ML20154E762
| ML20154E762 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon, 05000000 |
| Issue date: | 10/10/1969 |
| From: | Andrea Johnson US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Spencer G PACIFIC GAS & ELECTRIC CO. |
| Shared Package | |
| ML20154C370 | List:
|
| References | |
| FOIA-88-156 NUDOCS 8805200315 | |
| Download: ML20154E762 (1) | |
Text
' -
\, -
(
e (
fh9 '$ UNITED STATES 1 .
3 j.
y i
ATOMIC ENERGY COMMISSION g+ civistos or coMPM ANCE
=casow v
- fa allt SANCMort WAY Branstry, C AuroMNI A 94704 ts=> m stat E.rt, M t October 10, 1969 C. S. Spencer, Senior Reactor Inspector Region V, Division of Compliance DIABLO CANYON UNIT NO.1, PACIFIC CAS AND El.ECTRIC COMPANY DOCKET NO. 50-275 The attached report contains the details of a recent visit to PG&E's home offices on September 16, 1969. The purpose of the visit was to review QC procedures concerning construction of the containment building and other Class I civil structures.
The reviewed procedures, if properly implemented, should provide us with the reasonable assurance necessary to conclude that the containment building will be constructed in conformance with the requirements contained in the PSAR.
f ht. ' f.'ovs W A.D..![hnson i
Reac tot / Ins pec tor l I
i i
1 1 0
i i
l 8805200315 000510 PDR FOIA J
MCMILL ANBO-156 PDR .
- w a #
i