1 AC Sources-0perating 3.8.1 i SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.1.14 0 -------------------NOTES---------- =----
- 1. Momentary transients outside the load and power factor ranges do not invalidate this test.
- 2. Credit may be taken for unplanned events that satisfy this SR.
Verify each DG, when operating with the 24 months maximum kVAR loading permitted during !
testing, operates for 2 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
- a. For 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4935 kW and s 5170 kW; and
- b. For the remaining hours of the test loaded 2 4450 kW and s 4700 kW. )
l
) SR 3.8.1.15 # ------------- --NOTES------------ ---
- 1. This Surveillance shall be performed j within 5 minutes of shutting down the DG after the DG has operated 2 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> loaded 2 4450 kW and s 4700 kW.
Momentary transients outside of load range do not invalidate this test.
- 2. All DG starts may be preceded by an engine prelube period.
_==---==__________________________________
Verify each DG starts and achieves, in 24 months s 10 seconds, voltage 2 3924 V and s 4796 V, and frequency 2 58.8 Hz and s 61.2 Hz; and operates 2 5 minutes.
(continued)
)
SAN ON0FRE--UNIT 3 3.8-11 Amendment No. 116 9701140350 970113 PDR ADOCK 05000362 P PDR
4
- AC Sources - Operating i 3.8-11 4
9 This SR is not applicable until return to Mode 4 from the Unit 3 Cycle 9 refueling outage. Until that time the following SR is applicable:
Verify the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During the i first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to greater
- than or equal to 5170 kw and during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, I the diesel generator shall be loaded to greater than or equal to 4700 kw. )
The generator voltage and frequency shall be 4360
- 436 volts and 60
- 1.2 1 Hz after the start
- signal; the steady state generator voltage and frequency shall be maintained at 4360
- 436 volts and 60+1.2/-0.3Hz
. for the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test and 4360
- 436 volts and 60
- 1.2 Hz during the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test.
s
- The engine start for the purpose of this surveillance test may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the engine is minimized.
i i This SR is not applicable until return to Mode 4 from the Unit 3 Cycle 9 Refueling Outage. Until that time the following SR is applicable:
Within 5 minutes after completing the 24-hour test, simulate a loss of offsite power by itself, and verify the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds and operates for greater than or equal to 5 minutes while its generator is loaded with the permanently connected loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4360 1 436 volts and 60 1 1.2 Hz during this test.
SAN ON0FRE -- UNIT 3 3.8-11a AMENDMENT NO.