Ack Receipt of 890317 Submittal of Rev 2 to Updated FSAR & Annual Safety Evaluation Summary Rept.Listed Design Changes Selected for Insp During Future NRC Site Visit
ML20244C281
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/07/1989
From: Kelly L
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
References
TAC-71235, NUDOCS 8904200126
Download: ML20244C281 (3)


Text

. _ _ .

7

.- April 7,1989

. i Docket 50-341 Mr. B. Ralph Sylvia Group Vice President - Nuclear Operation Detroit Edison Company 6400 N. Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

FERMI-2 NUCLEAR POWER FACILITY, SUBMITTAL OF REVISION 2 TO THE FERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL 10CFR50,59 SAFETY EVALUATION

SUMMARY

REPORT (TAC NO. 71235)

The NRC has 1eceived your March 17, 1989 submittal of Revision 2 to the Updated Final Safety Analysis Report (UFSAR) for Fermi-2 and the annual Safety Evaluation Summary Report.

During a future site visit, NRR staff would be interested in inspecting two of the design changes in the annual Safety Evaluation Summary Report. We would like to inspect the design changes and review the design packages and any calculations associated with the package. The two design changes that we have selected for review are:

(1) Replacement of the Reactor Water Cleanup System Holdup Line (Safety Evaluation No. 86-0255, Implementation Document No. EPP 6671, System No. G33-00); and (2) Relocated Control Rod Drive Minimum Flow Line (Safety Evaluation No. 86-0250, Implementation Document No. EDP d 6736,SystemNo.C1100).

We will work with your staff to select a date for this inspection effort.

This letter completes NPC action on TAC NO. 71235.

Sincerely, LynFKelly, Project Manager Project Directorate 111-1 Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION g pocket Fue NRC & Local PDRs GHolahan MVirgilio i t PShuttleworth LKelly ,

JStang OGC EJordan BGrimes ACRS(10) PD31 Gray File fyI/[()

LA/PD31:DRSP PM/PD31:DRSP U ' )D :DRSP 1 ,

PShuttleworth LKelly/JStang:bw TQua  !

f/g/89 VT % 4/ 5/89 /89 8904200126 890407 DR ADOCK0500ggi

g. t

,. k, UNITED STATES

[ t NUCLEAR REGULATORY COMMISSION

"""fp4W;'iirig E.. .

(.....;j

~ Docket No. 50-341 Mr. B. Ralph Sylvia Senior Vice President -. Nuclear Operation Detroit Edison Company'

'6400 N. Dixie Highway Newport, Michigan 48166

Dear Mr. Sylvia:

SUBJECT:

. FERMI-2 NUCLEAR POWER-FACILITY, SUBMITTAL OF REVISION 2 TO THE FERMI-2 UPDATED FINAL SAFETY ANALYSIS REPORT AND THE ANNUAL-10 CFR 50.59 SAFETY EVALUATION

SUMMARY

REPORT (TAC NO. 71235) i The NRC has received your March 17, 1989 submittal of Revision 2 to the ,

Updated Final Safety Analysis Report (UFSAR) for Femi-? and the annual Safety l Evaluation Summary Report. _

' During a future site visit, NRR staff would be interested in inspecting two of the design changes in the annual Safety Evaluation Summary Report. We would' like to inspect the design' changes and review the design packages and any calculations associated with the package. The two design changes that we have selected for review are:

(1) Replacement of the Reactor Water Cleanup System Holdup Line

-(Safety Evaluation No. 86-0255, Implementation Document No. EPP 6671, System No. G33-00); and (2) Relocated Control Rod Drive Minimum Flow Line (Safety Evaluation No. 86-0250, Implementation Document No. EDP 6736, System No. C1100).

We will work with your staff to relect a date for this inspection effort.

This letter completes NRC action on TAC NO. 71235.

1 Sincerely,

}

Lyn Kelly, Protect Manager Project Directorate III-1 Division of Reactor Projects - III, IV, Y and Special Projects 1

o . . - -.. 7-

,_,. b o' c. , .

1

'Mr.' B. Ralph Sylvia . Fermi-2 Facility p Detroit Edison Company l

l cc:.

Mr. Ronald C. Callen , Ms. 1,ynn Goodman

..Adv.: Planning Review Section Supervisor - Licensing

Michigan Public' Service Commission Detroit Edison Company

-6545 Mercantile Way Fermi Unit 2 P. 0.: Box 30221 6400 North Dixie Highway Lansing, Michigan- 48909 Newport, Michigan '48166

' John Flynn, Esq.

Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 ,

Nuclear Facilities'and Environmental Monitoring Section Office Division of Radiological. Health ,

P. 0. Box.30035 '

Lansing,, Michigan.:48909 Mr. Walt Rogers

-U.S. Nuclear Regulatory Commission Resident Inspector's Office.

6450 W. Dixie Highway Newport, M'chigan 48166-Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan .48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 4

I

- - - - - - - - - _ - - _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ - .