| | Start date | Site | Title |
|---|
| ML25258A011 | 18 September 2025 | | AP1000 White Paper for September 18, 2025 ROP Public Meeting |
| IR 05000456/2025010 | 4 September 2025 | Braidwood | Comprehensive Engineering Team Inspection (Ceti) Report 05000456/2025010 and 05000457/2025010 |
| ML25070A077 | 27 June 2025 | | IP 71111.21M Comprehensive Engineering Team Inspection (CETI) |
| ML25136A297 | 16 May 2025 | Surry North Anna | Proposed License Amendment Requests to Update Main Steam Line Break Alternative Source Term Dose Consequences Analyses |
| IR 05000266/2025001 | 13 May 2025 | Point Beach | Integrated Inspection Report 05000266/2025001 and 05000301/2025001 |
| ML25087A128 | 24 April 2025 | Oconee | Issuance of Amendment Nos. 431, 433, 432, Revise Technical Specification 3.7.7 |
| RBG-48323, License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink | 30 December 2024 | River Bend | License Amendment Request to Revise the Licensing Basis and Minimum Basin Water Level for the Ultimate Heat Sink |
| ML24297A130 | 18 December 2024 | Cook | Issuance of Amendment Nos. 364 and 345 Regarding Change to the Technical Specification Requirement for Neutron Flux Instrumentation |
| IR 05000346/2024010 | 6 December 2024 | Davis Besse | Comprehensive Engineering Team Inspection Report 05000346/2024010 |
| ML24318C477 | 8 November 2024 | Fermi 07200071 | Submittal of Revision 25 to the Fermi 2 Updated Final Safety Analysis Report (Ufsar), 10 CFR 50.59 and 10 CFR 72.48 Evaluation Summary Reports, Commitment Management Report, Revisions to the Technical Requirements Manual and the Technical |