105 Oconee Old Pickens Probably not eligible 38OC0225 Oconee Old Pickens Probably not eligible 38OC0460 Oconee Old Pickens Potentially eligible 38OC0466 Oconee Old Pickens Potentially eligible 38PN0001 Pickens Old Pickens Not evaluated 38PN0002 Pickens Old Pickens Not evaluated 38PN0004 Pickens Old Pickens Not evaluated 38PN0005 Pickens Old Pickens Not evaluated 38PN0012 Pickens Old Pickens Not evaluated 38PN0051 Pickens Old Pickens Probably not eligible 38PN0149 Pickens Old Pickens Recommend additional work 38PN0178 Pickens Old Pickens Not eligible 38PN0179 Pickens Old Pickens Not eligible 0004 Oconee Seneca NRHP listed 0029 Oconee Old Pickens NRHP listed

a. Due to the large number of sites (103) within 6 miles of ONS, only sites that are potentially eligible, determined eligible, or in very close proximity are included.

4 Of 6 IpHf l'.

Mile5 0 025 o.s 5 of 6 I p .I g C

Figure 2. ONS 6-mile Vicinity Pickens County I.

Central

,~*

Clemson Legend a Airport

  • Surface Water a Heliport c:]0NSS1te U.S . Route ;_-_, 6-Mile Radius

- State Highway Place local Road O eounty

~ RaillQad 6 Of 6 j p cl~ C

Oconee Nuclear Station Units 1, 2, and 3 Application for Subsequent License Renewal Appendix E - Applicants Environmental Report Attachment E: CWA Water Letters

UVl\t\U IVICIVI 1:JC:M ':,

.~ Lachlan L. Hyatt. Choirman c William M . Wilson, Vic".!-Chaarman

~.... . ,,_ I. DeOuincey Newman. Secretary W A. Barnette. Jr.

c- .,..

Leonmd W. Oouglao. M .D .

J. Lorin Mason. Jr .* M.D William C . Moore . Jr., D.M .O.

SOUTH CAROLINA DEP,1RiMENT OF HEALTH AND ENVJRONMEMJAi CONTROL '!:1~1*: .-t*

~{'. V * * * . ~

~ KEN"W~~cm:1<?-f.o.: M.P.i'.'2 ~"11MISSIONER August 2, 1976 u*.; l\u b U u J. ~~l°ON SIMS .'BUILDING - 21100\ 'ULL STREET I

CRLJ.111,,iPIA, SOUTM CAROLINA 29201 1 ~ * ,.- J.

u~EP.t..-mr.Glt.*

._:_: i.S. , .;

Mr. Paul J. Traina Director, Enforcement Division ATLAllTA, (ii~*

U.S. Environmental Protection *Agency 1421 Peachtree St,, N.E.

Atlanta, Georgia 30309 Re: State Certification Duke Power Company Oconee Nuclear Station Oconee County

Dear Mr. Traina:

Pursuant to Section 401 of the Federal Water Pollution Control Act (33 u.s.c ~

1251, 1341; hereafter the "Act"), the State of South Carolina issues this certification for the referenced industry as an applicant for a NPDES permit to discharge into navigable waters. Certification is issued with the following comments:

1. Page 2 of the permit - Once Through Cooling Water Delete the third paragraph "Permittee's discharge *** " and add the following:

"The waters at sample point #504 shall not exceed a monthly average temperature of 32.2°C(90°F) nor shall the monthly average water temperature at sample point 0603 be more than 1.670C(JOF) greater than that of waters at sample point 0501.

Sample points #501, #504, and #603 as described in the Semi-Annual Report period ending December 31, 1975 submitted by Duke Power Company to the Nuclear Regulatory Commission are defined as follows:

/1501 - in Lake Keowee near the Little River Dam 0504 - in Lake Keowee at the Keowee Hydro intake 0603 - in Lake Hartwell at S.C . Highway 93 bridge Temperatures at these points shall be monitored once p~i:; ~ , / ; .1 week at a depth of 0.3 mete't's," l n:_*. ) :~*i*;_\ ~,;:i

..... . l - * ** _ , . .. .. '- * . t I .:J

.1  ;-

  • I ., - * ,I ~

I* * ' t I , ... *' ' ' .. I ** * . - -*

~ :j ,\ i .:J"' .:; -.4

\

A*letter to Paul Traina .

Page 2 August 2, 1976

2. Page 6 of the pennit - Sewage Treatment Plant Recommend that the measurement frequency for B0D5, TSS, and Fecal Coliform be once per month.

Sincerely, u t. .I

~les i::ef?.~~~rector Industrial & Agricultural Wastewater Division Bureau of Wastewater & Stream Quality Control CRJ/JP/jk

i;;rn:rl~0Pminit. No. SC0000515 Applicr.!:ion Na. SC ....074 0YN 3 000037

(

AU11lORIZATICl!-f TC D!SCli/\RGE l:;1.'"DER 11rE HATIO~AL rOLLliTAl:T DISC}L\RGE ELimNA'fiml SYS'rI:H In co1~pl:iancc with the provisions of the Federal Water Pollutiora Control Act-, as ~mt?nd~d, (33 U. S.C. 1251 et. seq; the "Act")*

Duke Power CoApany

,P.O. Box 2178 Charlotte, North Carolina 28201 is authorized to discharge from a facility located at Oconee Uuclear Station P.O. Box 1175 Seneca, South Carolina tc, rec~j_vir,e waters narai:G. Lake Keowee from c!i.scharge point:; enumerated her.Jin, as serial nuttbers 001, 002, 003, 004 and 005 Juring the effective pcri1.,d of this perm.it in acco:i:dance with efflt.,ent limitations, monitoring requirements and other conditions set forth in Parts I, II, and III hereof.

