NG-97-1143, Notifies That DAEC Has Completed Operator Training,Taken Credit for Revised Fire Hazards Anaysis & Removed Compensatory Measures

From kanterella
Revision as of 10:30, 12 December 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notifies That DAEC Has Completed Operator Training,Taken Credit for Revised Fire Hazards Anaysis & Removed Compensatory Measures
ML20141H272
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/15/1997
From: Peveler K
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: Collins S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NG-97-1143, NUDOCS 9707220194
Download: ML20141H272 (2)


Text

y 3 Duane Amold Energy Center i

Palo. IA 52324 Telephone 319 8517611 Fax 319 8517611 UTILITIES NG-97-1143 July 15,1997 Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation i U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Subject:

Duane Arnold Energy Center .

Docket No: 50-331 I Op. License No: DPR-49 l Revised Fire Hazards Analysis i

References:

1) Letter, Franz (IES) to Miraglia (NRC), dated October 17,1996,

" Withdrawal of Request for Exemption from 10CFR50, Appendix R"

2) Letter, Peveler (IES) to Miraglia (NRC), dated January 3,1997,

" Withdrawal of Request for Exemption from 10CFR50, Appendix R" File: A-101a, P-72a

Dear Mr. Collins:

In Reference 1, we committed to completing plant modifications necessary to bring fire barrier installation 16F-1 and its associated fire zone into compliance with 10CFR50, Appendix R, Section III.G.2.a by July 31,1997. Those modificatione have been completed and compliance of fire barrier 16F-1 has been achieved. This completes Schedule item 14 of Reference 1 as well as all analyses and modifications necessary to eliminate Duane Arnold Energy Center (DAEC) reliance on Thermo-Lag fire barrier material.

In Reference 2, we stated that DAEC would not take credit for the revised fire hazards analysis and completed plant modifications until completion of operator training. We further stated that all compensatory measures in place for Generic Letter 92-08 would l remain in place until completion of operator training on the new analysis. The d purpose of this letter is to notify you that DAEC has completed this operator training, taken credit for the revised fire hazards analysis, and removed compensatory measures. This completes Schedule item 15 of Reference 2. Of0 9707220194 970715

^ " "

5" EPS

  • lllllllllllllH[IllJllljilll}llllll

} (t 0 An IES Industries Company

.g-.-... - . .. . . . . . . - - . - - . .

l 3

' Mr. Samuel J. Collins July 15,1997

. NG-97 1143

. Page 2 Should you have any questions regarding this matter, please contact this office.

Sincerely,

[ sM i Kenneth E. Peveler Manager, Regulatory Performance i

cc: L. B. Swenzinski i D. Wilson l J. Franz I G. Kelly (NRC-NRR)

)

A. B. Beach (Region III) i NRC Resident Office Docu l

)