_
_ _ _ _ - _ - - - - - - -- ------ -+ - - - - - - -
.
,
"#
UNf12D STATES
/p.a aseg**g '
NUCLEAR REGULATORY COMMIS0lON f -
, REGION ill E
e-
]r 801 WARRENVILLE noAD LISLE. ILLINOIS 605324351
\..... January 20, 1998
l EA 98-006 !
Mr. Oliver D. Kingsley PresLient, Nm: lear Generation Group Commonweshh Edison Company ,
ATTN: Regulatory Services .
^
Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove,IL $0515 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NO. 50-295/97019(DRP);
50-304/g7019(DRP)) ,
Dear Mr. K'ingsley:
This will acknowledge receipt of your letter dated November 3,1997, in response to our letter dated September 30,1997, transmitting a Notice of Violation associated with Inspection Report No. 50 295/97019(DRP); 50-304/07019(DRP) for the Zion Station. We have reviewed your corrective actions and hava no further questions at this time. These corrective actions will be examined during future inspections, in your response, you denied that Violation 5, involving a quality control cleanliness inspection during emergen;y diesel generator starting air check salve installation, was a violatir ; of NRC requirements. Specifically, you maintained that the quality control cleanliness inspection was performed correctly and that the manufacturer's material specification tag had become lodged between the check valve body and air system pipe flange during final assembly after that witness point had been satisfied. We reviewed pertinent documentation and interviewed personnel associated with this activity. Information provided supports your characterization of this occurrence and sve are, therefore, rescinding Violation 5.
'
We also noted that your response to the violation included corrective actions to improve the staffs understanding and implementation of management's expectations in the areas of work practices anel quality control inspector performance. The corrective actions included briefings of
[
the maintenance staff which stressed the *Stop, Think, Act, and Review" concept and the need
- for a second verification of foreign material exclusion principles. In addition, the quality control 9901270059 990120 ,
,
hDR ADOCK 0 295 fr h f. l }
. _
wyw
_ -- _
p.- - - . . .- . . _ . .
..
. . . . _ - . _ . _ . - - - _ - - - . . . - -
,
- '
,
!
<
O. Kingsley 2
!
i department increased the job scope for quality control inspectors to include both quality control i witness points and the surveillance of job activities These corrective actions appear to be appropriate and we have no further questions at this time. i corely,
, ) .
i A Bill Beach L Rpglonal Administretor ,
Docket Nc. 50 295 Docket Nc. 50 304
,
cc: M. Wallace, Nuclear Services ,
Senior Vice President
G. Stanley, PWR Vice President J. Pony, BWR Vice President '
D. Farrar, Regulatory Services Manager 1. Johnson, Licensing Director DCD - Licensing J. Brons, Site Vice President R. Starkey, Plant Ger. oral Manager R. Godley, Regulatory Assurance
!. Supervisor ,
Richard Hubbard fJethan Schloss, Economist Office of the Attomey General Mayor, City of Zion .-
Stato Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce
- Commission
,
,
'
(. .l l
'
.. ,. . . . ._. __ _ . . - -
e
'
'
January 20, 1998 G Kingsley 2 department increased the job scope for quality control inspectors to include both quality control witness points and the surveillance of job activities. These corrective actions appear to be appropriate and we have no further questions at this time
Sincerely,
/s/ James L Caldwell for A. Bill Beach Regional Administrator Docket No. 50-295 Docket No.50-004 cc: M. Wallace, Nuclear Services Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager I. Johnson, Licensing Director DCD - Licensing J. Brons, Site Vice President R. Starkey, Plant General Manager R. Godley, Regulatcry Assurance Supervisor Richard Hubbard Nathan Schloss, Economist Office of the Attomey General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission Distribution:
Docket File DRP PUBLIC IE-01 TSS A.Beadi DRS (2)
Deputy RA RlliPRR Rlli Enf. Coord. RAC1 (E Mail)
SRI Z'on CAA1 (E Mail)
Project Mgr., NRR DOCDESK (E-Mail)
J. Lieberman, OE R. Zimmerman, NRR J. Goldberg, OGC DOCUMENT NAME: 0.Zf0*f tlO97019.TKU SEE PREVIOUS CONCURRENCES
, ws..t. in ih. b.m c copy withevi .it. chm.nt/.ne6..ue. t . c py with ett. chm.nt>.ncs..ue.
gy,dv. . ..py .: w 4 .
OFFICE Rlli ltf Rill .
O Rlli ( l Rill 8til Jl / l NAME DHills:et bet' KO'BriehM3 HClaytofiM'// GGrant (RV Kb(Mi DATE 01/1998 01/f/98' ~ 01//R98kf, 01W198 l\ () 641/M8 OFFICIAL RECORD COPY g $se yB 'If,xM ,
ICM k l dfh+4]a.
we na kwtat c w ewr m %+ j