'ibis perr1it is a tnodification of the !-."PDES pe:rm.it issued for this facility on December 31, 1974, and replac~s that pe:-ti.t in its entirety. This modified permit shall become effective 30 days after receipt.

Thi.s modified p~rmit and the autho~:ization to discharge shall e,:pire at minnight, February 18, 1980. P-:--" ............. i. ... , 1 ,..,,..~ discharge after the abcv~ date of e1::pi.ration l7ithout prior authorizat:ion. In order to receive authorization to discharge beyond the above date of e~q>i.!'otio!l, th~ perraittee shall submit such information, forn.s, and fees as are required by tha Agency authorized to issue NPDES permits no later than 130 days prio~, to the above date of expiration.

/ I I

Signed this 30 1976*, . l

_ .,ol Admini!a-: ratot'

Q A. Et'i:L: f,lMITATIONS Alm MONITORING REQUIRf.KE?ITS During tl, . ; ; . *A beginning on effoc:tl\*~ '1:ite nnd laat!ng through expir~ltlon the pennitte~ , *. ,: horhed to discharge from outfall(s) serinl number(s) 001 discharged to Lake Keowee Such discharges ehall be limited and monitored by the pennittee as specified below:

Effluent Characteristic Discherge Limitations Monitoring Requirements Daily Instantaneous Measurement Saople Average Maximum Frequency _!.rp_~

Flow-ml/Day (MGD) N/A N/A Hourly Re~ordcr or Calculation

-'Temperature tu:se "C{°F5°- H/A Hourly Free available chlorine (mg/1) S:-i! Below 1/wec*k Grabs Total residual chlorine (mg/1) ~(*r. !7,.~lnw 1/ue ..*k C.r:1hs After July 1 1 1977 1 free available chlorine shall no~ exceed an average concentration of 0.2 mg/1 and a maximum instantaneous concentration of 0.5 mg/1 at the outlet corresponding to an individual unit. Neither free available chlorine nor total residual chlorine may be discharged from any unit for more than t_.o hours in any one day and not more than one unit may discharge free available or total residual chlorine at any one time unless the permittee can demonstrate to the Regional Admini3trator that the unit(s) cannot operate efficiently at or below this level of chlorination.

  • Discharge temperature shall not exceed 37.8°C (100 . 0°F) for a time period in excess of two hours, unless critical hydrological and mcterologlcal con<lltions arc combined with high customer demand which cannot be mat from other sources. Under tlie.se lnt:t~r conclltlons, the discharge ternpt!raturl! shnll not be .'11Jowe<l to exceed J9.4°C (103.0°F). Maximum temperature rise above intake shall be limited to 12.2°C (22°F) when the intake temperature is greater than 20°C (68°F), E:

0

~,

Cl Permittee's discharge from Keowee Hydro Station to Lake Hartwell may not exceed a daily "'c1 1-d "a average temperature of 32°C (90°F). Discharge temperature fro~ Keowee Hydro Station shall fll Ill be measured by continuous recorder. .*

11 OQ Ji Q ~

0

~N H

0 Ml Samples taken in compliance with the monitoring requirements specified above shall be taken At the Cl')

n following location(s): Chlorine at an outlet corresponding to an individual unit prior to ~_i~ini wit! 0 o,-.

ether waste streams 1 temperature at condenser intake and discharge. g VI VI I.II

A. EFFLUENT LIMITATIONS AND MONITOnING REQUIREMENTS

~~Q /'~ y During the period beginning effective date and lnsling through June 30 1 *1977 __ ____ ..

!the pennittce is authorized to discharge tcom outfnll(s) scrinl number(s) 002

- Wastewater. treatment Rv~t~m rli~ch~r~~tl. _

to Lake Hartwell .

Such discharges shail be lunitcd nnd monitored by the permittee as specified below:

ECfluent O,aracterslic Discharge LimiL'ltiou!t MonitorirtJ! Itc.>quircrn_~_!-~

Daily Average Daily Maximum ?vfoasi:rcmen t S.-..mplc

. Frequency Type Flow-m3/Day (MGD) N/A N/A _1/week ,W_eir rearfinv O~l and Grease {mg/l) N/A Jl/A . 2/month ur.:ili

  • Total Suspended Solidg (mg/1) N/A

' _N/A_ 2/month The pH shall not be less than -J/1:,. _ standard units nor greater than .N/A __standard units and shall be monitored once each week by taking a grab sample.

  • There shall be no discharge of floating solids or visible !oam In other than trace amounts.

Samples taken in compliance with the monitoring requirements specified above shnll be tnken at the following location(s):

en E._

discharge from the wastewater treatment system prior to mixing with any other 0 0

vaste stream. 0 ,_.

g u,

,_.U1 VI

A. EFFLUENT LIMl'.fATi0r.:s AND MONITORING REQUIREMENTS Puring the period beginning July 1, 19 77 and lusting through eJ\.-piration

!the pennittee is authorized to dischruce from out!all(s) serial number(s) 002

- Wastewater treatment system discharged to Lake Hartwell *

  • Such discharges shall belimirod and monitored hy the pcrmittce ns specified below:

Effluent 0111.rncteri&tic Di;..chm t!c Limitations Monitoring Requir~menb Daily Averugc Da ily Maximum Measurement

, Frequency Flow-m3/Day (MGD)

Oil and Crease (mg/1)

N/A 15

' 1/week 2/moni:h Weir reading C,* ~h Total Suspended Solids {mg/1} 30 2/month r.r;\h 0

l:J Thi? pH shall not be less than 6. O st.n.ndnrd units nor l!reat"r than 9. O stand:i.rd units and sh11ll be monit1.m*d ,. ,

once each week by taking_ a_ grab sample.

