ML20135H721

From kanterella
Revision as of 05:16, 1 July 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Forwards Insp Rept 50-458/85-29 on 850401-0709 & Notice of Violation.W/O Notice of Violation
ML20135H721
Person / Time
Site: Harris, River Bend Entergy icon.png
Issue date: 09/17/1985
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
GULF STATES UTILITIES CO.
Shared Package
ML20135H722 List:
References
NUDOCS 8509240161
Download: ML20135H721 (2)


See also: IR 05000458/1985029

Text

. _ _ _ _ ~ .

'

,

.

SEP 171985

In Reply Refer To:~

Docket: 50-458/85-29

Gulf States Utilities

ATTN: William J. Cahill, Jr.

Senior Vice President-

River Bend Nuclear Group

. P. O. Box 2951

Beaumont, Texas 77704

Gentlemen:

This refers to the-inspection conducted by Messrs. L. E. Ellershaw and

D. P. Tomlinson of this office during the period April 1-July 9,1985, of

activities authorized by NRC Construction Permit CPPR-145 for River Bend Unit 1,

and to the discussion of our findings with you and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection included safety-related heating, ventilating,

and air conditioning systems, and verification of as-built structural steel

connections. Within these areas, the inspection consisted of selective

examination.of procedures and representative records, interviews with

personnel, and observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection it.was found that' certain activities under your license

appeared to be in violation of NRC requirements. The one violation reported in 1

Paragraph 2 of the enclosed inspection report was identified as a . Severity

Level. IV Violation and forwarded to you by our letter dated August 2,1984.

During this inspection, it was determined that corrective actions had been.-

c_ompleted on this violation, therefore, this letter does not require further

written response.

.

,

.,-

RIV:RSB - RP RSB/0Sh RPB/RRSA 'RS RPB

LEllershawflw DPToMlinson DMHunnicutt .JJAudon DRH ter EHJohnson

q/)\/85 dl/tt/85 q/ll/85 - g @/85 - Q /g85 j/(L/85

0

8509240161 85091748 Q

\.

ADOCK O

{DR

,

. . - .. -

d

J

. .-

,

.

-2-

1

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you,

i

Sincerely,

-

Crrginal signed By.

E. H. Johnson

E. H.. Johnson, Chief-

l Reactor Projects Branch

Enclosures: .

? l' ' Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report .

'

~

'

50-458/85-29

.cc w/ enclosures:

Gulf States Utilities .

ATTN: J. E. Booker, Manager-

Engineering, Nuclear

Fuels & Licensing

P. O. Box 2951 .

Beaumont, Texas 77704

Louisiana State University, _.

Government Documents Department

Louisiana' Rad'iat. ion Control Program Director-

! bec to DMB~(IE01) ,

.

bcc distrib. by RIV:

"

  • RP8 R. P. Denise, DRSP-
.*Resident Inspector R. D. Martin, RA

' *Section Chief (RP8/A) *D.. Weiss, LFMB (AR-2015) -

  • MIS. System RSB
  • RSTS Operator L. Ellershaw
  • EP&RPB D. Tomlinson
  • RIV File

.

  • w/766

2- .

r

.

T

'

I

_

,. - - , , - - . - , , , , , , , - , , ,, . .(-. -n a,. ,, , ---