ML20069D942
| ML20069D942 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 01/28/1983 |
| From: | Sinclair J VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| FVY-83-7, GL-82-39, VYV-83-7, NUDOCS 8303210129 | |
| Download: ML20069D942 (2) | |
Text
o VERMONT YANKEE NUCLEAR POWER CORPORATION VYV 83-7 2.C.2.1 RD 5. Box 169, Ferry Road, Brattleboro, VT 05301 FVY 83-7 y,
g g-ENGINEERING OFFICE 1671 WORCESTER ROAD January 28, 1983 FRAMINGHAM, MASSACHUSETTS 01701
- TEL EPHONE 617-872-8100 United F.ates Nuclear Regulatory Commission Wa shington, D. C. 20555 Attention: Office of Nuclear Reactor Regulation Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
References:
(a) License No. DPR-28 (Docket No. 50-271)
(b) Letter, USNRC to VYNPC, Generic Letter 82-39, dated December 22, 1982 Subj ec t : Revision 7 to the Vermont Yankee Physical Security Plan
(^')
V
Dear Sir:
This letter provides Revision 7 to the Vermont Yankee Physical Security Plan which makes several changes as explained in Attachment A.
We have determined that this change does not result in a decrease of the ef fectiveness of the Plan, and therefore, it is forwarded for your information and use.
Both the Security Plan and Attachment A are considered Safeguards Information and as such, shall be withheld from public disclosure pursuant to 10CFR73.21.
Included with each copy of the change is a Change Transmittal Form.
Please insure that the forms are completed and returned to us as required by Section 13.8 of the Plan. In addition, since we are sending a sixth copy (3E) for the first time as required by Ref erence (b), please insure tha t the custody form at tached to copy 3E is returned.
8303210129 830128 PDR ADOCK 05000271 F PDR i
Document Transmitted When Separated f rom Herewith Contains Enclosures, Handle This I ^ SAFEGUARDS INFORMATION Document as Decontrelled I
i
'O
- Sool I 5- fN 7 1-wjras.ce.ards
..a ..,,a a a . m e u....m., ua. -
m 1
7s.o., + 2a he< 7 Yo ^!a n / M
United States Nuclear Regulatory Commission January 28, 1983 Attentipn: Mr. Domenic B. Vassallo Page 2 I'x,))
We trust this information is adequate; botiever, should you have any questions, please contact !!r. Warren P. Murphy, Vice President and Manager of Operations, at our Brattleboro, Vermont offices.
Very truly yours, VERIONT YANKEE NUCLEAR POWER CORPORATION
. e m .
b/
ames. B. Sinclair Licensing Engineer JBS/dd
Enclosures:
- 1. Attachment A
- 2. Revision 7 to Vermont Yankee Physical Security Plan O
i l
l Document Tt .itted When Separated from l i
[J 1 !!crewith Cont is SAFEGUARDS INFO. ' ATION Enclosures, Handle This Document as Decontrolled
- - - .-.