  • 0

'fhere shaU be no discharge or floating solids or visible foam in other lhnn trace amounts.

"'V 3 ..

....~

'),

Sum pies taken in compliance \.Vith Ute monitntin ~ requin*mcnt!: spccifit>d ubo*,e shall he tokC'n at tlw f, .lln *; :ir,(! l"'=~ti .-,: 1(*. ):

en .-~

discharge irolll. th~ wastewater treatment system prior to mixing with any other waste streal'\. n 0

01...1 gu, Vt U1

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning effective date and lasting through expiration the permittee is authorized to discharge from outfall(s) serial number(s) 003 - Radwaste System discharged to the Keowee Hydro Tailrace This discharge is regulated by the Nuclear Regulatory Commission under the provisions of operating license's DPR-38, DPR-47 and DPR-55 and is monitored and reported to the Nuclear Regulatory Com!ldssion. *-* - - - -

f

\.,

r-,

"'d!tf

~ Ill

....a<<m

,s t

fT >

V1 z

0 0

t-fl en n ,-

0 0 VI 0

0 VI VI

'\

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

- I During the period beginning July 1, 1977 and lasting through *expiration

'the permittee is authorized to discharge from outfall(s) serial number(s) 004* - Sewage Treatment

,Plant Discharged to was~ewat!?-.r. trea_tme~t syst~m __ _ ___ ___ .

Such discharges shall be limited and monitored by the permittee as specified below:

Effluent Cliaracteristic Discharge Limitations Monitoring Requirements Organisms per 100 ml mg/1 (Geometric mean) Measurement Sample Daily Avg Daily 'Max Daily Avr,. Daily Max Frequency Type Flow-ml/Day (MGD) . N/A N/A , N/A N/A 1/month during sampling BOD5 30 45 N/A N/A 1/:iuarter grab

'fotal Suspended Solids 30 45 N/A H/A 1,.tJ.uarter grab Fecal Coliform Bacteria N/A N/A 200 400 1/quarter grab

. J 0

~::i s

0

.,, 'ti n, Ill

'"1~

J Ill t-'-

rt ...

z: 0\

0


nen "'

0 Samples taken in compliance with the monitoring requirements specified above shall be tnken a t the following location(s): sewage treatment plant discharge prior to mixing with any other g0 ....

1.11 0

waste stream. VI I-'

VI

  • Serial number assigned for monitoring and identification purposes.

A. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS During the period beginning July 1, 1977 and lasting through expiration the permittee is authorized to discharge from outfall(s) serial number(s) OQ5l\.. Metal Cleaning discharged from station settling basin(s)

Such discharges shall be limited and monitored by the permittee as specified below:

Effluent Characteristic Discharge Limitations Monitoring Requirements Daily Avg. Daily Max. Measurement Sample

    • Frequency Type Flow-m /Day (MGD) N/A N/A 1/batch Instantaneous and/

Calculation Copper, Total (mg/1) 1.0 LO  !/batch Grab Iron, Total (mg/1) 1.0 1.0 1/batch Grab Metal cleaning wastes shall mean any cleaning compounds, rinse waters, or any other waterborne residues derived from cleaning and metal process equipment including, but not limited to, _steam _generator tub~_Eleaning.

0 S!

1 Samples taken in compliance with the monitoring requirements specified above sh~ll be taken at r-,

C the following location(s): Settling basin(s) discharge prior to mixing with any other waste streams.

  • Serial number assigned for monitoring and identification purposes. ~....,

0 en o 0n "'

o._.

g Vl

....VIu,

I

. ,_ *M\.I. L I

I i,'. JJlf!r:J Page a .* of 15 Permit No . SC0000515 H. SCHEDULE OF co~~LIANCr.

1. The permit tee shall achi~ve compUance with the df luent limitcJtions specified for discharges in accordance uith the following schedule:
a. Achieve operational level sewage treatment plant - 6/30/77
2. No later than 14 calendar days following a date identified in the above schedule of compliance~ the permittee shall submit either a report of progress or, in the case of specific actions being required by identified dates, a written notice of compliance or noncompliance. In the latter case, th~ notice shall include the cause of noncompliance, any remedial actions taken, *and the probability of meeting the next scheduled requirement.

Note: Any construction of new waste treatment facilities or alterations to existing waste treatment facilities will require a permit or authoriza-tion for construction in accordance with applicable state law and regulation.

PART I f,!0Dlfl£D ****~*,* 9 "' 15 l'rn1111 '°'" SC0000515 C. MONITORING AND REPORTING

1. Reprer;entaliue Sampling Samples and mt!asurements taken as requirnd herein shall he representative of the volume 2!Jd nature of the monitored discharge.
2. Reporting Monitoring results obtained during the previous 3 months shall be summarized for each month and reported on a Discharge Monitoring Report Fonn (EPA No. 3320-1 ).

postmarked no later than the 28th day of the month following the completed repor_ting period. The first report is due on January 28, 1977 . Duplicate signed copies of these, and all other report.a requ:red herein, shall be submitted to the Regional

. Administrator and the State at the following addresses:

Environmental Protection Agency South Carolina Department of Water Enforcement Branch AL~ Health and Environmental Contn 345* Courtland Street, N. E. 2600 Bull Street Atlanta, Georgia 30308 Columbia, South Carolina 29201

3. DetlnUkm,
a. The "daily avorage" concentration means the arithmetic average (weighted by flow) of all the daily determinations of concentra-tion made during a calendar month. Daily determinat~ons of concentration made using a composite sample shall be the concen-tration of the composite sample. When grab samples are used, the daily determination of concentration shall be the arith~etic average (~eighted by flo-~) of all the samples collected during that calendar day.
b. The "daily maximum" concentration means the daily determination of concentration for any calendar day.
c. Weighted by flow" means the summation of each sample concentration times its respective flow in convenient units divided by the summation of the ~low values.
d. "Nekton"* means free swil::mdng aquatic animals whether of freshwater r-or marine origin.
e. For the purpose of this permit, a calendar day is defined as any 24-hour period.

