ML20136G664

From kanterella
Revision as of 23:09, 18 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summarizes 840921 Telcon W/Util Re Proposed Meeting Between Util & Commission on 841004.Meeting Will Be Rescheduled If Util Desires
ML20136G664
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 09/21/1984
From: Plaine H
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To: Asselstine, Palladino, Roberts
NRC COMMISSION (OCM)
Shared Package
ML20136F570 List:
References
FOIA-84-885 NUDOCS 8508190596
Download: ML20136G664 (1)


Text

*~* _. .. _- -

o,

/ ',

UNITED STATES

,*h ,

tgqfr Q'a E NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C 20555 I)

%, . .*.# .f f September 21, 1984 MEMORANDUM FOR: Chairman Palladino !

Commissioner Roberts Commissioner Asselstine Commissioner Bernthal Comissioner Zech FROM:

Herzel H. E. Plaine General Counsel i

SUBJECT:

SAN ONOFRE UNIT 1 I called the local Southern California Edison Company Vice-President Ken Baskin, to suggest that if Southern California Edison with them on October 4, 2:00 p.m. wanted a meeting with the Commission but if it appeared desirable at a later time, would I make a suggested that the request be in writing.

I asked him if he would notify Congressmen Packard and Badham that the Company was not seeking such a reeting at this time.

He said he would.

with the Comission.

the Chairman, and possibly similar meetings with other I told him that t'ie Commission had taken the position that such individual meetings were not a good idea, but that the Commission, asaaCorrriission at whole, would be pleased to accomodate the Company and discuss problems meeting.

cc: W.J. Dircks, EDO OPE SECY l

l l

l l

I 0500t%o*050700 i<

pijn gau.ea- fC{ i; n