ML20148H332

From kanterella
Revision as of 12:19, 23 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-445/87-33 & 50-446/87-25 on 871202-880105.No Violations or Deviations Noted
ML20148H332
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/21/1988
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20148H335 List:
References
NUDOCS 8801270200
Download: ML20148H332 (5)


See also: IR 05000445/1987033

Text

-

(4.. .

.

.

JAN 2 I l988

In Reply Refer To:

Dockets: 50-445/87-33

-50-446/87-25

TU Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

Gentlemen:

This refers to the inspection conducted by Mr. P. C. Wagner during

the-period December 2, 1987, through January 5, 1988, of activities

authorized by NRC Construction Permits CPPR-126-and CPPR-127 for

the Comanche Peak Steam Electric Station, Units 1 and 2, and to the

discussion of our findings with Messrs. L. D. Nace, A. B. Scott,

and other members of your staff at the conclusion of'the inspec-

tion.

The enclosed copy of our inspection' report identifies areas exam-

ined during the inspection. Within these areas, the inspection .

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspec-

tors.

Within the scope of the inspection, no violations or deviations.

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

bHIGINAL SIGhTD BY R. F. VINNICT

8801270200

DR 880121

O ADOCK 05000445 R. F. Warnick, Assistant Director

PDR for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure: Inspection Report-50-445/87-33; 50-446/87-25

(

cc w/ enclosure: See nex page

'

IP:CPP SP IP:CP OSP AD:IP:CPPD:OSP f

PWagner HLivermore RWarnickfh>  ;

1/g( /88 1/31/88 1/21/88

'

.

S

' ' #4 "49

UNITED STATES

'

[ 4't NUCLEAR REGULATORY COMMISSION

$  ; WASHINGTON, D. C. 20555

\,

.....

/ JAN 21 1988

In Reply Refer To:

Dockets: 50-445/87-33

50-446/87-25

TO Electric

ATTN: Mr. W. G. Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

1

Gentlemen:

This refers to the inspection conducted by Mr. P. C. Nagner during

the period December 2, 1987, through January 5, 1988, of activities

authorized by NRC Construction Permits CPPR-126 and CPPR-127 for

the Comanche Peak Steam Electric Station, Units 1 and 2, and to the

discussion of our findings with Messrs. L. D. Nace, A. B. Scott,

and other members of your staff at the conclusion of the inspec- l

tion. l

The enclosed copy of our inspection report identifies areas exam-

ined during the inspection. Within these areas, the inspection  !

consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the inspec- l

tors.

Within the scope of the inspection, no violations or deviations

were identified.

In accordance with 10 CFR 2.790 of the Commission's regulations, a

copy of this letter and the enclosed inspection report will be

placed in the NRC.Public Document Room.

Should you have any questions concerning this inspection, we will

be pleased to discuss them with you.

Sincerely,

RF u)anwA

R. F. Warnick, Assistant Director

for Inspection Programs

Comanche Peak Project Division

Office of Special Projects

Enclosure: Inspection Report 50-445/87-33; 50-446/87-25

cc w/ enclosure:

See next page

_ ________ _________ .

.

'

.

,' TU Electric

cc w/ enclosure:

Roger D. Walker Bureau of Radiation Control

Manager, Nuclear Licensing State of Texas

Texas Utilities Electric Company 1100 West 49th Street

Skyway Tower Austin, TX 78756

400 North Olive Street, L.B. 81

Dallas, TX 75201 Nancy H. Williams

CYGNA Energy Services

Juanita Ellis Suite 390

President - CASE 2121 N. California Blvd

1426 South Polk Street Walnut Creek, CA 94596

Dallas, TX 75224

Thomas G. Dignan, Jr.

Renea Hicks, Esq. Ropes & Gray

Assistant Attorney General 225 Franklin Street

Environmental Protection Division Boston, MA 02110

P.O. Box 12548, capitol Station

Austin, TX 78711-2548 Robert A. Wooldridge, Esq.

Worsham, Forsythe, Sampels

Administrative Judge Peter Bloch and Wooldridge

U.S. Nuclear Regulatory Commission 2001 Bryan Tower

Washington, DC 20555 Suite 2500

Dallas, TX 75201

Elizabeth B. Johnson

Administrative Judge Mr. Homer C. Schmidt

Oak Ridge National Laboratory Director of Nuclear

Post Office Box X, Building 3500 Services

Oak Ridge, TN 37830 TU Electric

Skyway Tower

Dr. Kenneth A. McCollom 400 N. Olive St., L.B. 81

1107 West Knapp Dallas, TX 75201

Stillwater, OK 74075

Mr. Robert E. Ballard, Jr.

Dr. Walter H. Jordan Director of Projects

c/o Carib Terrace Motel Gibbs and Hill, Inc.

522 N. Ocean Boulevard 11 Penn Plaza

Pompano Beach, Florida 33062 New York, NY 10001

Anthony Z. Roisman, Esq. Mr. R. S. Howard

Suite 600 Westinghouse '.lectric

1401 New York Avenue, N.W. Corporation

Washington, DC 20005 Post Office Box 355

Pittsburgh, PA 15230

Ms. Billie Pirner Garde, Esq.

Government Accountability Project Lanny A. Sinkin

Midwest Office Christic Institute

104 East Wisconsin Avenue 1324 N. Capitol Street

Appleton, WI 54911 Washington, DC 20002 l

.. ..

..

_ _ _ _ _ _ _

. _ _ - - _ _ _ - _ -

'

,

TU Electric

.

cc w/ enclosures (continued)

David R. Pigott, Esq. Jack R. Newman, Esq.

Orrick, Herrington & Sutcliffe Newman & Holtzinger, P.C.

600 Montgomery Street 1615 L Street, N.W.

San Francisco, CA 94111 Washington, D.C. 20036

Robert Jablon

Bonnie S. Blair

Spiegel & McDiarmid

1350 New York Avenue, NW

Washington, DC 20005-4798

George A. Parker, Chairman

Public Utility Committee

Senior Citizens Alliance of

Tarrant County, Inc.

6048 Wonder Drive

Fort Worth, TX 76133

Joseph F. Fulbright

Fulbright & Jaworski

1301 McKinney Street

Houston, TX 77010

Mr. Jack Redding

c/o Bethesda Licensing

TU Electric

3 Metro Center, Suite 610

Bethesda, MD 20814

William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

Heron, Burchette, Ruckert &

Rothwell

suite 700

1025 Thomas Jefferson St., NW l

Washington, DC 20007 '

James P. McGaughy, Jr.

GDS Associates, Inc.

Suite 720

1850 Parkway Place

Marietta, GA 30067 '

Regional Administrator, Region IV

U.S. Nuclear Regulatorf Commission

611 Ryan Plaza Drive, Suite 1000

Arlington, Texas 76011

_ _ _ _

- - ._

'

,

e

.

DISTRIBUTION:

'

- D6dksETFiles 3( S0R445/446)"'

NR C ~ PDR *"~"'" "" " "" "#

Local PDR

OSP Reading

CPPD-LA

. CPPD Reading (HQ)

  • Site Reading
  • CPRT Group '
  • SRI-OPS
  • SRI-CONST

AD for Projects

  • MIS System, RIV
  • RSTS Operator, RIV

RPB, RIV

RIV Docket File

  • DWeiss, RM/ALF

JTaylor

SEbneter/JAxelrad

CGrimes

PMcKee

JLyons

AVietti-Cook

MMalloy

JMoore, OGC

JGilliland, RIV

FMiraglia

EJordan

JPartlow

BHayes

  • w/766

i

l

I

1

l

l

.

i

i

l

~ - -- - 4 y *I~