.. PART I 1.w: IF1 £D . ,...,... 10 ul 15 l'l!rmu Nu SC0000515

4. TIit Procedure, Test procedures for the analysis of pollutants shall conform to n*;:ulations published pursuant lo Section 304(g) of the Act, und~r which such proc~durcs may h~ required.
5. Recording of Results For each meanirement or sample taken pursuant to Ute requirer.,ent.s of this permit, the permittee shall_record t.'1e following information:
a. The exact place, date, and time of sampling;
b. The dates the analyses were performed:
c. The peDOn(s) who performed the :malysa,;
d. Tha analyticll tachniqua, or methods u3ed: and
e. The results of all required analy~s.
6. Additional Monitoring by Permittee If the pennittee moniton; any "pollutant at the location{&) designated herein more frequently than required by this permit, using approved analytical methods as specified above, the results of such monitoring shall be included in the calculation and reporting of the values required in the Discharge Monitoring Report Form (EPA No. 3320-1 ). Such increasad frequency sh3ll aboJ;e indicated.
7. Records Retention All records and information resulting from the monitoring activities required by this permit including all records of an:uyses performed and calibration and maintenance of inatrumentation and recordings Crom continuous monitoring instrumentation shall be retain~ for a minimum of three (~) yean, or longer if requested by the Regional Administrator or the State water pollution control agency.

PART II MODIFIED l'.i)!C ll

  • ot' 15 J'.-111111 No. SC0000515 A. MANAGEMENT llEQUIHEMENTS
1. Chance in Discharge All dischar~es aulhorii.ed hcri?in shall be consist..-nt with Lht: krms anti conditions of thi~

permit. The discharg~ of any pollutant icJ*inlificd in tins permit more frc4ucnlly than or at a )eve) in cxcl*ss of that authori1.cd 1;hall constitutt' a violation of the permit. Any anticipated facility expansions, produc tion increase.;, or process modifications which will result in new, different, or incrca.~cd discharges of pollutants must be reported by submission of a new NPDES application or, if such changes will not violate tht! effluent limitations specified in this permit, by notice to the permit issujng authority of such changes. Following such notice, the permit may be modified to specify and limit any poUutant& not previously limited.

2. Noncompliance Notification If, !or any reason, the pennittee does not comply with or will be unable to c-omply with
  • any daily maximu~ emuent limital1on specified in this permit, the permittce shall provide the Regional Administrator and the Srnte with the following information, in writing, within five (5) days of becoming aware of such condition:
a. A descriptio['\ of the discharge and cause of noncompliance; and
b. The period of noncompliance, including exact dntes and times; or, if not corrected, the anticipated time the noncompliance is expected to continue, and steps being taken to reduce, eliminate and prevent recurrence of the noncomplying discharge .
3. Facilities Operation The permittee shall at all times maintain in good working order and operate as efficienUy as possible ail treatment or control facilities or systems installed or used by the permittee to achieve compliance with the terms and conditions of this pennit.
4. Adverse Impact The pcrmittee shall take all reasonable steps to minimize .any adverse impact to navigable waters resulting from noncompliance with any effluent limitations specified in this permit, including such accelerated or additional monitoring ns necessary to determine the nature and impact of the noncomplying discharge.
5. Byp0$Sing Any diversion from or bypass of facilities necessary to m.untain compliance with the terms and conditions of this permit is prohibited, e:,.cept (i) where unavoidable to prevent loss of life or severe property damage, or (ii) where excessive storm dra,inagc or runoff would damage any facilities necessary for compliance with the effluent limitations and prohibitions of this permit. The permittce shall prompt)y notify the Regional Administrator and the State in writing of each such diversion or bypass.

\

I I PART II l':aj!t: 12 . ur 15 C- i.'. .,)'.FIED rwnir Nu. SC0000515

6. Remoued Sub$tance~

Solids, sludge~, filter backwru;h, or other pollutsnts removed in the course of trcatme>nt or control of v,astewaters shall be disposed of in a manner such a.; to prevent any pollutant from such materials from entering navigable waters.

7. Power Failure, In order to maintain compliance with the effluent limitations and prohibitions or this pennit, the permittee shall either:
a. In accordance with the Schedule of Compliance cont:i.ined in Pa.rt I, provide an alternative power source sufficient to operate the *,vastewatcr control facilities; or, if such alternative power source is not in existence, and no date for its implementation appears in Part I,
b. Halt, reduce or otherwise control production and/or all discharges upon the reduction, loss, or failure of the primary source or power to the wastewater control facilities.

