PNO-III-97-049, on 970505,two Level Measuring Gauges,Each Containing Sealed 100 Mci Am-241 Source Had Been Missing. Gauges Part of Packaging Line,Discontinued & Scheduled for Removal.Licensee Initiated Search

From kanterella
Revision as of 00:50, 22 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
PNO-III-97-049:on 970505,two Level Measuring Gauges,Each Containing Sealed 100 Mci Am-241 Source Had Been Missing. Gauges Part of Packaging Line,Discontinued & Scheduled for Removal.Licensee Initiated Search
ML20141E128
Person / Time
Site: 03014029
Issue date: 05/20/1997
From: Hays B, Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
References
PNO-III-97-049, PNO-III-97-49, NUDOCS 9705200336
Download: ML20141E128 (1)


- - - -. . . - - ..

. f.o e

f-g-.

May-20, 1997 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PN0-III-97-049 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without-verification or evaluation. and is basically all that is known by Region III staff (Lisle. Illinois) on this date. >

Facility Licensee Emergency Classification ANHEUSER-BUSCH, INC. Notification of Unusual Event Anheuser-Busch, Inc. Alert St. Louis, Missouri Site Area Emergency p__ / yp33 License No: GENERAL LICN General Emergency X Not Applicable

Subject:

MISSING AMERICIUM-241 SOURCE On May 16, 1997, the licensee's consultant notified the NRC that two level measuring gauges, each containing a sealed 100 millicuries (3.7 Gbg) americium-241 source, had been missing since a) proximately May 5, 1997. -The gauges were part of a packaging line whic1 had been i

discontinued and was scheduled for removal.

On May 16, 1997, the licensee's Radiation Safety Officer discovered the [

.' gauges missing when he went to the packaging line to verify that they were still in place. The licensee initiated a search and contacted a

" health physics company as a consultant to assist in the recovery efforts.  ;

The consultants were able to identify that Rimco, a local metal scrap yard used by the licensee, was a possible location for the missing gauges. A search at the scrap yard resulted in finding one of the missing gauges. The gauge housing was found seperated from the source housing.

The source housing was not damaged. The gauge housing of the second missing gauge was found but the radioactive source was missing. The licensee is continuing to search for the one missing americium- 241 i source. >

An NRC Region III (Chicago) inspector was dispatched to the site on May 16, 1997, to review the circumstances of the missing gauges. The inspector will also be at the licensee's facility during the week of May >

19, 1997, to continue the monitoring of the licensee's recovery actions.

The State of Missouri and the NRC Office of Nuclear Material Safety and  :

Safeguards has been notified. The information is this preliminary notification has been reviewed with licensee management. .

The licensee notified the NRC Operations Center of this event at 4:00 p.m. (CDT) on May 16. 1997. This information is current as of 12:00 pm u (CDT) on May 19. 1997. j i

Contact:

B0B HAYS MONTE PHILLIPS (630)829-9819 (630)829-9807-  !