ML20216B673
| ML20216B673 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 05/11/1998 |
| From: | Stewart Bailey NRC (Affiliation Not Assigned) |
| To: | Richards S NRC (Affiliation Not Assigned) |
| References | |
| TAC-M94438, TAC-M94439, NUDOCS 9805180323 | |
| Download: ML20216B673 (2) | |
Text
, 1 May 11,1998 MEMORANDUM TO: Stuart A. Richards, Director Project Directorate 111-2 Division of Reactor Projects lil-IV Office of Nuclear Reactor Regulation FROM: Stewart N. Bailey, Project Manager ORIG. SIGNED BY:
Project Directorate lil-2 Division of Reactor Projects lil-IV Office of Nuclear Reactor Regulation
SUBJECT:
CLOSURE OF TAC NO. M94439, BRAIDWOOD, UNIT 1, STEAM GENERATOR REPLACEMENT TAC Nos. M94438 and M94439 were opened to track miscellaneous technical issues related to the replacement of the steam generators at Byron, Unit 1, and Braidwood, Unit 1, respectively.
The technical issues were resolved, and the actions under TAC Nos. M94438 and M94439 were completed, before the steam generators were replaced on the lead plant, Byron, Unit 1. Byron completed the steam generator replacement outage on March 8,1998. TAC No. M94438 was closed on March 31,1998.
Currently there are no technical issues that require resolution to support the steam generator replacement at Braidwood, Unit 1; therefore, TAC No. M98439 is being closed. New TAC Nos, will be opened, as necessary, if new technicalissues arise.
Docket Nos. STN 50-456 Distribution:
Docket File PUBLIC PDill-2 r/f E. Adensam, EGA1 S. Richards C. Moore S. Bailey M. Jordan, Rlll i
N
,n DOCUMENT NAME: G:\CMNTSP\ BRAID \BR94439.MEM To rsosivs e copy of this docurnent, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy OFFICE PM:PDill-2 l6 LA:PDlll-2 D:PDlll-2 lC NAME SBAILEY 54 CMOOREO/1)H' @ SRICHARDS MF DATE 05/ 7 /98 05/ R /98 05/ ll /98 OFFICIAL RECORD COPY 9805180323 900511
~
PDR ADOCK 05000456 " '
- f ~ """ " ~ m , n m M I
- 4. ,
P PDR M F
nuou e k UNITED STATES g g NUCLEAR REGULATORY COMMISSION
& WAl.HINGTON, D.C. 30666 4 001
,o
'+9***** May 11, 1998 MEMORANDUM TO: Stuart A. Richare:s, Director Prt; act Directorate lil-2 Division of Reactor Projects ill-IV ,
Office of Nuclear Reactor Regulation -
FROM: Stewart N. Bailey, Project Manager Project Directorats 111-2 Division of Reacter Projects lil-IV Office of Nuclear Reactor Regulation
SUBJECT:
CLOSURE OF TAC NO. M94439, BRAIDWOOD, UNIT 1, STEAM GENERATOR REPLACEMENT TAC Nos. M94438 and M94439 were opened to track miscellaneous technical issues related to the replacement of the steam generators at Byron, Unit 1, and Braidwood, Unit 1, respectively.
Tha technical issues were resolved, and the actions under TAC Nos. M94438 and M94439 were completed, before the steam generators were replaced on the lead plant, Byron, Unit 1. Byron completed the steam generator replacement outage on March 8,1998; TAC No. M94438 was closed en March 31,1998.
Currently there are no technical issues that require resolution to support the steam generator
, replacement at Braidwood, Unit 1; therefore, TAC No. M98439 is being closed. New TAC Nos. !
I will be opened, as necessary, if new technical issues arise.
Docket Nos. STN 50-456 l
l
!