G-9 B. RESPONSIBILITIES

1. Right of Entry ...

The permittee shall allow the head or the State water pollution control agency, the Regional Administrator, and/or their authorized representatives, upon the presentation of credentiala:

a. To enter upon the permittee's premises where an effluent source is located or in which any records are required to be kept under the terms and conditions of ti,is permit; an~
b. At reasonable times to have access to and copy any records required to be kept under the terms and conditions of this permit; to inspect any monitoring equipment or monitoring method required in this permit; and to sample any discha,me of pollutants.
2. Trarufer of Ownership or Control In the event of any change in control or ownership of facilities from which the authorized discharges eman_:ite, the permittee shall notify th~ succeeding owner or controller or th*e existence of this permit by letter, a copy of which shall be Corwarded to the Regional Administrator and the St.ate water pollution control agency.
3. Availability of Report&

EJ:cept for data determined to be confidential under Section 308 of the Act, aJl reports prepared in accordance with the terms ot this permit shall be available f~r public

PART II I.:Jt!r-iED J>ai:c 13 of 15 Permit No, SC0000515 inspection ol the offices oC the* Stntr. w:i.Lr.r pollulion ccmLrnl ::!~l*m~y and ttw Rl*J.,rion:il Administrator. As requir"o by the Ar:t, cfflur.nL d1t.t3 shall not he* c:onsidr.rcd t:onfidl!nliul.

Knowingly mnking any fal~e statemcnL 011 any such report may rl!SulL in lhl! irnpoliilion of criminal penalties as provided !or in Section 309 of the Act.

4, Permit Modification After notice and opportunity for a hearing, this permit may be modified, suspended, or revoked in whole or in part during its tenn for cause includin*g, but not limited to, the following:

a. Violation of any terms or conditions of this permit;
b. Obtaining this permit by misri!,)resentation or failure to disclose fully all relevant facts; or
c. A change in any condition that requires either a temporary or permanent reduction or elimination of the authorized discharge.
5. Toxic Pollutants Notwithstanding Part II, B-4 above, if a tmcic effluent standard or prohibition (including any schedule of compliance specified in such effluent standard or prohi~ition) is established under Section 307(a) or the Act for a toxic pollutant which is present in the discharge and such* st.andara or prohibiflon is more stringent than any limitation for such pollutant in thia permit, this permit shall be revised or modified in accordance with the toxic e!.rluent standard or prohibition and the pennitt.ee so notified.
6. Ciuil and Criminal Liability Except as provided in permit conditions on "Bypassing" (Part II, A-5) and "Power Fnilures" (Part II, A-7), nothing in this permit shall be construed to relieve the permittee from civil or criminal penalties for noncompliance.
7. Oil and Hazordou Subatance Liability Nothin'g in tnis permit shall be construed to preclude the institution of any legal action or relieve the pennittee from any responsibilities, liabilities, or penalties to which the pennittee is or may be subject under Section 311 of the Act.
8. State Law:!

Nothing in this permit shall be construed lo preclude the institution of any legal action or relieve the pennittee from any responsibilities, liabilities, or penalties established pursuant to any applicable State law or regulation under authority preserved by Section 510 ot the Act.

\

.. ,.~ ... **,,:-..Page l1lv~u h .. LI 14 * 'of 15 Permit No. SC0000515

9. Property RightA The issu11nce of this permit does not con*rny ;iny prnpc.!rly rights In either

-real or personal property, or any l!:<cl11sivc prlvll~~es, nor tlol*s It authorize any injury to private property ~r any invasion of pcrsonfll rights, nor any infringement of Federal, State or local laws or regulations.

10. Severability The provisions of this pennit are severable, and if any provision of this permit, or the application of any provision of this permit to any circum-stance, i _s held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected hereby.

PART III OTHER REQUIREMENTS A. In the event that wuste streams from various sources are combined for treatment or discharge, the quantity of each pollutant or pollutant property attributable to each controlled waste source G shall not exceed the specified limitation for that waste source.

B, If the permittee, after _monitoring for at least six months, deter-mines that he is consfl;tently meeting the effluent limits contained herein, the permittee may request of the Regional Administrator that the monitoring requiremants be reduced to a lesser frequency or be eliminated. -*

C. There shall be no discharge of polychlorinated byphenyl compounds such as those co*nly used for transformer fluid.

O. The company shall notify the Regional Administrator in writing not later than sixty (60) days prior to instituting use of any additional biocide or chemical used in cooling systems, other than chlorine, which may be toxic to aquatic life other than those previously reported to the Environm~~tal Protection Agency. Such notification shall include:

1. Name and general composition of biocide or chemical.

2, Frequency of use.

3. Quantities used.
4. Proposed effluent limitations.
5. EPA registration number.

.. PART III

\

r:;ODlFl£0 Page lS of 15 Permit No. SC0000515 t . Intake screen wash water may be discha rged without limitations or monitoring requirements.

f . Copies of environmental r eports require d by the Nuclear Regulatory Commission which are pertinant to water quality in Lake Keowee or Lake Hartwell shall be submitted to th~ Regional Administrator and State Director.

I G. By June 30, 1977, low volume wastes (wastewater from all sources except those for which specific limitations are otherwise requir~d in this permit, including, but not limited to waste waters from wet scrnM,er air pollution control systems, ion exchan ge water treatment systems, water treatment evaporator blowdown, laboratory and sampling streams, floor drainage, cooling tower basin, cleaning wastes and blowdown from recirculating house service water systems) shall be discharged to the wastewater treatment system. Permittee shall continue established procedures designed to minimize oil and grease discharges.

'\

Stntc Cert;tfiC'.:ition: The State Pollution Control ,\p,t*ncy hns CPrtlrit'cl

  • the 9ischni*sc!(t;)-;-ovc't'cd hy this permit \d th ~~f:l.'_~i_!:i.,>ns in accorcl :u11:c with section l,OJ. of *the Fcdcrnl \fat:cr Polluti.on Control Act *;\mcnJ1::~*~,L~

of 1972, ,-:hich *r~~quires th.tt condii.:lon~ of ct.?rd.licntion ~h;1ll . be:,~om~-

cond:f.tions of the permit. In the event of <lliY con fl le*:: hclt.'ci:n thl! co11-ditions or this p~rmit and those in the .ittc:ch.:>d ccrtificntic~, the more restrictive shall rule.

