ML20236B528
| ML20236B528 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/22/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20236B531 | List: |
| References | |
| NUDOCS 8710260228 | |
| Download: ML20236B528 (2) | |
See also: IR 05000498/1987050
Text
_ _ _ - _ _ _ _ _ _ _ -
e
.i .
OCT 2 21987
-In Reply. Refer To: iE :
a
Dockets: 50-498/87-50 c:
50-499/87-50 R ' 5'2
~
g? E6
> a ?
Houston Lighting &' Power Company "
g
ATTN: J. H. Goldberg c3
Group Vice President, Nuclear o
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. D. R. Carpenter,
H. F. Bundy, G. L. Mad.en, T. Reis, J. P. Clausner, E. Hildebrand,
D. D. Chamberlain, and other members of this office during the period
3 August 3-31, 1987, of activities authorized by NRC Operating License NPF-71 and
Construction Permits.CPPR-128 and CPPR-129 for the South Texas' Project, Units 1
and 2 and to the discussion of our findings with Mr. W. H. Kinsey and other
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included receipt of Unit 1 Operating
License, Unit 1 initial core loading, training program for motor-operated
valves, SAFETEAM review, Unit 1 preoperational test status, standby diesel
generators, rod cluster control assembly drag testing, Unit 2 test program,
radiation alarm response, quality assurance program implementation, and site
tours. During this inspection period, the resident inspectors provided
inspection support to the Region IV Security Inspectors for the completion of
the required NRR Manual Chapter 2513 inspection modules. These efforts are
documented in NRC Inspection Report 50-498;499/87-43. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your z.ctivities were in
violation of NRC requirements. Consequently, you are required to r.espond to
this violation, in writing, ir. accordance'with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these. items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying' Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:SRIff$ RPB/Crsj RSP/0 psf [@ RPB/C45 C:RPB/C59$ C P
DRCarpenter/lrp7TReis EHildebrand HFBundy GLConstable JEG liardo
/o / 7 /87 is/ 7 /8 /0/ 7 /87 /v/ 7 /87 m//s /87
f( / /87
8710260228 871022 9 0\
PDR ADOCK 05000498
G PDR l
f~ _,.
- ,i
.f;
'
,
,
< [d. -
[\ <
w:
A l
Houston Lighting & Power Company -
,2 -
'
e'
jf 7 ,
R'
,
w
'
'
1
Should you have any questions concerning this inspection, wg wi11 be pleased to j
'
discuss them with you. (
Sincerely,
,
i
1
J.OE Gagliardo, Chief
Reactor Projects Branch- ./,
'
Enclosures:
1. Appendix A - Notice of Violation
2. Appendix B - NRC Inspection Report '/,
50-498/87-50
50-499/87-50 /
cc w/ enclosure:
Houston Lighting & Power Company ,
ATTN: M. Wisenberg, Manager
Nuclear Licensing ,
P. O. Box 1700 !
Houston, Texas 77001 ., ,
0 1
7
\ ~
3
Houston Lighting & Power Company -
'
s ' Y _,
ATTN: Gerald E. Vaughn, Vice President <
'
,
Nuclear Operations I !
P. O. Box 1700
Houston, Texas 77001 e
3, i
\ i ;
Texas Radiation Control Program Director ,
{
bcc to DMB (IE01) j
bcc distrib, by RIV:
'
- RPB DRSP
- RRI-0PS R. D. Martin, RA (
- RRI-CONST. *Section Chief (RPB/C) {
- R&SPB * MIS System '
. g(
- RIV File *D. Weiss, RM/ALF g N
- RSTS Operator R, Pirfo, ELD y/_ (
-
j
',
- R. G. Taylor, RPB/C *RS0-
- Project Inspector *R; Hall >, 4
i
- D. Chamberlain *T. Rais J
a .
- J. P. C1ausner: #
_
l
- G. L. Madsen -) ,f '( - 2
i
- w/766 f ;
l
1
l
1
'.+
,. [ ,
-- - - _ _ _ .