IR 05000341/2011007
| ML12065A127 | |
| Person / Time | |
|---|---|
| Site: | Fermi, 07200071 |
| Issue date: | 03/05/2012 |
| From: | Cameron J L NRC/RGN-III/DRP/B6 |
| To: | Davis J M Detroit Edison, Co |
| References | |
| IR-11-007 | |
| Download: ML12065A127 (6) | |
Text
March 5, 2012
Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166
SUBJECT: ANNUAL ASSESSMENT LETTER FOR FERMI NUCLEAR POWER PLANT UNIT 2 (REPORT 05000341/2011007)
Dear Mr. Davis:
On February 15, 2012, the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan. The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. We also plan on performing special and infrequently performed inspections: Temporary Instruction (TI) 2515/177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems," TI 2515/182 Phase I, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," Inspection Procedure (IP) 60854.1, "Preoperational Testing of Independent Spent Fuel Storage Installation (ISFSI) at Operating Plants," IP 60855.1, "Operation of an ISFSI at Operating Plants," IP 92709, "Licensee Strike Contingency Plans," IP 71111.17, "Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications," IP 71111.21, "Component Design Basis Inspection," and IP 71114.01, "Exercise Evaluation." In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,/RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket No. 50-341 and 072-071 License No. NPF-43
Enclosure:
Fermi 2 Inspection/Activity Plan cc w/encl: Distribution via ListServ Page 1 of 2Planned DatesStart EndInspection ActivityTitleNo. of Staffon SiteFermiInspection / Activity Plan01/01/2012-06/30/2013BI MODS-TRIENNIAL PERM MODS / 50.593IPEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications7111117T01/16/201202/03/2012TI-182-TI-2515/182 PHASE I - BURIED PIPING1IPReview of the Implementation of the Industry Initiative to Control Degradation of Underground Piping2515/18202/13/201202/15/2012BI RP-RADIATION PROTECTION BASELINE INSPECTION2IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/13/201202/17/2012IPRadiological Environmental Monitoring Program71124.0702/13/201202/17/2012OL PREP-FERMI 2 INIT PREP 02/20123OL - INITIAL EXAM - 2012 MAR - FERMW9023002/27/201203/02/2012ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT2IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.103/01/201205/31/2012IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/01/201207/31/2012OL EXAM-FERMI 2 INITIAL EXAM - 03/20123OL - INITIAL EXAM - 2012 MAR - FERMW9023003/19/201203/23/2012BI ISI-INSERVICE INSPECTION1IPInservice Inspection Activities - BWR7111108G03/24/201204/12/2012BI RP-RADIATION PROTECTION BASELINE INSPECTION2IPRadiological Hazard Assessment and Exposure Controls71124.0104/02/201204/06/2012INSP-OPESS FY2007-03 CRANE & HEAVY LIFT INSP1IPRefueling and Other Outage Activities711112005/07/201205/25/2012TI-177-TI-2515/177 - GAS VOIDING IN ECCS PIPING1IPManaging Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System2515/17705/21/201206/08/2012BI EPX-EP EXERCISE INSPECTION / PI VERIFICATION2IPExercise Evaluation711140108/20/201208/24/2012IPPerformance Indicator Verification7115108/20/201208/24/2012BI RP-RADIATION PROTECTION BASELINE INSPECTION2IPOccupational ALARA Planning and Controls71124.0209/10/201209/14/2012IPReactor Coolant System Activity71151-BI0109/10/201209/14/2012IPOccupational Exposure Control Effectiveness71151-OR0109/10/201209/14/2012IPRETS/ODCM Radiological Effluent71151-PR0109/10/201209/14/2012BI OLRQ-REQUALIFICATION PROGRAM INSPECTION1IPLicensed Operator Requalification Program - Annual Review7111111A10/01/201210/05/2012 Page 2 of 2Planned DatesStart EndInspection ActivityTitleNo. of Staffon SiteFermiInspection / Activity Plan01/01/2012-06/30/2013ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT2IPPreoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants60854.102/01/201304/30/2013BI RP-RADIATION PROTECTION BASELINE INSPECTION1IPRadiological Hazard Assessment and Exposure Controls71124.0101/28/201302/01/2013INSP-BUILDING STRUCTURE MODS TO SUPPORT ISFSI2IPPlant Modifications711111802/11/201304/19/2013BI HS-TRIENNIAL HEAT SINK INSPECTION2IPHeat Sink Performance7111107T03/18/201303/22/2013BI RP-RADIATION PROTECTION BASELINE INSPECTION1IPRadiation Monitoring Instrumentation71124.0503/25/201303/29/2013ISFSI-ISFSI INSPECTION - SCHEDULE DEPENDENT1IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.105/01/201308/31/2013STRIKE-STRIKE CONTINGENCY - OP/MAINT/RP2IPLicensee Strike Contingency Plans9270905/06/201306/06/2013BI EPR-EP ROUTINE INSPECTION / PI VERIFICATION2IPAlert and Notification System Testing711140206/24/201306/28/2013IPEmergency Preparedness Organization Staffing and Augmentation System711140306/24/201306/28/2013IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140506/24/201306/28/2013IPPerformance Indicator Verification7115106/24/201306/28/2013BI RP-RADIATION PROTECTION BASELINE INSPECTION1IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/10/201306/14/2013IPOccupational Dose Assessment71124.0406/10/201306/14/2013