Text
.
r*
February 14, 1997
Carciira Power & Light Company
ATTN: Mr. W. R. Campbell
Vice President
Brunswick Steam Electric Plant
P. 0. Bex 10429
Southpart, NC 28461
SUBJECT: NRC INTEGRATED INSPECTION REPORT NOS. 50-325/96 18, 50 324/96 18
Dear Mr. Campbell:
On January 18, 1997, the NRC completed an inspection at your Brunswick reactor
facility. The enclosed report presents the results of that inspection.
During the six weeks covered by this inspection period, our ins)ectors found
that your staff generally took a safety conscious approach to t1e activities
conducted at the Brunswick plant. We are concerned, however, about two
violations of NRC requirements that were identified. The first example was
for failure to have properly calibrated test gauges during performance of a
required surveillance test on an emergency core cooling system. We are
concerned because accurate test data is necessary to ensure proper system
operation. The second violation was for failure to include several systems
used in Emergency Operating Procedures into the Maintenance Rule program. We
are concerned that systems relied upon in an emergency perform properly.
These violations are cited in the enclosed Notice of Violation and the
circumstances surrounding the violations are described in detail in the
enclosed report. Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
9702250146 970214
PDR ADOCK 05000324 !1
G PDR
,l0
l
M
.. __ _ .. . - - ---.
1
,-
,
CP&L 2
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of l
this letter and its enclosures will be placed in the NRC Public Document Room t
(PDR).
'
Sincerely,
!
OdelanlaissedbyM.a. ale =1oa, j
1
Milton B. Shymlock, Chief !
Reactor Projects Branch 4 i
Division of Reactor Projects l
Docket Nos. 50-325 and 50 324 i
License Nos. DPR 71 and DPR 62
1
Enclosures: 1. Notice of Violation
2. NRC Inspection Report
cc w/encis-
W. Levis, Director >
Site Operations 1
Brunswick Steam Electric Plant
P. O. Box 10429 ;
Southport, NC 28461
.
R. P. Lopriore :
Plant Manager l
Brunswick Steam Electric Plant ;
Carolina Power & Light Company l
P. O. Box 10429
Southport, NC 28461 :
i
J. Cowan, Vice President
'
Operations & Environmental
Support MS OHS 7 ,
Carolina Power & Light Company l
P. O. Box 1551 l
Raleigh, NC 27602
Gerald D. Hicks ;
Manager - Regulatory Affairs i
Carolina Power & Light Company l
P. O. Box 10429 l
Southport, NC 28461 !
'
(cc w/encls cont'd See page 3)
l
.. . . - . . - - ..- _ _. _ .. . -, .
f
CP&L 3
(cc w/encls cont'd)
W. D. Johnson, Vice President
and Senior Counsel ,
Carolina Power & Light Company
P. O. Box 1551
Raleigh, NC 27602 ,
Dayne H. Brown, Director
Division of Radiation Protection j
N. C. Department of Environmental -
Health & Natural Resources l
P. O. Box 27687 I
Raleigh, NC 27611-7687
Karen E. Long I
Assistant Attorney General '
State of North Carolina
P. O. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh NC 27626 0520
Public Service Commission !
State of South Carolina l
P. O. Box 11649
Columbia, SC 29211
1
Jerry W. Jones, Chairman ,
Brunswick County Board of 1
Commissioners
P. D. Box 249 ,
Bolvia, NC 28422 l
Dan E. Summers
Emergency Management Coordinator
New Hanover County Department of
Emergency Management
P. O. Box 1525 ,
Wilmington, NC 28402 1
i !
William H. Crowe, Mayor l
City of Southport
201 East Moore Street
i Southport, NC 28461
! (Distribution w/encls - See page 4)
!
. _ __ _ . _ _ _ _ . _ _ _ __ . _ __ _ . _
t
.
4
t
CP&L 4
Distribution w/encls: ,
M. Shymlock, RII :
D. Trimble. NRR i
M. N. Miller, RII !
R. Aiello, RII
J. Lenahan, RII .
W. Rankin, RII '
D. Thompson, RII .
PUBLIC
i
NRC Resident Inspector i
U.S. Nuclear Regulatory Commission ;
8470 River Road, SE :
Southport, NC 28461 !
i
i
I
r
I
i
<
!
,
i'
l
1
- (See previous concurrence) ,
I
j
OFFICF RfI DRP R1Y:DRP Pff:DRP Rff:DRP
h of
~
SIGNATURE , , ,
, hAME GWiseman:ser CPatterson MJanus EBrown
DATE 02 / /E / 97 02 / / 97 02 / / 97 02 / 97 02 / / 97 02 / / 97
COPY? [YES) NO YES NO YES NO YES NO YES NO YES NO
]
i Utt1C11 KELUKU COPY DOCUMLNI NAM:. G: \BRU\IRCUFR\9618
s
R
.- - - - . . - - . . - _ . - .. - . . .. - _ -. - - __ __ - - _
30 d T101
i
'
1
CP&L 4
f
Dist ibution'rb mcis:
'
M. S1ymlock, 11,
D. Trimble, NRR l
M. N. Miller. RII
.
!
! R. Aiello, RII
'
J. Lenahan. RII
W. Rankin, RII
D. Thompson, RII
PUBLIC
l lRC Resident Inspector
j U.S. Nuclear Regulatory Commission
8470 River Road. SE
j Southport, NC 28461 :
1
i l
'
I i'
i
t
.
i
!
.
I
_
af f ts _.. Ef f n&9
Rfftmp tit fAP
WF1ff
$196AM
un ee n.n;se- v <saw & & 02 / / 97
02 / Q/ 97 et / / 97
/ 97 02 / 1 1 / 97 32 / / 4 / 97
02 / no
DATE
YE1 m (% m vts (Noh its M Yts no its
COPYT
urrus mww uri = = m we:: r.:umuum.wxweis x '