ML20069D942

From kanterella
Revision as of 22:30, 7 August 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Rev 7 to Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20069D942
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/28/1983
From: Sinclair J
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
FVY-83-7, GL-82-39, VYV-83-7, NUDOCS 8303210129
Download: ML20069D942 (2)


Text

o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 FVY 83-7 y,

g g-ENGINEERING OFFICE 1671 WORCESTER ROAD January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701

  • TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention: Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t : Revision 7 to the Vermont Yankee Physical Security Plan

(^')

V

Dear Sir:

This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.

We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.

Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.

Included with each copy of the change is a Change Transmittal Form.

Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan. In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.

8303210129 830128 PDR ADOCK 05000271 F PDR i

Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I ^ SAFEGUARDS INFORMATION Document as Decontrelled I

i

'O

  • Sool I 5- fN 7 1-wjras.ce.ards

..a ..,,a a a . m e u....m., ua. -

m 1

7s.o., + 2a he< 7 Yo ^!a n / M

United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))

We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.

Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION

. e m .

b/

ames. B. Sinclair Licensing Engineer JBS/dd

Enclosures:

1. Attachment A
2. Revision 7 to Vermont Yankee Physical Security Plan O

i l

l Document Tt .itted When Separated from l i

[J 1  !!crewith Cont is SAFEGUARDS INFO. ' ATION Enclosures, Handle This Document as Decontrolled

- - - .-.