ML20135H721
| ML20135H721 | |
| Person / Time | |
|---|---|
| Site: | Harris, River Bend |
| Issue date: | 09/17/1985 |
| From: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20135H722 | List: |
| References | |
| NUDOCS 8509240161 | |
| Download: ML20135H721 (2) | |
See also: IR 05000458/1985029
Text
. _ _ _ _ ~ .
'
,
.
SEP 171985
In Reply Refer To:~
Docket: 50-458/85-29
Gulf States Utilities
ATTN: William J. Cahill, Jr.
Senior Vice President-
River Bend Nuclear Group
. P. O. Box 2951
Beaumont, Texas 77704
Gentlemen:
This refers to the-inspection conducted by Messrs. L. E. Ellershaw and
D. P. Tomlinson of this office during the period April 1-July 9,1985, of
activities authorized by NRC Construction Permit CPPR-145 for River Bend Unit 1,
and to the discussion of our findings with you and other members of your staff
at the conclusion of the inspection.
Areas examined during the inspection included safety-related heating, ventilating,
and air conditioning systems, and verification of as-built structural steel
connections. Within these areas, the inspection consisted of selective
examination.of procedures and representative records, interviews with
personnel, and observations by the inspectors. These findings are documented
in the enclosed inspection report.
During this inspection it.was found that' certain activities under your license
appeared to be in violation of NRC requirements. The one violation reported in 1
Paragraph 2 of the enclosed inspection report was identified as a . Severity
Level. IV Violation and forwarded to you by our letter dated August 2,1984.
During this inspection, it was determined that corrective actions had been.-
c_ompleted on this violation, therefore, this letter does not require further
written response.
.
,
.,-
RIV:RSB - RP RSB/0Sh RPB/RRSA 'RS RPB
LEllershawflw DPToMlinson DMHunnicutt .JJAudon DRH ter EHJohnson
q/)\/85 dl/tt/85 q/ll/85 - g @/85 - Q /g85 j/(L/85
0
8509240161 85091748 Q
\.
ADOCK O
{DR
,
. . - .. -
d
J
- . .-
,
.
-2-
1
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you,
i
Sincerely,
-
Crrginal signed By.
E. H. Johnson
E. H.. Johnson, Chief-
l Reactor Projects Branch
Enclosures: .
? l' ' Appendix A - Notice of Violation
2. Appendix B - NRC Inspection Report .
- '
~
'
50-458/85-29
.cc w/ enclosures:
Gulf States Utilities .
ATTN: J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
P. O. Box 2951 .
Beaumont, Texas 77704
Louisiana State University, _.
Government Documents Department
Louisiana' Rad'iat. ion Control Program Director-
! bec to DMB~(IE01) ,
.
bcc distrib. by RIV:
"
- RP8 R. P. Denise, DRSP-
- .*Resident Inspector R. D. Martin, RA
' *Section Chief (RP8/A) *D.. Weiss, LFMB (AR-2015) -
- MIS. System RSB
- RSTS Operator L. Ellershaw
- EP&RPB D. Tomlinson
- RIV File
.
- w/766
2- .
r
.
T
'
I
_
,. - - , , - - . - , , , , , , , - , , ,, . .(-. -n a,. ,, , ---