Healthy People. Healthy Communities.

September 29, 2020 J. Ed Burchfield, Jr.

Site Vice President Oconee Nuclear Station ON0l lVP / 7800 Rochester Hwy.

Seneca, SC 29672

Dear Mr. Burchfield:

I am writing in response to your letter to Fran Marshall dated August 19, 2020 in which you request confirmation that the Oconee Nuclear Station's (ONS) current Clean Water Act Section 401 Water Quality Certification applies to the ONS second renewal.

The South Carolina regulations governing the issuance of 401 Water Quality Certifications (R.61 -

101) provide DHEC with the authority to certify federal licenses and permits for activities which during construction or operation may result in any discharge to a navigable water. These regulations clearly tie our certifications to a federal permit or license. As noted in your letter, our records indicate that DHEC's most recent 401 Water Quality Certification was issued on August 2, 1976.

Thus, unless there is a new federal permit or license associated with the ONS second renewal that may result in a discharge to navigable waters, our position is that the most recent certification remains valid and no additional 401 Water Quality Certification will be required.

If you have any questions, please contact me at (803) 898-3105 or at prestohs@dhec.sc.gov.

Sincerely, rl!:!rr~

Water Quality Division SCDHEC - Bureau of Water cc: Fran Marshall - SCDHEC S.C. Department of Health and Environmental Control 2600 Bull Street. Columbia, SC 29201 (803) 898 -3432 www.scdhec.gov

/_~ DUKE J. Ed Burdlfleld, Jr.

Vice Presidenl ENERGY. Oconee Nuclear Station Duke Energy ONOI VP I 7800 Rochester H~

Seneca, SC _29672 o: 864,873.3478 t 864.873. 5791 Ed.Burchfieldfidul<e-ene(!Jy.com BYU.S.MAIL RETURN RECEIPT REQUESTED 7019 2280 0000 1128 5705 August 19, 2020 Fran Marshall South Carolina Department of Health and Environmental Control 2600 Bull Street Columbia, SC 29201 RE: Duke Energy - Oconee Nuclear Station Units 1, 2, and 3 Subsequent License Renewal, Request for Verification of Clean Water Act Section 401 Certification

Dear Ms. Marshall,

The purpose of this letter is to request that South Carolina Department of Health and Environmental Control (DHEC) confirm that the site's current Clean Water Act Section 401 Water Quality Certification applies to the second renewal of Oconee Nuclear Station's (ONS) federal operating licenses and that no additional certification is required from DHEC to satisfy the requirements of Section 401 prior the issuance of the license renewal.

On April 17, 2019, Mike Ruhe (Duke Energy) and Heather Preston (DHEC) discussed the CWA Section 401 WQ Certification for ONS. Heather Preston responded in an email to Mike Ruhe, on April 17, 2019 confirming that DHEC's most recently issued 401 Water Quality Certification for the ONS project (dated August 2, 1976) was still valid.

The ONS federal operating licenses were originally issued in l 973~ 1974, and renewed in 2000.

ONS discharges to Lake Keowee and the Keowee River under NPDES permit SC0000515 and NPDES General Permit SCROOOOOO for Storm Water Discharges Associated with Industrial Activity. These discharges would continue during the second license renewal period of its federal operating license in compliance with permits SC0000515 and SCR00OO00 and any subsequent

renewals of these permits. Duke Energy does not propose any additional discharges for the operation of ONS.

To facilitate the second renewal of the ONS federal operating license, Duke Energy kindly requests that DHEC confirm that ONS's 401 Water Quality Certification issued on August 2, 1976 remains in effect for ONS for the requested license renewal term, and that the U.S.

Environmental Protection Agency's new "Clean Water Act Section 401 Certification Rule" to implement the water quality certification process, effective September 11, 2020, will not impact this applicability.

Should you or your staff have any questions, comments, or need additional information, please contact Mike Rube at (704) 996-0356 / Mike.Ruhe@duke-ener .com.

Sincerely, Jd~~

J. Ed Burchfield, Jr Site Vice President Oconee Nuclear Station cc: Heather Preston, SC-DHEC

Attachment 1 Clean Water Act Section 401 Certification Rule Certification Request Information Items The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief.

The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.

Project Proponent: Duke Energy Carolinas, LLC (Duke Energy)

Point of

Contact:

Mike Ruhe (980) 373-3231 / M ik e.Ruhe(a),duke-energy.com Proposed project and applicable federal licenses: Renewal of the following licenses issued by NRC for continued operation of Oconee Nuclear Station under its current configuration for an additional 20 years beyond the current license expiration.

License License Expiration No.

Oconee Nuclear Station Unit 1 Renewed Facility Operating DPR-38 February 6, 2033 License Oconee Nuclear Station Unit 2 Renewed Facility Operating DPR-47 October 6, 2033 License Oconee Nuclear Station Unit 3 Renewed Facility Operating DPR-55 July 19, 2034 License Discharge location:

A map of the ONS location and 6-mile vicinity is shown on Figure 1. The location of the external NPDES outfalls are shown on Figure 2.

