ML20127K398
| ML20127K398 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/22/1993 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20127K403 | List: |
| References | |
| NUDOCS 9301260114 | |
| Download: ML20127K398 (5) | |
See also: IR 05000445/1993001
Text
9
v. t>* *l oo 044f f D ST ATLS
,,/ ?g NUCLCAR REGULATORY COMMISSION
,
[ ' ),4 f j ne olON IV j
$ F u t nv AN PL AZA .3nlVf, fiUITE 400
AH LINGT ON, H X A5 760116064 I
5, ~.
[
- "*
JAN 2 21993
,
Dockets: 50-445
50-446
License: NPF-87
Construction Permit: CPPR-127
10 flectric ;
AT1N: W. J. Cahill, Jr., Group Vice President
Nuclear Engineering and Operations
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
Gentlemen:
SUBJECT: NRC INSPECTION REPORT 50-445/93 01; 50-446/93-01
This refers to the inspection conducted by Messrs. P. Wagner and L. E11ershaw
of this office from January 4-8, 1993. The inspection included a review of
activities authorized for your Comanche Peak Steam Electric Station, Units 1
and 2, facility. At the conclusion of the inspection, the findings were
discussed with those members of your staff identified in the enclosed report..
Areas examined during this inspection included the corrective' action and self-
assessment programs. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and review of completed activities. >
Within the scope of this inspection, no violations orLdeviations were >
identified.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy
of this letter and its enclosure will be placed in the NRC Public Document
Room.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
'
M Director
-
Division of Reactor Safety
Enc 1csure: (see next page)
'
9301260114 930122 5 8
ADOCK 0500
gDR
i
- . . . . - . . _ , m. . - _ - , . . . . - . _. _ . . . . , ,,
. _ __._ __ _ _ . . _ - . ._ _ . _ _ _ _ . _ . .__ ___
.' e'
.
.
!
10 Electric -2- j
,
I
Enclosure:
Appendix - NRC Inspection Report .
- ,
50-445/93-01 w/ Attachments
50-446/93-01 w/ Attachments
cc w/ enclosure: ,
'
TU Electric
<
ATTN: Roger D. Walker, Manager of
Regulatory Affairs for Nuclear
Engineering Organization
Skyway Tower
400 North Olive Street, L.B. 81
Dallas, Texas 75201
Juanita Ellis
President - CASE
1426 South Polk Street
Dallas,-Texas 75224
GDS Associates, Inc. :
Suite 720
1850 Parkway Place
Marietta, Georgia 30067-8237
TV Electric
'
Bethesda Licensing
3 Metro Center, Suite 610
i Bethesda, Maryland 20814 1
'
Jorden, Schulte, and Burchette
t
ATTN: William A. Burchette, Esq.
l Counsel for Tex-La Electric
l Cooperative of Texas
1025 Thomas Jefferson St., N.W.
'
=
Washington, D.C. 20007
Newman & Holtzinger, P.C.
ATTN: Jack R. Newman, Esq.
1615 L. Street, N.W.
Suite 1000- t
Washington, D.C. 20036
Texas Department _of Licensing-&_ Regulation
i ATTN: G.- R. Bynog, Program Manager /
L
Chief-Inspector
Boiler Division
P.O. Box 12157, Capitol Station :
,
b
4
- - . __ -_. .. _. __ _ . _ _ _ _ _
.
.- -
.
.
- a
.
10 Electric- - 3-
Honorable Dale McPherson
County Judge
P.O. Box 851 '
- Glen' Rose,' Texas 76043
Texas Radiation Control Program Director
1100 West 49th Street
,
Owen L. Thero, President
Quality Technology Company ;
Lakeview Mobile Home Park, Lot 35
4793 E. Loop 820 South
fort Worth, Texas 76119
,
,
4
.
Y'
r
i
.
1
mer'-' T 't '- rrr----y
-
e 'w-v <v i n w vm -w --i <r, g g< +-=c-+[w,- * e ny-, w w y< - ww.cs.--,--,v -+ g rs -e r w- g * r -a -* ~ = w m e r- ---
_
4 !
3 '
t
. .
!
JAN 2 21993 !
'
1U Electric -4-
NRC Inspection Report 50-445/93-01; 50-446/93-01
[becto.DMB(IE01)-DRS j
i
bcc distrib. by RIV:
J. L. Hilhoan Resident Inspector (2) l
DRP Section Chief (DRP/B)
lisa Shea, RM/ALF, MS: MNBB 4503 Mis System l
DRSS-FIPS RSTS Operator !
Project Engineer (DRP/B) RIV file !
'
DRS Section Chief (DRP/TSS)
T. Stetka L. Ellershaw
P. Wagner
,
N A
TL:DRS b DRS/MS M MF DD:DRS[ D:DRE D:DRS
'
Pwagner LIlershaw DChamberlain ABBeNh SJCollins
i/21/93 J /2l/93 l /y2./93 1 /22/93 / /93
l 250054
!
.
._. - - - - . . _ _ _ - - _ _ - - - _ _ _ - . .
,' ..
4 I
JAN 2 21993
10 Electric -4-
NRC Inspection Report 50-445/93-01; 50-446/93-01
bec to DM8 (IE01) - DRS
bec distrib. by RIV:
J. L. Milhoan Resident inspector (2)
DRP Section Chief (DRP/B)
Lisa Shea, RM/Alf, MS: MNBB 4503 MIS System
DRSS-FIPS RSTS Operator
Project Engineer (DRP/B) RIV File
DRS- Section Chief (DRP/TSS)
T. Stetka L. Ellershaw
P. Wagner
N O
TL:DRS b DRS/MS M 69F DD:DRSM D:DRE 0:DRS
Pwagner LIlershaw DChamberlain ABucaEh SJCollins
I/2}/93 J /2(/93 L/t/93
j I /22/93 / /93
l
"
. . --. -