ML20214S445
Jump to navigation
Jump to search
| ML20214S445 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 09/24/1986 |
| From: | Grimes B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Carey J DUQUESNE LIGHT CO. |
| Shared Package | |
| ML20214S447 | List: |
| References | |
| TAC-62939, NUDOCS 8609290495 | |
| Download: ML20214S445 (7) | |
See also: IR 05000412/1986023
Text
{{#Wiki_filter:._ - _ __ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
t MQu
-
+ '
kg UNITED STATES
[[. ~ NUCLEAR REGULATORY COMMISSION
W ASHINGTON, D. C. 20555
[
N*v /
****
SEP 24 1906
:
Docket No. 50-412
Mr. J. J. Carey, Vice President
Duquesne Light Company
Nuclear Group
P. O. Box 4
Shippingport, PA 15077
Dear Mr. Carey:
SUBJECT:
BEAVER VALLEY POWER STATION UNIT N0. 2 (BV-2) ENGINEERING l
ASSURANCE (EA) PROGRAM INSPECTION REPORT 50-412/86-23
,
This letter conveys the results of the inspection of the Duquesne Light Company
(DLC) Technical Audits (Ref. Audit No. 50, Hazard Analysis Program dated April 7,
1986:
Audit No. 44, Fuel Pool Cooling and Cleanup System plus portions of the
Fuel Building; dated February 21, 1984, and DLC's design bases Endorsement
Program dated July 20, 1984). The inspection was conducted by the NRC's Office
of Inspection and Enforcement and consultants. The inspection took place at
the offices of Stone and Webster Engineering Corporation (SWEC), Boston,
Massachusetts, from July 28, 1986 to July 30, 1986, and at~the BV-2 site,
Shippingport, Pennsylvania, from August 4, 1986 to August 5, 1986.
For each technical discipline the NRC inspector assessed whether the audit had
been conducted in accordance with the approved review plan and supporting pro-
cedures and whether the audit was being conducted in sufficient technical depth
and detail to be an acceptable mechanism for providing additional assurance that
the design of BV-2 complies with all licensing commitments and regulatory
requirements.
The NRC
technical team
depth finds that
to achieve Technical
program objectives. Audit Nos. 44 and 50 are conducted in s
The team also finds that the DLC's
Design Bases Endorsement Program is a detailed and thorough confirmation of the
incorporation
documents ofproject
into FSAR commitments,
criteria. regulatory requirements and other design
General andreport.
inspection specific comments of the NRC team are provided in the enclosed
Resolution of the items identified in this report will be
8609290495 860924
PDR ADOCK 05000412
G PDR
_
l J. J. Carey -2-
determined by .the NRC team during our final inspection of audit results and
corrective actions currently scheduled for the week of September 22;, 1986.
No reply is necessary. Please contact me or E. Imbro (301-492-9671) if you
have any questions.
Sincerely,
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosures: As stated
cc: see next page
.
.
l
l
. _ _ _ - _ _ _ _ _ _
Mr. J. J. Carey
, Duquesrc Light Company Beaver Valley 2 Pswer Station
.
CC*
Gerald Charnoff, Esq. Mr. R. E. Martin, Manager i
Jay E. Silberg, Esq. Regulatory Affairs
Shaw, Pittman, Potts & Trowbridge Duquesne Light Company :
1800 M Street, N.W. Beaver Valley Two Pro.iect:
Washington, DC 20036 P. O. Box 328
Pittsburgh, Pennsylvania 15077
'
Mr. C. W. Ewing, Quality Assurance Zori Ferkin
Manager Assistant Counsel
Quality Assurance Department Governor Energy Council
Duquesne Light Company 1625 N. Front Street <
'
P. O. Box 186 Harrisburg, PA 15105
Shippingport, Pennsylvania 15077 .
-
Director, Pennsylvania Emergency
Management Agency
Room B-151
Transportation & Safety Building
Harrisburg, Pennsylvania 17120
'
Mr. T. J. Lex Mr. Thomas Gerusky
Westinghouse Electric Corporation Bureau of Radiation Protection J
.
.
Power Systems PA Department of Environmental
P. O. Box 355 Resources
Pittsburgh, Pennsylvania 15230 P. O. Box 2063 i
Harrisburg, Pennsylvania 17120
Mr. P. RaySircar
Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor
P. O. Box 2325 Duquesne Light Company
Boston, Massachusetts 02107 Post Office Box 4
Shippingport, Pennsylvania 15077
Mr. W. Troskoski
U. S. NRC John A. Lee, Esq.
P. O. 181 Duquesne Light Company
Shippingport, Pennsylvania 15077 10xford Centre >
301 Grant Street
Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15779
U. S. NRC, Region I
631 Park Avenue
King of Prussia, Pennsylvania 15229
l
.
"
.
*
.
