Text
- __ _ _ _ _ . _ _ , . --
_ _ _ . - . ...m . __ _. ___ _, __ _ _ . . _ __ _
- (g n.cNm . WDM
'- jo, UNITED STATES 8; .s , g NUCLEAR REGULATORY COMMISSION g : E WASHINGTON. D. C. 20555
.. s s- s / 's
- FEB 11198:
Docket No. 50-361/362 MEMORANDUM FOR: Robert L. Tedesco, Assistant Director for Licensing Division of Licensing FROM: Vincent S. Noonan, Assistant Director for Materials & Qualifications Engineering Division of Engineering
SUBJECT:
FIRE PROTECTION SAFETY EVALUATION REPORT -
SAN ONOFRE NUCLEAR GENERATING STATIONS Plant Name: San Onofre Nuclear Generating Stations, Units 2 and 3 Docket Numbers: 50-361/362 Licensing Stage: OL Milestone Number: N/A Responsible Branch: LB-3 Project Manager: H. Rood Chemical Engineering Reviewer: G. Harrison Requested Completion Date: N/A Review Status: Complete Enclosed is the fire protection section of the Safety Evaluation Report' of the San Onofre Nuclear Generating Station Units 2 and 3. The Fire Protection Program was reviewed in accordance with Appendix.A to Branch Technical Position ASB 9.5-1.
The Fire Protection Program will be implemented prior to initial fuel load-ing. The applicant has installed alternate shutdown panels to assure safe cold shutdown without reliance on the cable spreading room, the control room, the zone 5 cable riser gallery or the ESF Switchgear Room. Based on our review, we find that the applicant's fire protection program with
' improvements to be made before fuel load will meet the guidelines of Appendix A to Branch Technical Position APCSB 9.5-1, meets General Design Criterion 3, and is, therefore, acceptable.
j W p Vincent S. Noonan, Assittant Director for Materials & Qualifications Engineering Division of Engineering Encicsure: As stated
Contact:
G. Harrison cc: Next page ,
3
\
Q') o 3u %0L7] m q :
~. - J .
I.
......__2.__. -
j .
m~~~? 1 *~B?
j Rcbert L. Tedesco .
e cc: R. Vollmer V. Noonan V. Benaroya R. Ferguson S. Hudson '
H. Rood G. Harrison O
9 0
4 e