IR 05000302/2011502
| ML12069A399 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/05/2012 |
| From: | Bonser B R NRC/RGN-II/DRS/PSB1 |
| To: | Franke J A Progress Energy Florida |
| References | |
| IR-11-502 | |
| Download: ML12069A399 (3) | |
Text
March 5, 2012
Mr. Jon Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO 05000302/2011502
Dear Mr. Franke:
On December 31, 2011, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Crystal River Nuclear Plant. This inspection began on January 1, 2011. Issuance of this letter closes Inspection Report Number 2011502. Inspection activities charged to this report includes conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence.
In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72
cc w/encl.: (See page 2)
March 5, 2012 Mr. Jon Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C)
15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO 05000302/2011502
Dear Mr. Franke:
On December 31, 2011, the NRC staff completed its annual inspection of the Emergency Preparedness Program at the Crystal River Nuclear Plant. This inspection began on January 1, 2011. Issuance of this letter closes Inspection Report Number 2011502. Inspection activities charged to this report includes conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, and, in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence. In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket No.: 50-302 License No.: DPR-72 cc w/encl.: (See page 2) Distribution: C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS OE Mail (email address if applicable) RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource (*) See previous concurrence page X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER: ML12069A399 X SUNSI REVIEW COMPLETE OFFICE RII: DRS RII: DRS RII: DRP SIGNATURE RA/BB For MS RA/BBRA/DR NAME M. SPECK B. BONSERD. RICH DATE 03/05/2012 03/05/201203/05/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\CRYSTAL RIVER EOC LTR 2011.DOCX PROGRESS ENERGY 2 cc w/encl: Kelvin Henderson, General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution Robert J. Duncan II, Vice President Nuclear Operations Progress Energy Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution Terry Hobbs Plant General Manager Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708 Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution R. Alexander Glenn, General Counsel Progress Energy Electronic Mail Distribution Jeffrey R. Swartz Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs Progress Energy Electronic Mail Distribution Thomas Sapporito Consulting Associate Post Office Box 8413 Jupiter, FL 33468 William A. Passetti, Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott, Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley, Senior Counsel Legal Department Progress Energy Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd Crystal River, FL 34428 Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Bryan Koon, Director Florida Division of Emergency Management Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250