IR 05000293/2014502
| ML14161A704 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/10/2014 |
| From: | Anthony Dimitriadis Plant Support Branch 1 |
| To: | Dent J Entergy Nuclear Operations |
| Dimitriadis A | |
| References | |
| IR-14-502 | |
| Download: ML14161A704 (10) | |
Text
Mr. John Dent, Site Vice President Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT: PILGRIM NUCLEAR POWER STATION: NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT 05000293/2014502
Dear Mr. Dent:
On May 2, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the April 30, 2014, evaluated emergency preparedness exercise at your Pilgrim Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed on May 2, 2014, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with Title 10 of the Code of Federal Regulation (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Anthony Dimitriadis, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No.: 50-293 License No.: DPR-35
Enclosure:
NRC Inspection Report No. 05000293/2014502
cc w/encl: Distribution via ListServ S. Coleman, RAC Chair, FEMA Region I June 10, 2014
SUMMARY OF FINDINGS
Inspection Report 05000293/2014502; 04/28/2014 - 05/02/2014; Pilgrim Nuclear Power Station; Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification.
This was an announced inspection conducted by five Region I-based inspectors and one headquarters-based inspector. No findings were identified during the inspection. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5.
Cornerstone: Emergency Preparedness
No findings were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone:
Emergency Preparedness (EP)1EP7 Exercise Evaluation - Hostile Action Event (71114.07 - 1 Sample)
a. Inspection Scope
Title 10 of the Code of Federal Regulations (10 CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Entergy designed the April 30, 2014, Pilgrim EP exercise to satisfy that requirement, and the NRC inspected the Pilgrim HA event exercise to assess Entergy's ability to effectively implement the Pilgrim Emergency Plan during an HA event. This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment:
- The adequacy of the Entergy ERO's performance in the biennial full-participation exercise regarding the implementation of the planning standards described in 10 CFR 50.47(b) (4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; onsite protective actions, and public protective action recommendations, respectively.
- The overall adequacy of Entergy's emergency response facilities with regard to Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Alternative Facility, the Central Alarm Station (CAS), the local law enforcement Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
- A review of other performance areas, such as the Entergy ERO's: recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Pilgrim Emergency Plan and its implementing procedures.
- A review of past performance issues from the last NRC Pilgrim exercise inspection report and recent Entergy Pilgrim EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the April 30, 2014, exercise and to ensure compliance with 10 CFR 50.47(b)(14).
- The licensee's post-exercise critiques, to evaluate Entergy's self-assessment of its Pilgrim ERO performance during the April 30, 2014, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified. 1EP8 Exercise Evaluation - Scenario Review (71114.08 - 1 Sample)
a. Inspection Scope
Prior to the April 30, 2014, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which Entergy had submitted to the NRC, to determine if the exercise would test major elements of the Pilgrim Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Pilgrim EP Performance Indicators (PI), which are:
(1) Drill and Exercise Performance (DEP) (EP01); (2) ERO Drill Participation (EP02);
and (3) Alert and Notification System (ANS) Reliability (EP03). The last NRC EP inspection at Pilgrim was conducted in the fourth calendar quarter of 2013, so the inspectors reviewed supporting documentation from EP drills and tests from the fourth calendar quarter of 2013 through the first calendar quarter of 2014, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 7. This inspection activity represented the completion of three samples.
b. Findings
No findings were identified.
4OA6 Meetings, including Exit
On May 2, 2014, the inspectors presented the results of this inspection to Mr. J. Dent, Pilgrim Site Vice President, and other members of the Entergy staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- J. Dent, Pilgrim Site Vice President
- M. Wilson, Entergy Emergency Planning Manager
- J. Parmenter, Pilgrim Emergency Planning Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
Section 1EP7: Exercise Evaluation - Hostile Action (HA) Event Pilgrim Nuclear Power Station Emergency Plan, Revision 40
- EP-IP-100, Emergency Classification and Notification, Revision 37
- EP-IP-210, Control Room Activation, Revision 9
- EP-IP-240, Emergency Security Organization Activation and Response, Revision 12
- EP-IP-260, Emergency Operations Facility (EOF) Operations, Revision 2
- Pilgrim Emergency Plan lmplementing Procedures Pilgrim April 30, 2014, Emergency Exercise Scenario Package Pilgrim Emergency Preparedness Drill Reports, January 2013 - April 2014 Condition Reports generated as a result of the April 30, 2014, exercise (As documented in "April 30, 2014, Pilgrim Station Hostile Action Based (HAB) Exercise Report", dated May 28, 2014)
Section 1EP8: Exercise Evaluation - Scenario Review Pilgrim Nuclear Power Station Emergency Plan, Revision 40 Pilgrim April 30, 2014, Emergency Exercise Scenario Package
Section 4OA1: Performance Indicator (PI) Verification
- EN-FAP-EP-005, Fleet Administrative Procedure Emergency Preparedness Performance Indicators, Revision 0
- EN-LI-114, Performance Indicator Process, Revision 6
- Attachment
LIST OF ACRONYMS
PI Performance Indicator