IR 05000373/2018010

From kanterella
Revision as of 19:12, 15 February 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Ltr 01/11/18 LaSalle County Station, Units 1 and 2 - Information Request for an NRC Triennial 10 CFR 50.59 Baseline Inspection; Inspection Report 05000373/2018010; 05000374/2018010 (DRS-A.Dahbur)
ML18012A585
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/11/2018
From: Dahbur A K
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018010
Download: ML18012A585 (7)


Text

January 11, 2018

Mr. Bryan Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 BASELINE INSPECTION; INSPECTION REPORT 05000373/2018010; 05000374/2018010

Dear Mr. Hanson:

On April 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of the Code of Federal Regulations (CFR), Part 50.59 Baseline Inspection at the LaSalle County Station, Units 1 and 2. This inspection will be performed in accordance with the NRC Baseline Inspection Procedure 71111.17T. The onsite portions of the inspection will take place on April 26, 2018. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc and delivered to the regional office no later than February 16, 2018. The inspection team will review this information and, by February 23, 2018, will request specific items that should be provided for review in the regional office by March 16, 2018. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by March 16, 2018, as identified above. The remaining documents should be available by the first day of the onsite inspection, April 2, 2018. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for this inspection is Ms. Shakeeta Lickert of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9810 or via e-mail at Alan.Dahbur@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR

Sincerely,/RA Atif Shaikh Acting for/ Alan Dahbur, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket Nos. 50373; 50374 License Nos. NPF11; NPF18

Enclosure:

Document Request for 10 CFR 50.59 Baseline Inspection cc: Distribution via LISTSERV