Discharge description, receiving waters, treatment, and monitoring:

I . NPDES Permit #SC0000515 Outfall 001, non-contact cooling water consisting of condenser circulating water and miscellaneous non-contact cooling water Receiving Water: Lake Keowee approximately 1,200 feet NE of the station Treatment prior to discharge: None Discharge monitoring: hourly sampling for effluent flow and temperature (intake and effluent)

2. NPDES Permit #SC0000515 Outfall 002, process wastewater composed of yard drains, air handling units, decant monitor tank, tendon gallery sumps, turbine building sump monitor tanks, Reverse Osmosis (RO) reject flow and RO cleaning flow, Standby

Shutdown Facility sump, intake dam underdrain system, oil and chemical product unloading/ storage areas, yard drainage areas, turbine building sumps, chemical metals cleaning, CCW gravity drain tests and condenser unwatering

.Receiving Water: Keowee River downstream of Keowee Hydro Treatment prior to discharge: Conventional Wastewater Treatment System consists of three (3) treatment ponds. The ponds are identified as Chemical Treatment Ponds (CTP) 1, 2 and 3. CTP 1 and 2 are parallel ponds that operate in a batch mode. One pond will be in service receiving wastes, while the other pond is either providing treatment, discharging, or in standby. The treatment provided by CTP 1 and 2 includes:

sedimentation, neutralization, mixing, aeration and chemical oxidation. Pumps are provided for re-circulation or controlled discharge to CTP 3. Treatments to inputs into CTP 3 include neutralization, precipitation, mixing, dechlorination, and oxidation.

Discharge monitoring: weekly sampling of effluent flow and pH; monthly sampling for Total Suspended Solids, oil and grease, and Total Residual Chlorine

3. NPDES Permit #SC0000515 Outfall 004, process wastewater from the Liquid Radwaste Treatment System Discharge Receiving Water: Keowee River approximately 200 feet below Keowee Hydro Treatment prior to discharge: The Liquid Radwaste system removes and controls radionuclide concentrations in radiologically contaminated water. The waste streams are collected in holding tanks for processing in batches through filters, and /or appropriate mass transfer bed materials. The mass transfer bed materials include ion exchange resin, zeolites, activated carbon, or other appropriate adsorption materials. Oxidation and neutralization may also be used, if the waste does not meet process specifications. The type and amount of treatment provided for each batch of waste depends on the type and quantity of radiological contamination present. The treated waste is collected in holding tanks prior to discharge. All liquids are treated to NRC effluent release criteria ( 10 CFR Part 20). They are then discharged to the Keowee River after mixing with the Keowee Hydro Station Tailrace in compliance with NRC requirements (10 CFR Part 50).

Discharge monitoring: monthly sampling for effluent flow and pH

4. NPDES General Permit SCR000000 for Storm Water Discharges Associated with Industrial Activity - stormwater is collected in yard drains and routed to Chemical Treatment Pond 3 which discharges to NPDES Permit #SC0000515 Outfall 002.

Note: NPDES Permit #SC00005 l 5 Outfall 007 is a discharge of noncontact cooling water and dewatering/sump water from Keowee Hydro which is operated under a separate federal license, Federal Energy Regulatory Commission License No. 2503-154.

Other federal, interstate, tribal, state, territorial, or local agency authorizations required for the proposed project: See Tables 1 and 2.

Figure 1. ONS Site and 6-Mile Radius

).,

l l

Central Clemson Legend 1:1 Airport Surface Water

~ Heliport CJoNSSite

- U.S. Route j_-_j 6-Mile Radius

~ State Highway l 1 Place Local Road [ ~-:_] County *---====Mi 0 2 les

_,__ Railroad

Figure 2. NPDES-Permitted External Outfalls at ONS Legend O oNSSite i-_--1County


====:=:::iFeet 0 1,000 2,000

Table 1. ONS Environmental Permits for Current Operations Expiration Agency Authority Requirement Number Date Authorized Activity NRC Atomic Energy Act, 10 ONS license to DPR-38 21612033 Operation of ONS CFR50 operate Unit 1 Unit 1 NRC Atomic Energy Act, 10 ONS license to DPR-47 101612033 Operation of ONS CFR50 operate Unit 2 Unit2 NRC Atomic Energy Act, 10 ONS license to DPR-55 7/1912034 Operation of ONS CFR50 operate Unit 3 Unit 3 NRC 10 CFR Part 72, Subpart B Site-specific ISFSI SNM-2503 1/3112050 Operation of a dry storage ISFSI under a site-specific license.

NRC 10 CFR Part 50 ISFSI NIA 711912034 Operation of a dry 10 CFR Part 72, Subpart K storage ISFSI under the ONS units' licenses.

Atlantic Omnibus Low-Level Compacts have the NIA NIA Atlantic Interstate Compact Radioactive Waste authority to limit the LLRW Management Commission Interstate Compact Consent export or import of Compact does not Act (1980 and amended in LLRW out of or into require import or 1985) the compact region. export permits.

FERC Federal Power Act, 18 CFR Keowee-Toxaway 2503-154 August 31 , Operate and maintain 5.1 Hydroelectric 2046 the Keowee-Toxaway Project license Hydroelectric Project (the project provides backup power for ONS and includes the ONS intake dike).

Expiration Agency Authority Requirement Number Date Authorized Activity USACE Article 403 of Keowee- Operating agreement None August 31, Agrees to a new Toxaway Hydroelectric for Duke Energy 2046 critical reservoir Project license projects and elevation for Lake downstream federal Keowee of 790 feet projects above msl.

USFWS Migratory Bird Treaty Act Migratory bird MB000257-0 3/ 1/2022 Authorized to collect, 50 CFR Part 13 50CFR SPUT transport, and 21.27 temporarily possess carcasses and partial remains of migratory birds and emergency relocation of nests of migratory birds other than eagles or threatened ot endangered species.

USDOT 49 CFR 107 Subpart G Registration Reg. No: 6/30/2020 Hazardous materials 052219550045B shipments.

EPA 40 CFR 261 Small quantity SCD043979822 12/31/2019 Hazardous waste hazardous waste generator registration.

generator SCDHEC Coastal Zone Management Consistency NA NA ONS is not located in Act Section 307(c)(3)(A) determination with the SC coastal zone.

the SC Coastal Management Program SCDHEC SC R.61-119 Surface water 37PN001 10/29/2043 Surface water withdrawal permit withdrawal from Lake Keowee.

