ML20199D933
| ML20199D933 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/23/1998 |
| From: | Kansler M VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Paperiello C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20199D937 | List: |
| References | |
| 97-587, TAC-L22113, NUDOCS 9802020056 | |
| Download: ML20199D933 (2) | |
Text
- _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Vinoisi A Ei.ecTRIC ANI) POWER CON 11%NY Ricissunsp, Vinois A 2326:
January 23, 1998 Mr. Carl J. Paperiello, Diractor Serial No.97-587 Office of Nuclear Material Safety and Safeguards NL&OS/MAE RO U. S. Nuclear Regulatory Commission Docket Nos. 72-16 Washington, D. C. 20555 Deai Sir:
VIRGINidLELECTRIC AND POWER COMPANY NORTH ANNA INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
REVISIOh5 TO STAILQ1LEMERGENCY PLAN (TAC NO. LR2113)
Virginia Electric and Power Company's April 14, 1997 letter (Serial No.97-103) committed in item 9-6 to provide the NRC a copy of the revised North Anna Emergency Plan (NAEP). Enclosed is Revision 21 of that plan. Table 4.1 and Appendix 10.11 have been revised to reflect the addition of the ISFSI.
These revisions to the NAEP do not implement actions which decrease the effectiveness of the plan. The NAEP continues to meet the standards of 10 CFR 50.47.
Also enclosed for your informatiori are the Corporate Emergency Response Plan and North Anna Emergency Plan implementing Procedure 1.01, Emergency Manager Controlling Procedure, Revision 30. Item 12 in Tab C of Attachment 1 of this procedure has been added to reflect the ISFSI.
If you have any questions, or require additionalinformation, please contact us.
Very truly yours, 1
M' a . Kansler Vice esident-Nuclear Operations jvF 6 Enclosures Commitments made in this letter:
- 1. None.
9802020056 900123 PDR ADOCK 05000338 F pop h -
)
}- :g cc: US Nuclear Regulatory Commission Region 11 Atlanta Federal Center
. 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 U. S. Nuclear Regulatory Commission Attention:" Document Control Desk Weahington, D. C. 20555 -
Mr. M. J. Morgan (Without Enclosure)
NRC Senior Resident inspector North Anna Power Station Mr. J. W Shea Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission, Mail Stop 0-6-G-22 Washington, D. C. 20555 9
. - - - _ _ _ _ - _ _ _ _ _ _ _