ML20132F770

From kanterella
Revision as of 06:11, 5 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-455/85-25 on 850716-0916.No Violation Identified
ML20132F770
Person / Time
Site: Byron Constellation icon.png
Issue date: 09/26/1985
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20132F773 List:
References
NUDOCS 8510010409
Download: ML20132F770 (2)


See also: IR 05000455/1985025

Text

'

.

September 26, 1985

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

~

This refers to the routine safety inspection conducted by Messrs. J. M. Hinds,

Jr. and K. A. Connaughton of this office on July 16 - September 16, 1985, of

activities at Byron Station Unit 2, authorized by NRC Construction Pennit No.'

CPPR-131 and to the discussion of our findings with Mr. V. I. Schlosser and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

~

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

~H

(, SL '

W *

R. F. Warni hief

Reactor Project Branch 1

Enclosure:

1. Inspection Report

No.50-454/85025(DRP)

cc w/ encl: See Distribution

8510010409 850926

PDR ADOCK 05000455

G PDR

RIII RIII RIII

@ RIII

RIII

ehm

p9/19/85 yA

e

ehy #r@ce

i

d3/fff

q

9f

.

.

.

Commonwealth Edison Company. -2- September 26, 1985

Distribution:

D. L. Farrar, Director

of Nuclear Licensing

. V. . I._ Schlosser, Project Manager

Gunner Sorensen, Byron Project

Construction Manager

R. E. Querio, Station

Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, Rill Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq..

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. 01shan, NRR LPM

!

,_ 1