Expiration Agency Authority Requirement Number Date Authorized Activity SCDHEC South Carolina Coastal plain NA NA ONS is not located in Groundwater Use and groundwater the coastal plain and Reporting Act withdrawals is not required to permit and report groundwater withdrawals.

SCDHEC SC R.61-62 Conditional major CM-1820-0041 12/31 /2027 Operation of auxiliary operating permit, air boiler.

sources SCDHEC SC R.61-79.262.13 SQG annual DHEC 2701 Annual Annual SQG declaration form submittal declaration.

SCDHEC SC 61-107.19 Class 2 landfill post- 373303-1601 1/11/2038 Post-closure permit closure permit for closed and capped onsite landfill.

SCDHEC 40 CFR 280; SC R. 61-92 UST registration for Registration 7/31/2019 Operation of US Ts.

SC regulated tanks numbers:

11174, 11843 SCDHEC Clean Water Act, Section NPDES permit SC0000515 9/30/2013 Discharges of 402; SC R. 61-9 (due to wastewater to surface submittal of a water.

timely renewal application the permit is administratively extended and remams m effect until a final permit decision is

Expiration Agency Authority Requirement Number Date Authorized Activity made on the renewal)

SCDHEC SC R. 61-9 NPDES general SCG160000 3/31/2021 Discharges to surface permit for Facility waters from pesticide discharges from Coverage No. application.

pesticide application SCG16006 SCDHEC 40 CFR122 .26; SC R . 61-9 General NPDES SCRl00000 12/31/2017 Discharge of permit for (this general stormwater; ONS files construction permit notices of intent for activities continues in construction activities effect until the under the general subsequent construction general permit stormwater permit.

becomes effective)

SCDHEC SC R. 61-9 General NPDES SCR000000 9/30/2021 Discharge of permit for industrial Facility industrial stormwater activities Coverage No. permit.

SCR000074 SCDHEC SC R. 61 -9.610 Operation of a Permit NA Notification of satellite sewer Coverage No. satellite sewer owner.

system SSS000909 SCDNR Migratory Bird Treaty Act Migratory bird MD-4-20 12/21/2020 State authorization depredation permit associated with the USFWS MB000257-0 permit.

Expiration Agency Authority Requirement Number Date Authorized Activity SCDHEC SC R. 61-81 Environmental Certification 3/3/2021 Certifies testing for laboratory No. 37756001 pH, residual chlorine, certification and temperature.

SCDHEC SC R. 61 -81 Environmental Certification 3/5/2021 Certifies testing for laboratory No. 37761001 pH.

certification SCDHEC SC R.61-105 Infectious waste Registration No. 7/31 /2022 Registers ONS as a registration SC37-0051G generator of infectious waste.

SCDHEC SC R. 61-86.1 Group license for Group License Various by Licenses individuals asbestos abatement No. 8045 licensed for asbestos activities individuals' abatement activities training dates onsite.

SCDHEC SC Radioactive Waste SC radioactive 0020-39-19-X 12/31/2019 Transport of Transportation and Disposal waste transport radioactive waste Act, SC R. 61-83 permit within South Carolina.

Tennessee TDEC Rule Chapter 0400- Radioactive waste T-SC007-Ll 9 12/31/2019 Shipment of Department of 20-10-.31 & .32 license-for-delivery radioactive material to Environmental a licensed Control disposal/processing (TDEC) facility within Tennessee.

OJRSA SC R. 61-9 Significant industrial IW-000003 3/31 /2024 Discharge of wastewater industrial wastewater discharge permit into the Coneross Creek wastewater treatment facility.

Table 2. Environmental Authorizations and Consultations for ONS License Renewal Agency Authority Requirement Remarks NRC Atomic Energy Act [42 License renewal Applicant for federal license must submit an ER in USC 2011 et seq.] support of license renewal application.

USFWS Endangered Species Act Consultation Requires federal agency issuing a license to consult Section 7 [16 USC 1636] with the USFWS, regarding federally protected species.

SCDNR 10 CFR 51, Subpart A, Consultation State-level agency for South Carolina protected Appendix B, Table B-1 , species to assist in identifying adverse impacts to Special Status Species and protected species resulting from continued operation Habitat of the facility.

South Carolina National Historic Consultation Requires federal agency issuing a license to consider Department of Archives Preservation Act Section cultural impacts and consult with SHPO and/or tribal and History 106 historic preservation officer.

Eastern Band of National Historic Consultation Requires federal agency issuing a license to consider Cherokee Indians Preservation Act Section cultural impacts and consult with SHPO and/or tribal 110 historic preservation officer.

United Keetoowah Band National Historic Consultation Requires federal agency issuing a license to consider of Cherokee Indians in Preservation Act Section cultural impacts and consult with SHPO and/or tribal Oklahoma 110 historic preservation officer.

Cherokee Nation National Historic Consultation Requires federal agency issuing a license to consider Preservation Act Section cultural impacts and consult with SHPO and/or tribal 110 historic preservation officer.

Catawba Indian Nation National Historic Consultation Requires federal agency issuing a license to consider Preservation Act Section cultural impacts and consult with SHPO and/or tribal 110 historic preservation officer.

SCDHEC 10 CFR 51 , Subpart A; Consultation The applicant should consult the State agency Regulatory Guide 4.2, Rev. responsible for environmental health regarding the 1, Supplement 1, Section 3.9 potential existence and concentration of

Agency Authority Requirement Remarks microorganisms in the receiving waters for plant cooling water discharge.