_ _ _ _ _ _ _ _ _ _ _
,
'
pnuo
,o UNITED STATES
g y
. ( j' gg NUCLEAR REGULATORY COMMISSION
5 W ASHINGTON, D. C. 20555
.s
hs' %,# f., ,gj
os
%*** SEP 24 1986
:
Docket No. 50-412
Mr. J. J. Carey, Vice President
Duquesne Light Company
Nuclear Group
P. O. Box 4
Shippingport, PA 15077
Dear Mr. Carey:
SUBJECT: BEAVER VALLEY POWER STATION UNIT NO. 2 (BV-2) ENGINEERING
ASSURANCE (EA) PROGRAM INSPECTION REPORT 50-412/86-23
, This letter conveys the results of the inspection of the Duquesne Light Company
(DLC) Technical Audits (Ref. Audit No. 50, Hazard Analysis Program dated April 7,
1986: Audit No. 44, Fuel Pool Cooling and Cleanup System plus portions of the
Fuel Building; dated February 21, 1984, and DLC's design bases Endorsement
Program dated July 20, 1984). The inspection was conducted by the NRC's Office
of Inspection and Enforcement and consultants. The inspection took place at
the offices of Stone and Webster Engineering Corporation (SWEC), Boston,
Massachusetts, from July 28, 1986 to July 30, 1986, and at the BV-2 site,
Shippingport, Pennsylvania, from August 4, 1986 to August 5, 1986.
For each technical discipline the NRC inspector assessed whether the audit had
been conducted in accordance with the approved review plan and supporting pro-
cedures and whether the audit was being conducted in sufficient technical depth
and detail to be an acceptable mechanism for providing additional assurance that
the design of BV-2 complies with all licensing commitments and regulatory
requirements.
The NRC team finds that Technical Audit Nos. 44 and 50 are conducted in sufficient
technical depth to achieve program objectives. The team also finds that the DLC's
Design Bases Endorsement Program is a detailed and thorough confirmation of the
incorporation of FSAR commitments, regulatory requirements and other design
documents into project criteria.
General and specific comments of the NRC team are provided in the enclosed
inspection report. Resolution of the items identified in this report will be
. _ ._
l
l
s J. J. Carey -2-
determined by the NRC team during our final inspection of audit results and
corrective actions currently scheduled for the week of September 22, 1986.
No reply is necessary. Please contact me or E. Imbro (301-492-96719 f f you
have any questions.
Sincerely,
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosures: As stated
cc: see next page
-
e
, l l 1
.
'
J. J. Carey -2-
determined by the NRC team during our final inspection of audit results and
corrective actions currently scheduled for the week of September 22, 1986.
No reply is necessary. Please contact me or E. Imbro (30I-492-967F) if you
have any questions.
Sincerely,
Or18itw.1 si6nea Dy
Brian K. Grimes, Director
Division of Quality Assurance, Vendor,
and Technical Training Center Programs
Office of Inspection and Enforcement
Enclosures: As stated
cc: see next page
Distribution
DCS
- PDR
LPDR
DQAVT Reading
QAB Reading
JMTaylor, IE
RWStarostecki, IE
BKGrines, IE
HJMiller, IE
EVInbro, IE
HBWang, IE
PSTan, NRR
DGMcDenald, NRR
LSRubenstein, NRR
LETripp, RI
PKEapen, RI
Team Members
.
.
W f Z~
QAB:D AVT:IE QAB:DQAVT:IE DD:DQAVT:IE : T E
HBWang EVImbro HJMiller im s
09//f/86 09//3 /86 09/jt2/86 9/ 86
r
-
Mr. J. J. Carey
Duquesn'e Light Company
Beaver Valley 2 Power Station
.* i
l
cc: Mr. R. E. Martin, Manager i j
Gerald Charnoff, Esq.
Jay E. Silberg, Esq. Regulatory Affairs
Shaw, Pittman, Potts & Trowbridge Duquesne Light Company '
,
1800 M Street, N.W. Beaver Valley Two Project
Washington, DC 20036 P. O. Box 328
Pittsburgh, Pennsylvania 15077
'
Mr. C. W. Ewing, Quality Assurance Zori Ferkin
Manager Assistant Counsel
Quality Assurance Department Governor Energy Council
Duquesne Light Company 1625 N. Front Street
P. O. Box 186 Harrisburg, PA 15105
Shippingport, Pennsylvania 15077 .
-
Director, Pennsylvania Emergency
Management Agency
Room B-151
Transportation & Safety Building
Harrisburg, Pennsylvania 17120
' Mr. Thomas Gerusky
Mr. T. J. Lex
Westinghouse Electric Corporation Bureau of Radiation Protection
,
' Power Systems PA Department of Environmental
.
P. O. Box 355 Resources
Pittsburgh, Pennsylvania 15230 P. O. Box 2063 i
Harrisburg, Pennsylvania 17120
Mr. P. RaySircar
Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor
P. O. Box 2325 Duquesne Light Company
Boston, Massachusetts 02107 Post Office Box 4
Shippingport, Pennsylvania 15077
Mr. W. Troskoski
U. S. NRC John A. Lee, Esq.
P. O. 181 Duquesne Light Company
Shippingport, Pennsylvania 15077 10xford Centre
301 Grant Street
Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15??9
U. S. NRC, Region I
631 Park Avenue
King of Prussia, Pennsylvania 15229
* l
.
.'
.
}}